Winter Sale - Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dpm65

RCDD-002 BICSI Registered Communications Distribution Designer - RCDD Questions and Answers

Questions 4

Exhibit:

RCDD-002 Question 4

In this future marina layout, what would be the pre-cabling guideline to follow for the terminal A?

Options:

A.

Place distribution cable onto the dock and terminate in a suitable cabinet or enclosure. Run service drop to each boat slip.

B.

Provide one or two pair cables from the boat slips to a distribution terminal on the closest point of land.

C.

Pre-cable each boat slip during construction.

D.

For security, each run should be terminated in the patch panel/ cross-connect at the dockmaster or marina office.

Buy Now
Questions 5

Exhibit:

RCDD-002 Question 5

A pay telephone using coins needs to be installed in a public area. In the specifications, it is required that the telephone shall meet the ADA (American with Disabilities Act) requirement for front reach using a wheelchair. What will be the maximum reachable height or the value of "X"?

Options:

A.

760 mm (30 in)

B.

864 mm (34 in)

C.

1170 mm (46 in)

D.

1220 mm (48 in)

E.

1370 mm (54 in)

Buy Now
Questions 6

The ________ system is an application used for storing and viewing captured digital radiology image files.

Options:

A.

CCU

B.

ICU

C.

DICOM

D.

PACS

Buy Now
Questions 7

Which of the following is NOT a form of signal coupling between two (2) circuits?

Options:

A.

Conductive

B.

Inductive

C.

Reactive

D.

Capacitive

E.

Electromagnetic

Buy Now
Questions 8

Which of the following is an alarm management output system?

Options:

A.

Patient monitoring system

B.

Bed monitoring system

C.

Security system

D.

Wireless telephone system

Buy Now
Questions 9

The ability of a device to withstand electromagnetic disturbances from another device is:

Options:

A.

Electromagnetic interference (EMI)

B.

Radio Frequency Interference (RFI)

C.

(EMC)

D.

Fast transients

E.

Electrostatic Discharge (ESD)

Buy Now
Questions 10

The potential for ______ occurs when devices or systems share a common electromagnetic environment and their operational frequencies overlap.

Options:

A.

Electromagnetic interference (EMI)

B.

(EMC)

C.

Radio frequency interference (RFI)

D.

Fast transients

E.

Electrostatic discharge (ESD)

Buy Now
Questions 11

In reviewing your client's network needs for today and 5 years into the future, you note their current specs call for a 1Gb/s network within a campus environment, with little or no possibility of any increased bandwidth demands until they move to their planned future site. The building is not large, and the cable lengths will not exceed 550 m (1804 ft). Your recommendation for the fiber to be installed in the backbone is:

Options:

A.

OM1 fiber

B.

OM2 fiber

C.

OM3 fiber

D.

OM1, OM2, or OM3 will work

E.

OS1 equipped with attenuators

Buy Now
Questions 12

When designing a backbone distribution system, you will need to include a telecommunications enclosure (TE). A TE can be defined as a:

Options:

A.

Splice point for copper cabling only

B.

Point where the backbone cabling interfaces to the horizontal cabling and may be utilized in place of a traditional Telecommunications Room (TR)

C.

Location for housing building cross-connect cabling only

D.

Location to house the splice transitioning from outdoor to indoor cabling only

E.

Facility to store slack copper and fiber cables

Buy Now
Questions 13

All entrance conduits should be equipped with a plastic or nylon line with a MINIMUM test rating of _________ pulling tension.

Options:

A.

22.7 kg (50 lbs)

B.

45.4 kg (100 lbs)

C.

68 kg (150 lbs)

D.

90 kg (200 lbs)

E.

113 kg (250 lbs)

Buy Now
Questions 14

Buildings larger than ________ must contain a dedicated room for the termination of entrance facilities.

Options:

A.

5529 square m (60,000 square ft)

B.

7389 square m (80,000 square ft)

C.

9300 square m (100,000 square ft)

D.

11,160 square m (120,000 square ft)

E.

13,300 square m (140,000 square ft)

Buy Now
Questions 15

The decision regarding the number of optical fibers to install (fiber strand count) in a backbone depends largely on all of the following EXCEPT:

Options:

A.

