Winter Sale - Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dpm65

SAFe-SPC SAFe Practice Consultant SPC (6.0) Questions and Answers

Questions 4

What is NOT a good Definition of Done (DoD)?

Options:

A.

The Customer is satisfied with the User Experience.

B.

Nonfunctional Requirements are met.

C.

Code is checked in and merged into main branch.

D.

No must-fix defects exist.

E.

All unit tests are passing.

F.

Coding standards have been followed.

Buy Now
Questions 5

When is the best time to release a product or Solution to the marketplace?

Options:

A.

At the end of the IP Iteration.

B.

At each PI boundary, provided there are no PI defects.

C.

Whenever it meets relevant governance and market criteria.

D.

At quarterly boundaries.

Buy Now
Questions 6

What statement is NOT part of the Agile Manifesto?

Options:

A.

Working software over comprehensive documentation.

B.

Customer collaboration over contract negotiation.

C.

Working software is the primary measure of progress.

D.

Good architectures are built up front so that teams can focus on development.

E.

Continuous attention to technical excellence and design enhances agility.

F.

Business people and developers must work together daily throughout the project.

Buy Now
Questions 7

Typically, SAFe prioritizes Capabilities based on which of the following?

Options:

A.

Business value

B.

CoD (Cost of Delay)

C.

WSJF (Weighted Shortest Job First)

D.

Capacity allocation according to budget

Buy Now
Questions 8

AFe assumes that programs commit to the key priorities within the current PI and provide a forecast for a few subsequent PIs.

Options:

A.

True

B.

False

Buy Now
Questions 9

Test automation is typically included in the Definition of Done (DoD).

Options:

A.

True

B.

False

Buy Now
Questions 10

SAFe uses Story points for estimating the size of Stories, Features, Capabilities, and Epics.

Options:

A.

True

B.

False

Buy Now
Questions 11

What would imply a change to the ART Budget?

Options:

A.

Extending the duration of a PI.

B.

Changing total ART resources

C.

Switching to a different PI cadence.

D.

Reducing the scope of a Program Epic.

E.

Prioritizing Features based on Cost of Delay.

Buy Now
Questions 12

Why is capacity allocation important in SAFe?

Options:

A.

So that team members collaborate better.

B.

So that the team is able to meet its Iteration Goals.

C.

So that teams continuously invest in the Architectural Runway.

D.

It helps resolve conflicts between Feature teams and component teams.

E.

So that the work can be better estimated.

Buy Now
Questions 13

What activity occurs during the program Inspect and Adapt workshop?

Options:

A.

PI Predictability Measure update.

B.

Roadmap update

C.

Team Iteration Demo

D.

Biweekly System Demo

E.

Iteration Metrics update

Buy Now
Questions 14

(Select 2) What factors foster team "Ba"?

Options:

A.

Decentralized decision-making.

B.

Built-in instability.

C.

Use of Feature Teams.

D.

Dunbar's number

Buy Now
Questions 15

(Select 3) You are invited to help a program where, even though not mandated by the external environment, management requires teams to make big, up-front, and detailed scope commitments for every release.

What would you do to best coach the decision-makers?

Options:

A.

Illustrate the power of feedback in content decision-making.

B.

Emphasize the value of "Responding to change" from the Agile Manifesto.

C.

Explain that too much up-front detail demotivates Product Owners as they have almost nothing to do thereafter.

D.

Explain the "understand and exploit variability" principle or product development flow.

E.

Explain why development doesn't need to commit to anything in Agile.

Buy Now
Questions 16

(Select 3) According to Lean thinking, how is fast and sustainable flow achieved?

Options:

A.

By understanding the full Value Stream.

B.

By constant reduction of delays.

C.

By reducing batch sizes.

D.

By applying subjective governance.

Buy Now
Questions 17

What concept is NOT on of the Core Value of SAFe?

Options:

A.

Predictability

B.

Alignment

C.

Transparency

D.

Built-in Quality

E.

Program execution

Buy Now
Questions 18

Enablers can build or enhance development infrastructure.

Options:

A.

True

B.

False

Buy Now
Questions 19

(Select 2) Why is Architectural Runway important?

Options:

A.

It supports a stable velocity.

B.

It provides the documentation on which Features and Capabilities are built.

C.

It iteratively evolves the architecture to meet changing needs.

D.

It allows for nontechnical changes

Buy Now
Questions 20

Backlog items in an Expedite class of service can break WIP limits.

Options:

A.

True

B.

False

Buy Now
Questions 21

ARTs that consist only of Feature teams do not require an Architectural Runway.

Options:

A.

True

B.

False

Buy Now
Questions 22

In SAFe, who owns the Vision for a PI?

