Winter Sale - Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dpm65

WELL-AP WELL Accredited Professional (WELL AP) Exam Questions and Answers

Questions 4

A WELL AP is working on a renovation project in an existing building that is suspected to contain lead paint.

To confirm that the paint contains lead, the WELL AP requests in-situ testing. Which one of the following types of tests is acceptable to confirm the lead hazard?

  • X-ray fluorescence (XRF)
  • Polarized light microscopy (PLM)
  • Transmission electron microscopy (TEM)

Options:

A.

NIOSH Manual of Analytical Methods (MNAM) Method 7400

Buy Now
Questions 5

A project successfully received both LEED® and BREEAM® certification. The project's WELL Certification is managed by two WELL APs. How many additional points would the project need to achieve the full score under Innovation?

Options:

A.

Two points

B.

Three points

C.

Four points

D.

Five points

Buy Now
Questions 6

A client would like to gather thermal comfort data at her office building. According to Feature T06: Thermal Comfort Monitoring, Part 1: Monitor Thermal Environment, which of the following strategies should the WELL AP recommend?

Options:

A.

Provide individual control over thermostats

B.

Install CO2 sensors in regularly occupied areas

C.

Monitor dry-bulb temperature and relative humidity

D.

Record mean radiant temperature and air movement

Buy Now
Questions 7

Please click on the Project Scenario A button to review the project scenario and answer the following question.

MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A

MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their

primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.

They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.

Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx. 328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.

MILO considers itself a human-centric design firm and leads with a people-first approach through its

employee benefits and organizational policies. As an example, they offer a 50% discount on several

mindfulness apps and make guided meditation courses available twice per year to all employees on-site.

PROJECT SCOPE & GOALS

MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.

The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.

MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.

Furniture is acquired for 45 employees what is the minimum number of manual or electric height -adjustable work surfaces needed to meet Feature V02: Ergonomic Workstation Design. Part 2 Provide Height-Adjustable Work Surfaces?

Options:

A.

10 height-adjustable work surfaces

B.

11 height-adjustable work surfaces

C.

12 height-adjustable work surfaces

D.

13 height adjustable work surfaces

Buy Now
Questions 8

An employer will be leasing a new building that has one central space for a cafeteria. Which of the following conditions should the employer look for in order to comply with Feature N08: Mindful Eating?

Options:

A.

Cup volume is 8 fl oz (240 ml)

B.

Menu design includes promotion of fruits and vegetables

C.

Foods and beverages provided are labeled for common food allergens

D.

Tables and chairs to accommodate at least 25% of regular occupants at peak occupancy

Buy Now
Questions 9

An owner of a new commercial office building is interested in achieving Feature N08: Mindful Eating. What space would need to be included and what is the maximum allowable distance from the project boundary?

Options:

A.

Multi-use lounge within 500 ft. (152 m) walking distance of the project boundary

B.

Multi-use lounge within 650 ft. (200 m) walking distance of the project boundary

C.

Dedicated eating areas within 500 ft. (152 m) walking distance of the project boundary

D.

Dedicated eating areas within 650 ft. (200 m) walking distance of the project boundary

Buy Now
Questions 10

Which of the following filters can assist with the removal of organic chemicals from water intended for human consumption?

Options:

A.

Carbon

B.

HEPA.

C.

MERV

D.

Sediment

Buy Now
Questions 11

A project team performed quarterly water testing and determined that the total dissolved solids (TDS) is above the 500 mg/L threshold. Which of the following steps should the project team take to address this issue?

Options:

A.

Remediate and retest within one month

B.

Increase the number of sample points and retest

C.

Provide additional tests from highest and lowest floors

D.

Pretest one month before next performance verification

Buy Now
Questions 12

The office manager has received several complaints that staff who use the boardroom can clearly hear and understand conversations that take place in the adjacent corridor. What is the likely cause of this acoustic issue?

Options:

A.

Exposed soffits in the corridor

B.

Hollow core door separating me spaces

C.