Level of multiplexing

B.

Intended end-user applications

C.

Physical topology of the cabling system

D.

Distance between telecommunications room (TR)

E.

Cabling system configuration

Buy Now
Questions 16

Which one of the following is NOT an advantage of direct-buried cable?

Options:

A.

Is flexible for future reinforcements or changes

B.

Has a low initial installation cost

C.

Can easily bypass obstructions

D.

Preserves the aesthetic appearance of buildings

Buy Now
Questions 17

Which of the following correctly lists the lowest frequency band to the highest frequency band?

Options:

A.

MF, HF, VHF, UHF

B.

UHF, VHF, HF, MF

C.

HF, MF, UHF, VHF

D.

VHF, UHF, MF, HF

E.

HF, MF, UHF, VHF

Buy Now
Questions 18

Select the appropriate task to complete the section 2.2 of the work breakdown structure below:

2. Technician

2.1 Install rack

2.2 _________

2.3 Place fiber

2.4 Terminate fiber

2.5 Test fiber

Options:

A.

Prepare as-built drawings

B.

Install connector housing

C.

Clean/polish connectors

D.

Specify fiber

Buy Now
Questions 19

You are designing an interactive patient television system (IPTS) that will provide internet, nurse call and LCD television services. From the following, which medium will NOT support these services in a backbone cabling system?

Options:

A.

Balanced twisted pair

B.

Coaxial 1/2 inch hard-line cable

C.

Multimode optical fiber cable

D.

RG-11 coaxial cable

Buy Now
Questions 20

Most types of firestop putty have ________ properties.

Options:

A.

Water based

B.

Cementitious

C.

Intumescent

D.

Silicone based

Buy Now
Questions 21

Assume that the optical power transmitted by a 62.5/125 multimode fiber is distributed uniformly across its core. If this fiber is perfectly coupled (i.e., the two fibers are aligned and abutted) to a 50/125 fiber, what is the percent of power that is lost?

Options:

A.

0 percent

B.

36 percent

C.

50 percent

D.

80 percent

E.

100 percent

Buy Now
Questions 22

What type of material does NOT support combustion even under accelerated conditions?

Options:

A.

Fire break

B.

Fire proof

C.

Fire resistant

D.

Fire retardant

Buy Now
Questions 23

At the end of the second week of a project, the earned value (EV) of work is $8000 USd and the planned value (PV) of work is $7000 USd. What is true about the project?

Options:

A.

The project is ahead of schedule.

B.

The project is over budget.

C.

The project is behind schedule.

D.

The project is under budget.

Buy Now
Questions 24

You are designing distribution for a seven unit townhouse with in slab conduits. What is the MINIMUM number of 27 mm (1 in) rigid PVC Type 2 or metallic conduit that is required to satisfy distribution to each unit?

Options:

A.

Three

B.

Four

C.

Five

D.

Seven

E.

Fourteen

Buy Now
Questions 25

Which service is NOT typical of Grade 1?

Options:

A.

Telephone

B.

Multimedia

C.

Data

D.

Television

Buy Now
Questions 26

To accommodate telephone, data, CATV, security and multimedia, a MINIMUM of ________ strands of optical fiber auxiliary disconnect outlet (ADO) cable should be provided.

Options:

A.

Two

B.

Four

C.

Five

D.

Six

E.

Eight

Buy Now
Questions 27

Surge currents due to lightning and other sources MUST be ________ before they penetrate the infrastructure.

Options:

A.

Shorted

B.

Maximized

C.

Terminated

D.

Equalized

Buy Now
Questions 28

Certain systems must exist relative to bonding and grounding at every site. Which of the following is NOT one such system?

Options:

A.

AC grounding electrode system (e.g., in some countries it may also be known as the earthing system)

B.

Telecommunications bonding infrastructure

C.

Lightning protection system

D.

Equipment grounding system (e.g., in some countries it may also be known as the equipment bonding system)

Buy Now
Questions 29

Select the appropriate task to complete section 2.2 of the work breakdown structure (WBS) below:

2 Technician

2.1 Install cabling

2.2 __________

2.3 Activate wireless

Options:

A.

