Questions 4

Which of the following principles includes "working software is the primary measure of progress"?

Options:

A.

Agile Product Delivery

B.

Lean Portfolio Management

C.

Lean Thinking

D.

Agile Manifesto

Buy Now
Questions 5

What is the role of the System Architect/Engineer?

Options:

A.

To manage dependencies

B.

To implement continuous improvement methods

C.

To guide the teams and support the Architectural Runway

D.

To define the design for the system

Buy Now
Questions 6

Which of the core competencies of the Lean Enterprise helps align strategy and execution?

Options:

A.

Team & Technical Agility

B.

Organizational Agility

C.

Agile Product Delivery

D.

Lean Portfolio Management

Buy Now
Questions 7

Which activity is key to successfully implementing the Scaled Agile Framework?

Options:

A.

Use the Innovation and Planning Iteration instead of the PI Planning process

B.

Replace the PI Planning process with the Inspect and Adapt workshop when possible

C.

Use a cadence-based PI Planning process

D.

Remove blocks such as portfolio estimation

Buy Now
Questions 8

What is the recommended length of an Iteration?

Options:

A.

Two weeks

B.

Ten weeks

C.

Four weeks

D.

Eight weeks

Buy Now
Questions 9

What represents the workflow, activities, and automation needed to deliver new functionality more frequently?

Options:

A.

Portfolio Kanban

B.

The Lean budget Guardrails

C.

The Continuous Delivery Pipeline

D.

The PI Planning process

Buy Now
Questions 10

What is one purpose of the System Demo?

Options:

A.

To evaluate the full PI

B.

To introduce new architectural designs

C.

To identify PI Objectives

D.

To demonstrate new functionality

Buy Now
Questions 11

Which of the following roles act as proxies for the customer in representing their needs to the teams?

Options:

A.

Developer roles

B.

Product roles

C.

Executive roles

D.

Architecture roles

Buy Now
Questions 12

What is one responsibility of the Scrum Master?

Options:

A.

To prioritize the Team's Backlog

B.

To define the tasks and assign owners

C.

To remove impediments in order to help protect the team

D.

To facilitate the PI Planning session

Buy Now
Questions 13

What type of information can be easily seen in a cumulative flow diagram?

Options:

A.

Time to complete a Feature

B.

Team capacity

C.

Work in process across the team

D.

The number of defects that escape to production

Buy Now
Questions 14

How does a team demonstrate progress?

Options:

A.

By presenting status slides

B.

By having the Product Owner verbally communicate to the stakeholders

C.

By showing the actual working product

D.

By showing screen shots of the product

Buy Now
Questions 15

Which of the following SAFe Agile Team types relies on a continually-refined Team Backlog as the primary input to drive value delivery?

Options:

A.

SAFe Team Kanban

B.

SAFe Lean Team

C.

SAFe Epic Team

D.

SAFe Co-located Team

Buy Now
Questions 16

Which of the following aspects of the continuous delivery pipeline focuses on getting to production early for verification?

Options:

A.

Continuous Exploration

B.

Continuous Integration

C.

Release on Demand

D.

Continuous Deployment

Buy Now
Questions 17

Which of the following SAFe Core Values involves coaching aspiring developers to grow their skillsets and fill new roles throughout the organization?

Options:

A.

Built-In Quality

B.

Respect for People

C.

Transparency

D.

Alignment

Buy Now
Questions 18

A SAFe Portfolio is a collection of what?

Options:

A.

Development Value Streams

B.

Functional teams

C.

Solutions

D.

Business units

Buy Now
Questions 19

What is the purpose of building a continuous delivery pipeline?

Options:

A.

To deliver new functionality more frequently than with traditional processes

B.

To identify key stakeholders within the system architecture

C.

To prioritize system stability over development speed

D.

To prioritize development speed over system stability

Buy Now
Questions 20

What is one benefit of organizing around value, & reorganizing when required?

Options:

A.

Understanding the Portfolio Backlog

B.

Building the Continuous Delivery Pipeline

C.

Enabling a DevOps mindset

D.

Minimizing handoffs and dependencies

Buy Now
Questions 21

Why is it important to spend time "in the zone"?