Timber flooring installed in the boardroom

D.

Water pipes that run through the boardroom and corridor

Buy Now
Questions 13

Which of the following chemicals can be added to the public water supply to act as a disinfectant?

Options:

A.

Fluoride

B.

Chlorine

C.

Trihalomethanes

D.

Haloacetic acids

Buy Now
Questions 14

A developer wants to complete WELL Certification quickly for a WELL Core office building. The WELL documentation is approved for the project, the base building is complete, but the building is not yet occupied. Which step should the project team take first to address the developer's goal?

Options:

A.

Apply for the certificate of occupancy (CO)

B.

Determine the schedule for the tenants finish-out and move-in

C.

Inform the developer that performance verification requires at least 50% occupancy

D.

Schedule performance verification since all pre-verification requirements are

Buy Now
Questions 15

The production of polychlorinated biphenyls (PCBs) has been widely restricted, as they are

Options:

A.

biocides that can leach into the environment

B.

carcinogens that bioaccumulate in the environment

C.

total dissolved solids that accumulate in the environment

D.

volatile organic compounds that off-gas into the environment

Buy Now
Questions 16

A WELL AP is reviewing a client's waste management plan for Feature X09: Waste Management. Which key requirement must be confirmed?

Options:

A.

Recycling containers are paired with waste receptacles

B.

Food waste is collected for on-site or off-site composting

C.

Protocols for managing and minimizing hazardous waste are included

D.

Cardboard, glass, paper, plastic and metals are collected for recycling

Buy Now
Questions 17

Which of the following are short-term effects of poor indoor air quality?

Options:

A.

Headaches, dry throat, eye irritation and runny nose

B.

Respiratory infections, coronary heart disease and stroke

C.

Asthma attacks, lung cancer and sudden infant death syndrome

D.

Depression, dementia, metabolic disorders and high blood pressure

Buy Now
Questions 18

A financial service office is undergoing renovation and would like to provide nature access to its employees. Which of the following should the design loam include for regular occupants to access to moot Feature MO9 Enhanced Access to Nature?

Options:

A.

An outdoor sculpture located within 50 ft. (15 m) of conference rooms.

B.

An outdoor space of an area of at least 5% of the project interior area

C.

At least 50% of the accessible outdoor spaces with a direct view of plants

D.

A green wall within a direct line of sight for at least 50% of all workstations

Buy Now
Questions 19

What type of test should a building owner use to assess the building envelope's performance in regard to moisture protection?

Options:

A.

Water pH test

B.

Isotope tracing

C.

Air tightness test

D.

Mold spore sampling

Buy Now
Questions 20

For a project seeking WELL Certification, from which of the following professionals would a Letter of Assurance be required?

Options:

A.

Owner

B.

WELLAP

C.

Project Manager

D.

Sustainability Consultant

Buy Now
Questions 21

A project's site previously housed a fuel station and an automotive repair shop. Which strategy should the WELL AP recommend?

Options:

A.

Hire an experienced professional to perform an environmental site assessment

B.

Engage the local community to create a strategic approach about historical use of the site

C.

Inspect the site to see if any evidence of the fuel station or automotive repair shop remains

D.

Determine if the site is a recognized Brownfield or has a similar designation from the relevant authority

Buy Now
Questions 22

Which of the following most affects respiratory health?

Options:

A.

Polychlorinated biphenyls (PCBs)

B.

Volatile organic compounds (VOCs)

C.

Chromated copper arsenates (CCAs)

D.

Perfluorinated alkyl compounds (PFCs)

Buy Now
Questions 23

For projects to obtain WELL Certification at the Platinum level, what is the minimum number of points that must be achieved per concept?

Options:

A.

One point

B.

Two points

C.

Three points

D.