Install access point

B.

Clean work area

C.

Install pathway for cabling

D.

Confirm wireless coverage

Buy Now
Questions 30

The recommended MAXIMUM value for the bonding resistance between the nearest available grounding electrode and the busbar in an entrance facility (EF) is ________ ohms.

Options:

A.

0.1

B.

0.5

C.

1

D.

2

E.

5

Buy Now
Questions 31

You are designing a paging system for a 588 sq m (6325 sq ft) open office space. Due to architectural features of the ceiling, wall mounted speakers must be used. Following the general rule about wall mounted speaker placement, how many speakers should be installed?

Options:

A.

Eight

B.

Ten

C.

Twelve

D.

Fourteen

Buy Now
Questions 32

A properly designed distributed paging system will provide a sound pressure level (SPL) for audio paging that is between ________ above ambient noise level.

Options:

A.

3 dB and 6 dB

B.

6 dB and 10 dB

C.

10 dB and 20 dB

D.

20 dB and 55 dB

Buy Now
Questions 33

You are designing a restaurant located within a retail mall. The ambient noise level of the restaurant is 70 dB. The ambient noise level of the mall common space is 75 dB. What is the MINIMUM sound pressure level (SPL) that should be used when designing the paging system within the restaurant?

Options:

A.

70 dB

B.

75 dB

C.

80 dB

D.

85 dB

Buy Now
Questions 34

Exhibit:

RCDD-002 Question 34

The diagram below is a typical configuration for:

Options:

A.

Work area 3-connector permanent link

B.

Work area 3-connector channel

C.

Data center 4-connector channel

D.

Data center 4-connector permanent link

E.

Work area 4-connector permanent link

Buy Now
Questions 35

Which class of the system was created to secure a single equipment room (ER)?

Options:

A.

Class 1

B.

Class 2

C.

Class 3

D.

Class 4

Buy Now
Questions 36

Color codes for cross-connection fields have been used for many years. Which color is used to identify network connections?

Options:

A.

Green

B.

Orange

C.

Purple

D.

Yellow

E.

Brown

Buy Now
Questions 37

Color codes for cross-connections fields have been used for many years. Which color is used to identify horizontal cable?

Options:

A.

Blue

B.

Green

C.

Purple

D.

Orange

E.

Brown

Buy Now
Questions 38

A telecommunications outlet/connector may be provided using all listed below EXCEPT:

Options:

A.

Wireless AP connectivity

B.

Balanced twisted-pair outlets

C.

Optical fiber connectors

D.

4p4c (4 position, 4 contact) connector

Buy Now
Questions 39

Assuming the total fill capacity of a pathway is 100 cables (all of the same cable type and size), the MAXIMUM number of cables to be installed during the initial installation, without exceeding the fill ratio is:

Options:

A.

25

B.

40

C.

50

D.

60

Buy Now
Questions 40

When specifying telecommunications outlet boxes, all of the following should be considered EXCEPT:

Options:

A.

Outlet box shall be a minimum of 100 mm (4 in) x 100 mm (4 in) x 76 mm (3 in)

B.

Outlet boxes should be installed near an electric outlet at the same height

C.

Different outlet boxes have different support requirements

D.

Floor mounted telecom outlet boxes should be coordinated with furniture to minimize the potential trip hazard

E.

Outlet boxes must be of adequate size so that minimum cable bend radius requirements are not exceeded

Buy Now
Questions 41

Where backbone cabling exceeds cabling lengths for the same performance or design (for product used in horizontal cabling), there are three fundamental tests which should be considered when testing. They are:

Options:

A.

Insertion loss (attenuation), return loss, and wiremap/strand identification

B.

Insertion loss (attenuation), return loss, and continuity

C.

Insertion loss (attenuation), return loss, and length

D.

Insertion loss (attenuation), continuity, and wiremap/strand identification

E.

Continuity, wiremap/strand identification, and propagation delay/delay skew

Buy Now
Questions 42

"A single outlet utilizing a dedicated phase, neutral, and ground conductor" is the definition for which of the following?

