Halloween Special - 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dm70dm

LEED-AP-ND LEED AP Neighborhood Development (LEED ND) Questions and Answers

Questions 4

A project builds a central plant that burns biomass products to provide space heating and hot water to the development. Which ofthe following Green Infrastructure and Buildings credits could this help the project achieve?

Options:

A.

Solar Orientation

B.

indoor Water Use Reduction

C.

District Heating and Cooling

D.

Infrastructure Energy Efficiency

Buy Now
Questions 5

A standardized base map that should be used throughout the submission to illustrate relevant surrounding features forup to 1 mi.(1.6 km) around the project boundary is a

Options:

A.

special map.

B.

permit map.

C.

vicinity map

D.

project site map.

Buy Now
Questions 6

A creek tuna through a project site containing adjacent degraded wetlands In order to achieve Smart Location and Linkage Credit. Restoration of Habitat or Wetlands and Water Bodies, the developer Is restoring the wetlands and establishing a conservation easement in collaboration with a state land conservation organization

Once restored, what is the minimum amount of time this area must be protected from development and the minimum amount of time the maintenance be funded?

Options:

A.

Protected for 30 years; maintained tor a minimum of one year

B.

Protected for 30 years; maintained for a minimum of three years

C.

Protected for the purposes of long term conservation; maintained for a minimum of one year

D.

Protected for the purposes of long term conservation; maintained for a minimum of three years

Buy Now
Questions 7

Which of the following can be included within the boundary of a project site on an urban waterfront?

Options:

A.

Dock to be constructed by the developer

B.

House boats in place prior to the issuance of certificate of occupancy

C.

Marina pier in place prior to the date of property acquisition

D.

Jetty with funding for construction prior to the date of certification

Buy Now
Questions 8

A LEED forNeighborhood Development project is going to temporarily reroute existing transit service outside the required distances as pan or the construction process.The protect team has secured an agreement withthe transit agency to restore the rerouted service. What is the maximum number of years the service can be rerouted in order to quality tor Smart Location and Linkage Credit. Access to Quality Transit?

Options:

A.

One year

B.

Two years

C.

Three years

D.

Four years

Buy Now
Questions 9

Whichof the following innovation proposals is most likely to be successful to achieve Innovation,Option 1:Innovation?

Options:

A.

Including locked, Indoor bicycle storage for 100% of project occupants

B.

Being located next to a 20-mi. (32 Km), award-winning bicycle trail

C.

Distributing leaflets to project occupants about available public transit services nearby

D.

Providing an educational program on the environmental and human health benefits of green neighborhood

Buy Now
Questions 10

Which of the following credits or prerequisites requires a calculation ofIntersections per square mile for square kilometer)?

Options:

A.

neighborhood Pattern and Design Credit. Walkable Streets

B.

Smart Location and Linkage Credit,Bicycle Facilities

C.

Neighborhood Pattern and Design Prerequisite,Connected and Open Community

D.

Smart Location and Linkage Credit. Access to Quality Transit

Buy Now
Questions 11

A project includes previously developed lotswithin the LEED for Neighborhood Development boundary. For the purpose ofcalculating previously developed site area, which lot size may be consideredto be 100% previously developed?

Options:

A.

0.5 acre (0.2 hectare)

B.

1.5 acres (0.61 hectare)

C.

2 acres (0.81 hectare)

D.

2.5 acres (1.01 hectare)

Buy Now
Questions 12

Acultural landscape is identifiedon a project site. Which action contributes to Green Infrastructure and Buildings Credit. Historic Resource Preservation and Adaptive Reuse?

Options:

A.

Hire a registered landscape architect to enhance the design of thelandscape

B.

Provide educational case study and signage about the history of the project site

C.

Construct wetlands using nativeplants to improve hydrology, controlstormwater runoff. and provide wildlife habitat

D.

Contact the state historic preservation office of the National Park Service, or local equivalent to determine if the landscape is registered as a historic site

Buy Now
Questions 13

According to Green Infrastructure and Buildings Prerequisite. Indoor Waler Use Reduction, the indoor water usage of a new building or buildings undergoing major renovations (nonresidential buildings, mixed-use buildings, and multifamily tour stones or more), must average at least

Options:

A.

10% less than in baseline buildings.

B.

20% less thanin baseline buildings.

C.

30% loss than in baseline buildings

D.

50% less than in baseline buildings.

Buy Now
Questions 14

On a project with 10 residential units, which of the following would contribute to achieving Neighborhood Pattern and Design Credit. Neighborhood Schools?

Options:

A.

Including a new middle school with a 12-acre (4.8 hectare) campus

B.

Including a new elementary school with a four-acre (1.6 hectare) campus

C.

Locating all of the units within a 1.5 mi (2414m) walking distance of an ousting high school

D.

Locating three units within a 1/2 mi. (800 m) walking distance, and seven units within a one ml. (1.600 m) walking distance of an existing elementary school

Buy Now
Questions 15

Which of the following approaches contributes to achieving a point under Neighborhood Pattern and Design Credit. Community Outreach and Involvement?

Options:

A.

Conduct a telephone survey of users of similar projects in the same region

B.

Present the project and solicit community Input at an open house during construction

C.

Conduct a one day design charrette or interactive workshop with the design team and client

D.