Four points

Buy Now
Questions 24

A design for a WELL building has a dry-bulb temperature and relative humidity monitoring system. To achieve Feature T06: Thermal Comfort Monitoring the project team must confirm that

Options:

A.

sensor readings are taken at least three times per hour

B.

sensors are installed for every 2,500 ft2 (232 m2) of occupiable floor area

C.

sensors are located in occupiable areas 3.6 to 5.6 ft. (1.1 to 1.7 m) above the floor

D.

sensors are placed at least 5 ft. (1.5 m) away from any significant source of heat or cold

Buy Now
Questions 25

In addition to Feature M02: Nature and Place, the installation of potted plants and an indoor water fountain could contribute to the achievement of which other features?

Options:

A.

Feature M01: Mental Health Promotion and Feature M07: Restorative Spaces

B.

Feature M07: Restorative Spaces and Feature M09: Enhanced Access to Nature

C.

Feature M01: Mental Health Promotion and Feature M08: Restorative Programming

D.

Feature M08: Restorative Programming and Feature M09: Enhanced Access to Nature

Buy Now
Questions 26

Which of the following hazardous materials is known to impair the intellectual development of children and the unborn during pregnancy?

Options:

A.

Load

B.

Arsenic

C.

Mercury

D.

Asbestos

Buy Now
Questions 27

For projects that include operable windows, which of the following outdoor air contaminants determine how window use should be managed?

Options:

A.

PM2.5

B.

PM10

C.

Ozone

D.

Carbon monoxide

Buy Now
Questions 28

What is the intent of the Feature N02: Nutritional Transparency?

Options:

A.

To avoid refined ingredients

B.

To encourage informed food choices

C.

To promote consumption of whole grains

D.

To limit sugar content in food and beverages

Buy Now
Questions 29

The guiding principle for promoting optimal circadian entrainment and sleep is

Options:

A.

sunlit days

B.

dim light at night

C.

continuous intense light

D.

periods of light and darkness

Buy Now
Questions 30

What is a key factor in promoting proper hydration?

Options:

A.

Verify 100% of all coffee dispensers are linked to clean drinking water

B.

Ensure at least 50% of water fountains report the number of plastic bottles saved

C.

Communicate about the importance of drinking 1 gal (3.79 l) of water every day

D.

Provide at least one drinking water dispenser within 100 ft. (30 m) of regularly occupied space

Buy Now
Questions 31

A well-being team in a commercial office building is interested in starting a garden. Twenty of the 400 employees are interested in starting an herb and vegetable garden. A minimum of how much space is required for the garden to earn an Optimization in the WELL Building Standard™ (WELL™)?

Options:

A.

20 ft2 (2 m2)

B.

200 ft2 (18 m2)

C.

400 ft2 (36 m2)

D.

600 ft2 (56 m2)

Buy Now
Questions 32

Supplemental light fixtures are provided to occupants upon request at no cost within a WELL building. This benefit will enhance occupant comfort by

Options:

A.

providing visual diversity

B.

improving correlated color temperature

C.

keeping lighting uniformity in the space

D.

increasing the light level on the task surface

Buy Now
Questions 33

Which of the following is an effective measure for a new construction project to reduce noise from nearby traffic?

Options:

A.

Alter the room geometry and space layouts

B.

Provide speech reinforcement and public address systems

C.

Suggest lightweight floor constructions below noise generating spaces

D.

Recommend high STC or Rw performance values for the building facade, windows and any exterior penetrations

Buy Now
Questions 34

The facilities management team of a project has ordered a cleaning product that can harm occupants' health. A review of the documentation shows that the team members were unaware of the cleaning plan at the time of the purchase. What is the most likely cause of the misunderstanding?

Options:

A.

Facilities management's goals were not discussed at the initial meeting

B.

Communication between project team and facilities management team was collaborative

C.

Project team expected the facilities management team had a clear understanding of the health and well-being goals

D.

Project goals for health and well-being were overlooked during the initial discussion with the facilities management team

Buy Now
Questions 35

A consultant on a WELL project is working with the design team to enhance speech privacy in conference rooms.

Which of the following would be most effective at maximizing speech privacy in these spaces?