Options:

A.

Feeder circuit

B.

Ground fault receptacle

C.

Dedicated branch circuit

D.

"Daisy-chained" series of receptacles

Buy Now
Questions 43

You have been asked to test and troubleshoot an installed base of cabling that is believed to be causing network problems. You are finding that there are high levels of return loss upon initial testing. What testing will best determine the reasons for these failures?

Options:

A.

Power meter

B.

Continuity testing

C.

Level II testing

D.

Time domain reflectometer (TDR)

Buy Now
Questions 44

If you are working on a physical security plan for a data center and focusing on building and access control, what layer of the plan would this relate to?

Options:

A.

Layer 1

B.

Layer 2

C.

Layer 3

D.

Layer 4

E.

Layer 5

Buy Now
Questions 45

When allocating termination space for CAT 6 and optical fiber cables, it is recommended that additional space of up to ________ percent be considered for the routing of the cables and patch cords.

Options:

A.

Five

B.

Ten

C.

Twenty

D.

Thirty

Buy Now
Questions 46

In a telecommunication room (TR), the ________ is the facility used to make cross connections from the backbone cable to the horizontal cable.

Options:

A.

Horizontal cross-connect (HC)

B.

Entrance facility (EF)

C.

Intermediate cross-connect (IC)

D.

Main cross-connect (MC)

Buy Now
Questions 47

The average power consumption in a telecommunications room (TR) is 2260 watts per hour. What is the heat dissipation in BTUs?

Options:

A.

7096 BTU

B.

7713 BTU

C.

8104 BTU

D.

8511 BTU

Buy Now
Questions 48

What type of redundancy provides two complete units, modules, paths or systems for every one required for a base system.

Options:

A.

N

B.

N+1

C.

N+2

D.

2N

E.

2(N+1)

Buy Now
Questions 49

You are designing a cabling containment system installed overhead in a new data center. The main or prime purpose of the system will be to manage fiber optic cabling between cabinets. You have a choice of designs of the containment system. In view of the prime purpose of containment system, your first choice of design will be one that:

Options:

A.

Has a bottom design with a web spacing of less than 203 mm (8 in)

B.

Has a bottom design with a web spacing of less than 152 mm (6 in)

C.

Is manufactured with a soft cloth type material

D.

Has a solid bottom design

E.

The design is not important as long as the client pre approves the manufacturer

Buy Now
Questions 50

All of the following are nominal wavelengths for laser light sources EXCEPT:

Options:

A.

700 nm

B.

850 nm

C.

1300 nm

D.

1310 nm

E.

1550 nm

Buy Now
Questions 51

What is at the "root" of a DAS (distributive antenna system)?

Options:

A.

Antenna

B.

Receiver

C.

Transmitter

D.

Transceiver

Buy Now
Questions 52

You are working with the Sheriff's Department to develop a public safety wireless network that will be secured from interference and have the capability of delivering up 10 Mbps subscriber speed. What microwave frequency should be used to best meet these needs?

Options:

A.

2.4 Ghz

B.

4.9 Ghz

C.

5.0 Ghz

D.

5.3 Ghz

Buy Now
Questions 53

When considering the DAS, which component acts as a bidirectional antenna?

Options:

A.

Multimode optical fiber cable

B.

Radiating coaxial cable

C.

Shielded twisted pair (STP) cable

D.

Single mode optical fiber cable

E.

Screened twisted pair (ScTP) cable

Buy Now
Questions 54

Which of the following is a nonmechanical firestop system?

Options:

A.

Cable transit system

B.

Firestop blocks

C.

Fire rated pathway device

D.

Factory fabricated sleeve system

Buy Now
Exam Code: RCDD-002
Exam Name: BICSI Registered Communications Distribution Designer - RCDD
Last Update: Dec 13, 2024
Questions: 361

PDF + Testing Engine

$57.75  $164.99

Testing Engine

$43.75  $124.99
buy now RCDD-002 testing engine

PDF (Q&A)

$36.75  $104.99
buy now RCDD-002 pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 18 Dec 2024