Options:

A.

To reduce queue lengths

B.

To maximize ideal productivity time

C.

To refine productive collaboration

D.

To make work in process visible

Buy Now
Questions 22

What is one of the Agile Release Train events?

Options:

A.

Iteration Retrospective

B.

Backlog refinement

C.

Solution Demo

D.

Product Owner sync

Buy Now
Questions 23

Why do Business Owners assign business value to team PI Objectives?

Options:

A.

To empower teams to make decisions around work

B.

To determine what the teams should work on first

C.

To override the decisions made in WSJS prioritization

D.

To ensure the teams do not work on architectural Enablers

Buy Now
Questions 24

What is considered an anti-pattern when assigning business values to team PI Objectives?

Options:

A.

Business values are assigned to uncommitted objectives.

B.

High business value is assigned to important Enabler work.

C.

Business Owners assign the business value for all teams on the ART.

D.

All PI Objectives are given a business value of 10.

Buy Now
Questions 25

What can be used as a template for putting SAFe into practice within an organization?

Options:

A.

SAFe Core values

B.

SAFe Seven Core Competencies

C.

SAFe Implementation Roadmap

D.

SAFe Lean-Agile Principles

Buy Now
Questions 26

Which statement applies to uncommitted objectives?

Options:

A.

They are included in the commitment

B.

They are items the team has high confidence in

C.

They are counted when calculating load

D.

They are extra things teams can do if they have time

Buy Now
Questions 27

What is the primary purpose of the ART Planning Board?

Options:

A.

To show sizing of the Epics in relation to each other

B.

To show dependencies between teams relating to the Feature development

C.

To show Feature priority in association with business value

D.

To satisfy System Demo expectation by demonstrating incremental delivery

Buy Now
Questions 28

What information does a cumulative flow diagram provide?

Options:

A.

The cycle time system information which starts the implementation

B.

The self-assessment information for the teams

C.

The data for the team to identify current bottlenecks

D.

The derived predictability data for the team

Buy Now
Questions 29

A User Story includes which three things? (Choose three.)

Options:

A.

Who

B.

Level of Risk

C.

Why

D.

What

E.

Definition of Done

F.

How

Buy Now
Questions 30

What visibility should Scrum Masters provide during the Agile Release Train Sync?

Options:

A.

Visibility into progress and impediments

B.

Visibility into system Solution Intent

C.

Visibility into collaboration deployment

D.

Visibility into single source design decisions

Buy Now
Questions 31

What is the product vision?

Options:

A.

A method for aligning to the product direction

B.

The user stories required to meet customer needs

C.

A set of prioritized Features

D.

An explanation of the architectural runway needed to deliver products to the customer

Buy Now
Questions 32

During which of the following PI Planning activities does Product Management introduce the prioritized Features to the teams for planning?

Options:

A.

The Product/Solution Vision presentation

B.

The draft plan review

C.

The business context presentation

D.

The Management Review and Problem-Solving workshop

Buy Now
Questions 33

What is used to describe functional and non-functional requirements?

Options:

A.

Milestones

B.

Architectural Runway

C.

Features

D.

Enablers

Buy Now
Questions 34

Which statement is true about Features and Stories?

Options:

A.

Features should be small enough to fit into an Iteration

B.

Features can be larger than an Iteration but Stories should be small enough to fit into an Iteration

C.

They are prioritized by the team

D.

They are estimated like User Stories

Buy Now
Questions 35

What is critical to improving flow?

Options:

A.

Frequent context switching

B.

Reduce the batch sizes of work

C.

Address the local problems

D.

Increase work in process (WIP) limits

Buy Now
Questions 36

Which of the following Agile Team responsibilities is associated with the Iteration Retrospective?

Options:

A.

Improve relentlessly

B.

Apply systems thinking

C.

Take an economic view

D.

Connect to the customer

Buy Now
Questions 37

Which statement is true about Iteration Planning?

Options:

A.

Items are assigned to the team members

B.

It is required for every Iteration to enable fast learning cycles

C.

The PO does not need to attend

D.