Options:

A.

Provide acoustic ceilings in all meeting rooms

B.

Locate the meeting rooms adjacent to loud zones

C.

Propose mechanical ventilation instead of natural ventilation

D.

Recommend a sound masking system within the meeting rooms

Buy Now
Questions 36

The design team for a new office building protect is trying to achieve a point for Feature X08 Materials Optimization by selecting materials with enhanced chemical restrictions. They are preparing a list of products to submit to the owner for approval All of the selected products are inventoried to 100 parts per million (ppm). Which of the following products should the design team give priority to in order to achieve this point?

Options:

A.

Flooring product with a compound listed on the Living Building Challenge's Red List

B.

Ceiling tiles with a Health Product Declaration (HPD) published in the HPD Public Repository

C.

insulation that contains compounds listed in REACH Restriction Authorization and SHVC Lists

D.

Paint that meets the chemical thresholds in the Cradle to Cradle Basic Level Restricted Substances List. Version 4

Buy Now
Questions 37

Feature C07: Enhanced Health and Wellness Promotion requires projects to cultivate a culture of health through communication, health promotion programs and educational sessions. What is the minimum frequency required of these sessions?

Options:

A.

Weekly

B.

Monthly

C.

Quarterly

D.

Annually

Buy Now
Questions 38

There is evidence to suggest that environments with poor acoustics may lead to an increase in which of the following health impacts?

Options:

A.

Dementia

B.

Hypertension

C.

Insulin resistance

D.

Chronic inflammation

Buy Now
Questions 39

The project's property management team is discussing ways to keep indoor volatile organic compound (VOC) levels as low as possible after building occupancy. Which of the following strategies is most effective?

Options:

A.

Humidifiers in each regularly occupied space

B.

MERV 16 filters to treat outdoor air in each air handling unit

C.

Air purification devices including activated carbon filter and MLRV 14 filter

D.

Ultraviolet lamps to irradiate the surfaces of the cooling coils and drain pans

Buy Now
Questions 40

A design for a WELL building has HVAC zones of 650 ft2 (60 m2) and less than 10 occupants for more than 90% of regularly occupied spaces. This design

Options:

A.

personalizes thermal comfort when provided with a ceiling fan per zone

B.

negates off-gassing when provided with an increased outdoor air supply

C.

reduces mold and bacterial growth within the building's mechanical system

D.

enhances thermal comfort when used in conjunction with a user-adjustable tormontat

Buy Now
Questions 41

A small family-run business owned by an accredited nutritionist has noticed an increase in the number of processed foods brought in by employees for lunch. Which strategy could the WELL AP recommend at no additional cost to the client to meet the requirements of Feature N07 Nutrition Education?

Options:

A.

provide magazine in the breakroom with healthy recipes

B.

Replace plates and bowls in tweak room with smaller dishware

C.

Increase the availability of fruit and vegetables in the breakroom

D.

Offer individual dietary consultations by the accredited nutritionist owner

Buy Now
Questions 42

An architect wants to promote effective handwashing in a new hospital. What strategy should the architect use to meet WELL Feature W08 when specifying the bathroom lavatories?

Options:

A.

Ceramic countertops

B.

Sink basins of at least 9 in (23 cm) in width and length

C.

Water column from the faucet to the basin 5 in (13 cm) in length

D.

Water column no more than 2.5 in (6 cm) from the edge of the sink

Buy Now
Questions 43

At a local university, lecturers teaching in an auditorium receive feedback that students experience an echo during class.

The following is some basic information about the auditorium:

. There are a total of 200 fully upholstered seats (10 rows of 20 seats each)

. A fabric covered ceiling is installed, suspended 5 ft. (1.52 m) from the concrete slab above

. 50% of the floor is carpeted, with the other 50% bare concrete finish

. The walls are left as bare concrete

Which of the following design interventions would be most likely to reduce reverberation times in the auditorium?

Options:

A.

Remove the first row of seats

B.

Add a sound masking system

C.