Options:

A.

Product Owner

B.

Business Owners

C.

Scrum Master

D.

COE

E.

Product Management

Buy Now
Questions 23

(Select 2) What factors help unlock the intrinsic motivation of knowledge workers?

Options:

A.

Individual and team performance incentives.

B.

Making a contribution.

C.

Ranking individuals for transparency in their contributions to the organization.

D.

Well-structured MBOs so people know exactly what's expected of them.

E.

Autonomy.

Buy Now
Questions 24

What is NOT a SAFe-recommended practice for DevOps?

Options:

A.

Maintain development and test environments to better match production.

B.

Deploy to staging every sprint.

C.

Put everything under version control.

D.

Start automating the actual deployment process.

E.

Build and maintain a production-equivalent staging environment.

F.

Continuously synchronize all Feature and team branches.

G.

Create the ability to automatically build environments.

Buy Now
Questions 25

You are working with an ART that is preparing for their first PI Planning event. All Features are formulated and ready for WSJF prioritization. However, when you look over the list of Features, it turns out that they are big tasks rather than Features.

What technique would be useful to fix the list of backlog items to be able to apply WSJF?

Options:

A.

Split the backlog items into smaller, more manageable pieces of work and rearrange them into real Features.

B.

Formulate business benefits for each backlog item. If not meaningful business benefits can be identified, it's not a Feature and should be redefined.

C.

Build explicit dependencies between backlog items. If B depends on A for completion, make sure that the opportunity enablement WSJF is a parameter of A.

D.

Identify the associated Epics when formulating Features.

Buy Now
Questions 26

What do Value Streams deliver?

Options:

A.

Strategic Themes

B.

Solutions

C.

Agile Release Trains

D.

Cyber-physical systems

Buy Now
Questions 27

Cultural change must come before you start a SAFe implementation.

Options:

A.

True

B.

False

Buy Now
Questions 28

Where are Capabilities managed?

Options:

A.

In the Portfolio Kanban.

B.

In the Value Stream planning board.

C.

In the ART Kanban.

D.

In the Value Stream Kanban.

Buy Now
Questions 29

What is the primary role of a Scrum Master?

Options:

A.

To write all the user stories so that the team can focus on coding and testing.

B.

To task team members in the efficient manner possible based on their skills.

C.

To provide management with status reports on the team's progress.

D.

To use servant leadership to help the team perform at its best.

Buy Now
Questions 30

What are the primary responsibilities of Program Portfolio Management (PPM)?

Options:

A.

Governance, strategy and investment funding, program management.

B.

Program management, stakeholder management, PI Planning.

C.

Lightweight business case, Epic specification workshop, Budget allocation.

D.

Governance, investment funding, product strategy.

Buy Now
Questions 31

What is true about Epic implementation?

Options:

A.

Once pulled into implementation, the Epic needs to be finished.

B.

A budget reserve is established that can be used to fund Epics.

C.

Agile Release Trains are empowered to decide whether or not they proceed with a Portfolio Epic.

D.

Re-prioritization happens at every PI boundary, and the rest of the Epic can be postponed or canceled if there are more important new initiatives.

Buy Now
Questions 32

You organization decided to thoroughly implement the SAFe Principle "Assume variability; preserve options." What is the optimum path for success?

Options:

A.

Assume variability of scope and preserve options for the release date.

B.

Preserve flexibility in system functionality and design, but have fixed Solution intent.

C.

Assume variability of scope, but have fixed Solution Context.

D.

Preserve flexibility in both system functionality and design.

Buy Now
Questions 33

(select 3) What are the 3 primary outputs of PI Planning?

Options:

A.

Program board

B.

Team PI Objectives

C.

Top 10 Features

D.

Vote of confidence/commitment

E.

Portfolio Vision

F.

Iteration Goals

Buy Now
Questions 34

In SAFe, Dunbar's number provides guidance for:

Options:

A.

The number of members on a self-managing, self-organizing ART.

B.

The maximum number of tasks in a Program Increment for optimal predictability.

C.

The number of Stories created during PI Planning to enable commitment.

D.

The percent utilization that enables a sustainable pace.

Buy Now
Questions 35

A Program Epic requires budgetary approval and a lightweight business case only if it spans multiple PIs.

Options:

A.

True

B.

False

Buy Now
Exam Code: SAFe-SPC
Exam Name: SAFe Practice Consultant SPC (6.0)
Last Update: Nov 30, 2024
Questions: 119

PDF + Testing Engine

$57.75  $164.99

Testing Engine

$43.75  $124.99
buy now SAFe-SPC testing engine

PDF (Q&A)

$36.75  $104.99
buy now SAFe-SPC pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 04 Dec 2024