It occurs on the last day of the Iteration

Buy Now
Questions 38

Which three questions should each team member answer during the daily stand-up? (Choose three.)

Are there any impediments that will prevent the team from meeting the Iteration goals?

Options:

A.

How am I splitting the Solutions into Capabilities and Enablers?

B.

How am I optimizing the full Solution?

C.

What did I do yesterday to advance the Iteration goals?

D.

What will I do today to advance the Iteration goals?

E.

How I am contributing to an environment of continuous change?

Buy Now
Questions 39

What are the four types of team topologies?

Options:

A.

Stream-aligned, platform, enabling, and complicated subsystem

B.

Stream-aligned, functional requirements, product domain, and technical

C.

Functional requirements, platform, enabling, and technical

D.

Functional requirements, product domain, technical, and complicated subsystem

Buy Now
Questions 40

What is one of the inputs to the Portfolio canvas?

Options:

A.

Portfolio Epics

B.

Strategic Themes

C.

Enterprise Strategy

D.

Value Stream budgets

Buy Now
Questions 41

James is a Product Owner. It is day seven of the Iteration and his team tells him that they may miss their Iteration commitment. What should James do?

Options:

A.

Support adding an Innovation and Planning Iteration directly after the current Iteration

B.

Agree to add a person from the System Team to complete the work

C.

Ensure the Iteration backlog is accurately prioritized

D.

Support splitting a Story into a coding story and a testing story, and then moving the testing story into the next Iteration

Buy Now
Questions 42

Which type of decision should remain centralized even in a decentralized decision-making environment?

Options:

A.

Decisions that come with a high cost of delay

B.

Decisions that deliver large and broad economic benefit

C.

Decisions that require local information

D.

Decisions that are made frequently

Buy Now
Questions 43

What is one benefit of Story acceptance criteria?

Options:

A.

To provide Story details from a deployment point of view

B.

To provide Story details from a designer point of view

C.

To provide Story details from a release-planning point of view

D.

To provide Story details from a testing point of view

Buy Now
Questions 44

How does SAFe recommend using a second operating system to deliver value?

Options:

A.

Decide whether to apply a hierarchical or Value Stream organizational model across the Enterprise

B.

Reorganize the hierarchies around the flow of value

C.

Build a small entrepreneurial network focused on the Customer in place of existing hierarchies

D.

Organize development around the flow of value while maintaining the hierarchies

Buy Now
Questions 45

Which is an aspect of systems thinking?

Options:

A.

Mastery drives intrinsic motivation

B.

Optimizing a component does not optimize the system

C.

The length of the queue impacts the wait time

D.

Cadence makes routine everything that can be routine

Buy Now
Questions 46

Team B has elected to stop holding retrospective events so they can spend more time completing Stories. Which of the following Agile Team responsibilities is Team B over-prioritizing?

Options:

A.

Applying systems thinking

B.

Deliver value

C.

Plan the work

D.

Connect with the customer

Buy Now
Questions 47

Which of the following methods for gathering customer feedback relies on building analytic systems to deliver information about how customers are using the Solution?

Options:

A.

Continuous exploration

B.

Telemetry

C.

Refactoring

D.

Continuous integration

Buy Now
Questions 48

What is one approach to unlock the intrinsic motivation of knowledge workers?

Options:

A.

Centralize decision-making

B.

Provide autonomy

C.

Reduce work in process (WIP) limits

D.

Strive to achieve a state of continuous flow

Buy Now
Questions 49

An Agile Team has which two characteristics? (Choose two.)

Options:

A.

A stand-alone unit of individuals who do not require input from other teams to complete their tasks

B.

A group of dedicated individuals who are empowered, self-organizing, self-managing, and deliver value

C.

A small group of typically 5 - 11 dedicated individuals who have the skills necessary to define, build, test, and deploy increments of value

D.

A large group of individuals who all work together to create value for the client

E.

A group of dedicated individuals that work in phase-gate steps to complete their PI Objectives

Buy Now
Questions 50

Which of the following statements describes the Product Owner role?

Options:

A.

Prioritizing the ART Backlog

B.

Ensuring quality by testing the Solution

C.