Remove carpet to expose the slab floor

D.

Provide a fabric covering over the existing concrete walls

Buy Now
Questions 44

Which of the following references could be used for Feature L02: Visual Lighting Design, Part 1: Provide Visual Acuity?

Options:

A.

ISO 8995-1:2002

B.

AS 1668.4-2012

C.

ANSI S3.1-2018

D.

2019 CARB SCM

Buy Now
Questions 45

Which concept contains a feature designed to provide a written guide to building occupants to promote a deeper understanding of WELL features?

Options:

A.

Light

B.

Movement

C.

Community

D.

Thermal Comfort

Buy Now
Questions 46

To support meal preparation for occupants in an office building, which of the following strategies should the design team include for employees to meet Feature N10: Food Preparation?

Options:

A.

Demonstration kitchen

B.

Dining tables and chairs

C.

Sufficient gardening space

D.

Dedicated cabinets or storage units

Buy Now
Questions 47

A project team is pursuing Feature A08 Air Quality Monitoring and Awareness The installed air quality monitor density should at least be one sensor per

A)

WELL-AP Question 47

B)

WELL-AP Question 47

C)

WELL-AP Question 47

D)

WELL-AP Question 47

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Buy Now
Questions 48

Please click on the Project Scenario A button to review the project scenario and answer the following question.

MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A

MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their

primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.

They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.

Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx. 328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.

MILO considers itself a human-centric design firm and leads with a people-first approach through its

employee benefits and organizational policies. As an example, they offer a 50% discount on several

mindfulness apps and make guided meditation courses available twice per year to all employees on-site.

PROJECT SCOPE & GOALS

MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.

The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.

MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.

Which design element would need to be included to meet the requirements of Feature L05 Daylight Design Strategies. Part 2: Integrate Solar Shading?

Options:

A.

Task lighting at all workstations

B.

Manual screens/blinds controlled by occupants

C.

An illuminance ratio of at least 0.4 or 1:2.

D.

Target illuminance of fc (300 lux) for >50% of the unit area

Buy Now
Questions 49

What requirement within C02: Integrative Design includes communication about how implemented building operations, maintenance, programs and policies support adherence to WELL?

Options:

A.

Stakeholder charrette

B.

Stakeholder orientation

C.

Annual reporting documentation

D.

Education on at least two topics within the ten WELL concepts

Buy Now
Questions 50

For an office building with 1,500 regular occupants and 500 occasional visitors per day, which of the following facilities meets the requirements established in Feature V04: Facilities for Active Occupants?

Options:

A.

Seven showers with changing facilities and 45 lockers are available in the building

B.

Nine showers with changing facilities and 40 lockers are available in the building

C.

10 showers with changing facilities and 50 lockers are available within 500 ft. (150 m) walking distance of the project boundary

D.

12 showers with changing facilities and 50 lockers are available within 700 ft. (225 m) walking distance of the project boundary

Buy Now
Questions 51

Which thermal comfort parameter can be controlled by the use of automatic window shades?

Options:

A.

Air movement

B.

Relative humidity

C.

indoor air temperature

D.

Mean radiant temperature

Buy Now
Questions 52

The Brightside Company is pursuing WELL Certification under the WELL Building Standard™ for their new office headquarters. One company goal is to better support employees in making healthy eating choices, both at work and at home. What can the Brightside Company do to support and achieve credit under Feature N07: Nutrition Education Optimization?

Options:

A.

Encourage fruit and vegetable consumption over animal products

B.

Reward each employee with an annual stipend for healthy food purchases

C.

Implement a policy that requires 30-minute meal breaks for all eligible employees

D.

Provide quarterly nutrition education sessions with an accredited dietitian or nutritionist

Buy Now
Questions 53

For an office project lo earn one point in Feature L03 Orcadian Lighting Design what level of equivalent melanopic lux (EMI) needs to be achieved at workstations in regularly occupied spaces and which piano should the light be achieved on?

Options:

A.