Representing the Customer to the Agile Team

D.

Estimating Stories in the Product Backlog

Buy Now
Questions 51

The Lean Thinking principle, "make value flow without interruptions" means identifying what?

Options:

A.

Predictability issues of the train

B.

Key performance indicators

C.

Activities that lack innovation

D.

Delays

Buy Now
Questions 52

Which of the following roles is responsible for prioritizing the Agile Team Backlog?

Options:

A.

Release Train Engineer

B.

Scrum Master/ Team Coach

C.

Release Manager

D.

Product Owner

Buy Now
Questions 53

Which of the following is both a SAFe Lean-Agile Principle and Lean-Thinking principle?

Options:

A.

Lean portfolio management

B.

Make value flow without interruptions

C.

Decentralize decision-making

D.

Connect strategy to execution

Buy Now
Questions 54

Which of the following is a SAFe Lean-Agile Principle?

Options:

A.

Precisely specify value by product

B.

Visualize work

C.

Turn mistakes into learning moments

D.

Organize around value

Buy Now
Questions 55

What is an example of applying cadence-based synchronization in SAFe?

Options:

A.

Using a Portfolio Kanban system

B.

Allocating budgets to Value Streams

C.

Creating cross-functional ARTs and Agile teams

D.

Conducting a PI Planning event

Buy Now
Questions 56

How can trust be gained between the business and development?

Options:

A.

Automate the delivery pipeline

B.

Deliver predictability

C.

Release new value to production every day

D.

Maintain Iterations as a safe zone

Buy Now
Questions 57

How does relentless improvement support value in the SAFe House of Lean?

Options:

A.

It allows teams to pivot without mercy or guilt

B.

It uses informed decision-making through fast feedback

C.

It builds long-term partnerships based on trust

D.

It optimizes the whole

Buy Now
Questions 58

What is one of the biggest benefits of decentralized decision-making?

Options:

A.

Ensures strategic decisions are made collaboratively

B.

Reduces delays

C.

Improves transparency

D.

Removes accountability from leaders

Buy Now
Questions 59

During which of the following PI Planning activities are Business Owners asked to accept the plans?

Options:

A.

The Management Review and Problem-Solving workshop

B.

The draft plan review

C.

The final plan review

D.

The second team breakout session

Buy Now
Questions 60

What should be taken into account when estimating Story point size?

Options:

A.

Complexity

B.

Team size

C.

Number of days it will take

D.

Priority

Buy Now
Questions 61

What is the best measure of progress for complex system development?

Options:

A.

System Demo

B.

Prioritized backlog

C.

Inspect and Adapt

D.

Iteration Review

Buy Now
Questions 62

Team A is a maintenance team that cannot always predictably plan their work. They like to meet daily to review the needs of the system and plan for how they can quickly address those needs during the workday. Which of the following SAFe Lean-Agile methods should Team A use to plan and execute their work?

Options:

A.

SAFe Platform Team

B.

SAFe Enabling Team

C.

SAFe Team Kanban

D.

SAFe XP Team

Buy Now
Questions 63

What is one result from Iteration Planning for SAFe Scrum Teams?

Options:

A.

Iteration demo

B.

Iteration goals

C.

Iteration estimate

D.

Iteration sequencing

Buy Now
Questions 64

What is one way to understand current WIP in a system?

Options:

A.

Split Stories

B.

Pair to complete the work faster

C.

Size Stories smaller

D.

Make current work visible

Buy Now
Questions 65

What is one of the Product Owner's responsibilities?

Options:

A.

To manage and prioritize the Team Backlog

B.

To foster normalized estimating within the team

C.

To foster adoption of Agile technical practices

D.

To facilitate team meetings and drive Agile behavior

Buy Now
Questions 66

What is the recommended final agenda item of PI Planning?

Options:

A.

Reviewing the final plan

B.

Surfacing the ART risks

C.

Participating in the planning retrospective

D.

Taking the PI confidence vote

Buy Now
Questions 67

What is the role of the Release Train Engineer?

Options:

A.

To ensure the technical integrity of all development in the Agile Release Train

B.

To coach teams to improve their results

C.

To serve as the content authority at the Program Level

D.

To serve as the Scrum Master for the Agile Release Train

Buy Now
Questions 68

What is one action that occurs during iteration reviews for SAFe Scrum teams?

Options:

A.

Evaluating current state metrics

B.

Completing unfinished work

C.

Sizing unfinished stories

D.

Prioritizing unplanned work

Buy Now
Questions 69

What is one way to understand WIP in a system?

Options:

A.

Pair to complete the work faster

B.

Make current work visible

C.

Split stories

D.

Size stories smaller

Buy Now
Questions 70

Deploy, verify, monitor, & respond are all activities of what?

Options:

A.

Continuous Integration

B.

Continuous Exploration

C.

Continuous Deployment

D.

Release on Demand

Buy Now
Questions 71

Which two statements describe an Agile Release Train? (Choose two.)

Options:

A.

It is the primary value delivery construct in the Scaled Agile Framework

B.

It is used to describe large system behaviors that fulfill Customer needs

C.

It shows the deliverables for the currently committed PI and offers visibility into the next two PIs

D.

It identifies when too much work is in the system which results in multitasking and frequent context switching

E.

It is a long-lived, self-organizing, virtual organization of 5 - 12 Agile Teams that plan, commit, and execute togethe

Buy Now
Questions 72

Which statement describes the information within a Story?

Options:

A.

A Story provides just enough information for the intent to be understood by both business and technical people

B.

A Story is written in full detailed specifications so that the work is ready to be implemented immediately

C.

No further conversation is required after the Story is identified because it contains all necessary details

D.

Story acceptance criteria must be finalized before beginning Iteration Planning

Buy Now
Questions 73

What is one practice used to understand the problem space during the discover phase of Design Thinking?

Options:

A.

Prototyping

B.

Personas

C.

Empathy maps

D.

Gemba walks

Buy Now
Questions 74

The Scrum Master wants to establish a team's initial velocity. A team has two testers, three developers, one full-time Scrum Master, and a Product Owner split between two teams. What is their normalized velocity before calculating for time off?

Options:

A.

40

B.

32

C.

48

D.

52

Buy Now
Questions 75

A team finishes developing all of their Stories in the first six days of the Iteration, tests them in the following two days, and fixes bugs in the days remaining. How is the team behaving?

Options:

A.

They are abusing the practice of hardening

B.

They are ignoring nonfunctional requirements within the Iteration

C.

They are waterfalling the Iteration

D.

They are applying the Agile development practice of "separation of concerns"

Buy Now
Questions 76

What is the benefit of separating release elements from the Solution?

Options:

A.

It allows the Agile Release Train to demo value every two weeks

B.

It allows Agile Teams to launch untested Features

C.

It allows the release of different Solution elements at different times

D.

It allows the Systems Team to integrate with ease

Buy Now
Questions 77

What is one element teams present during the draft plan review?

Options:

A.

Iteration goals

B.

Planned business value

C.

Milestones

D.

ART PI risks

Buy Now
Questions 78

What is one component of the Continuous Delivery Pipeline?

Options:

A.

Continuous Exploration

B.

Continuous Cadence

C.

Continuous Planning

D.

Continuous Improvement

Buy Now
Questions 79

Volume, complexity, knowledge, and uncertainty are all qualities of what?

Options:

A.

Weighted shortest job first (WSJF)

B.

Cost of Delay

C.

Story points

D.

Risks

Buy Now
Questions 80

Which of the following SAFe Lean-Agile principles involves delivering a continuous flow of value to customers in the shortest sustainable lead time?

Options:

A.

Decentralized decision-making

B.

Apply systems thinking

C.

Take an economic view

D.

Make value flow without interruptions

Buy Now
Exam Name: SAFe for Teams SP (6.0) - SAFe Practitioner
Last Update: Nov 21, 2024
Questions: 268

PDF + Testing Engine

$56  $159.99

Testing Engine

$42  $119.99
buy now SP-SAFe-Practitioner testing engine

PDF (Q&A)

$35  $99.99
buy now SP-SAFe-Practitioner pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 21 Nov 2024