At least 100 EML; measured on the vertical plane

B.

At least 150 EML; measured on the vertical vertical

C.

At least 100 EML; measured on the horizontal plane

D.

At least 150 EML; measured on the horizontal plane

Buy Now
Questions 54

Thermal Comfort is known to impact which of the following

Options:

A.

Productivity

B.

Chionic stress

C.

immune system

D.

Cardiovascular system

Buy Now
Questions 55

A well-being team in a commercial office building is interested in starting a garden. Twenty of the 400 employees are interested in starting an herb and vegetable garden. A minimum of how much space is required for the garden to earn an Optimization in the WELL Building Standard™ (WELL™)?

Options:

A.

20 ft2 (2 m2)

B.

200 ft2 (18 m2)

C.

400 ft2 (36 m2)

D.

600 ft2 (56 m2)

Buy Now
Questions 56

A WELL AP offers design guidance to support active occupants and visitors of a university project with a Bike Score® of 50. There will be approximately 100 peak visitors and 1.500 regular occupants in the building The WELL AP should advise that the university project provide

Options:

A.

a bike storage room with a storage capacity of 40 bikes that is located within the protect boundary

B.

a bike storage room with a storage capacity of 80 bikes that is located within the project boundary

C.

four public bike racks located within 200 ft. (60 m) of walking distance from the building's main entrance

D.

three public bike racks located within 100 ft. (30 m) of walking distance from the building's main entrance

Buy Now
Questions 57

The Project must provide which of the following pieces of information at registration?

Options:

A.

Project size

B.

List or design consultants

C.

Level of WELL Certification

D.

Target date for performance verification

Buy Now
Questions 58

Which strategy could a project pursue to meet requirements in a precondition in the Mind concept?

Options:

A.

Provide free clinical screenings

B.

Provide ongoing volunteer opportunities

C.

Provide free mindfulness programming. including in-person yoga or virtual meditation classes

D.

Provide educational material regarding healthy nutrition, including recipes and cooking methods

Buy Now
Questions 59

The WELL AP notices mold and fungal growth on some indoor walls and ceilings of enclosed regularly occupied spaces. Which of the following is the most likely cause of the mold and fungal growth?

Options:

A.

Ducts were not properly sealed and protected during the construction stage

B.

Commissioning Agent did not confirm that the ventilation rate exceeds 21 cfm/person (10 L/s)

C.

Sensors were not installed in occupiable spaces to monitor dry-bulb temperature and relative humidity

D.

Mechanical system does not have the capability of maintaining relative humidity between 30% and 60% at all times

Buy Now
Questions 60

What are possible impacts of poor lighting color rendering and flicker on people's health?

Options:

A.

Back and neck pain

B.

Itchy eyes, nose and throat

C.

Panic syndrome and burnout

D.

Impaired cognition and epileptic seizures

Buy Now
Questions 61

Please click on the Project Scenario A button to review the project scenario and answer the following question.

MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A

MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their

primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.

They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.

Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx. 328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.

MILO considers itself a human-centric design firm and leads with a people-first approach through its

employee benefits and organizational policies. As an example, they offer a 50% discount on several

mindfulness apps and make guided meditation courses available twice per year to all employees on-site.

PROJECT SCOPE & GOALS

MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.

The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.

MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.

Given the facade design, referenced in the protect scenario A, which feature is most appropriate for this project?

Options:

A.

Feature L04 Electric Light Glare Control

B.

Feature L05 Daylight Design Strategies

C.

Feature L06 Daylight Simulation

D.

Feature L09 Occupant Lighting Control

Buy Now
Exam Code: WELL-AP
Exam Name: WELL Accredited Professional (WELL AP) Exam
Last Update: Dec 10, 2024
Questions: 204

PDF + Testing Engine

$57.75  $164.99

Testing Engine

$43.75  $124.99
buy now WELL-AP testing engine

PDF (Q&A)

$36.75  $104.99
buy now WELL-AP pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 18 Dec 2024