Create and maintain an interactive website for discussion between the developer and the community throughout the duration of the project

Buy Now
Questions 16

Winch of the following general strategies is acceptable under Neighborhood Pattern and Design Credit. Reduced Parking Footprint?

Options:

A.

On-street parking

B.

Off-street parking in front of building

C.

A three ..(1.2 hectare) surface parking lot

D.

Carpool spaces located within 300 ft. (90 m) of building entrances

Buy Now
Questions 17

The total area of all buildings on a project is 125,000 ft2 (11 612 m2). 63.750 ft2 (5.922 m2) of the project is within 1/2 mi (800 m) of 11 diverse uses and 106.240 ft2 (9.870 m2) of the project buildings are oriented for maximum solar orientation. What credit is the project eligible to achieve?

Options:

A.

Neighborhood Pattern and Design Credit. Walkable Streets

B.

Green Infrastructure and Buildings Credit. Solar Orientation

C.

Neighborhood Pattern and Design Credit. Mixed-Use Neighborhoods

D.

Green infrastructure and Buildings Credit, optimize Building Energy Performance

Buy Now
Questions 18

What reference standard is used to determine compliance with Green Infrastructure and Buildings Prerequisite. Minimum Building Energy Performance when the whole building energy modeling option is used?

Options:

A.

ASHRAE 55-2010

B.

ASHRAE 90.1-2007

C.

ASHRAE 90.1-2010

D.

ASHRAE 62.1-2010

Buy Now
Questions 19

For a 100% previously developed site, which of the following steps should the project team take during the Initial stages of planning to meet the requirements of Smart Location and Linkage Prerequisite. Imperiled Species and Ecological Communities Conservation?

Options:

A.

Take minimum precautions A 100% previously developed site meets the requirements

B.

Work with a qualified biologist to restore ecological communities, using only native plants on at least 10% of the development footprint

C.

Create conservation easements to prepare for the possibility that threatened or endangered species are found after the site plan has been approved

D.

Consult with the state Natural Heritage Program and state fish and wildlife agencies to determine if there are any threatened or endangered species on the site.

Buy Now
Questions 20

The intent of Neighborhood Pattern and Design Credit. Community Outreach and Involvement is to

Options:

A.

promote the health and well-being of the community members.

B.

promote the communication between the developer and the construction team.

C.

provide an educational opportunity for real estate and urban planning students.

D.

encourage responsiveness to those who live or work in the community.

Buy Now
Questions 21

Which of the following is a minimum program requirement of LEED®Neighborhood Development?

Options:

A.

Contain one habitable building and be no larger man 1,000 acres (405 Declares)

B.

Contain two habitable buildings and be no larger man 1,000 acres (405 Declares)

C.

Contain one habitable building and be no larger than 1,500 acres (607 5 hectares)

D.

Contain two habitable buildings and be no larger man 1,500 acres (607 5 hectares)

Buy Now
Questions 22

A developer is lookingfor a site to construct a LEED for Neighborhood Development project.Which contextual attribute would most contribute to gaining this certification?

Options:

A.

A site with waterfront as part of its boundary

B.

Previously disturbed land surrounding the site

C.

A nearby office park

D.

A load utility that supplies renewable energy to the site

Buy Now
Questions 23

A project intends to connect to the municipal graywater system Toward which of the following can this connection contribute?

Options:

A.

Green Infrastructure and Buildings Credit. Rainwater Management

B.

Green Infrastructure and Buildings Credit. Wastewater Management

C.

Green Infrastructure and Buildings Credit. Outdoor Water Use Reduction

D.

Green Infrastructure and Buildings Prerequisite. Indoor Water Use Reduction

Buy Now
Questions 24

According to the Minimum Program Requirements, a LEED for Neighborhood Development project should contain at least how many habitable buildings?

Options:

A.

One Building

B.

Two building

C.

Three buildings

D.

Four buildings

Buy Now
Questions 25

As defined by the Minimum Program Requirements, theLEED project boundary includes the

Options:

A.

aggregate of parcels within the project controlled by the project developer

B.

land and water area that is reviewed for certification

C.

project area minus the nonbuildable square footage associated with the protect

D.

total land area of a protect site bordering previously developed parcels.

Buy Now
Questions 26

Which of thefollowing strategies comply with Neighborhood Pattern and Design Credit,Community Outreach and Involvement?

Options:

A.

Host a public hearing to solicit input after preliminary design

B.

Conduct a one day design charrette including property owners, residents, business owners and workers

C.

Establish ongoing communication channel between developer and community during the design and construction process

D.

Invite local businesses, residents and community planners and other stakeholder's to a meeting held at the siteto review the plan after it has been completed

Buy Now
Questions 27

In a LEED for Neighborhood Development project, in order to earn one point for Innovation Credit. LEED Accredited Professional, the individual must have which accreditation?

Options:

A.

LEED AP Neighborhood Development

B.

LEED AP Building Design and Construction

C.

Any LEED AP without specialty credential

D.

LEED AP with any specialty credential

Buy Now
Questions 28

For credits requiring bicycle storage as well as shower and changing facilities, shower requirements may be met in office buildings by providing

Options:

A.

private locker storage within the restrooms.

B.

one shower and changing room per 200 employees.

C.

free access to a health club shower within the building

D.

reduced cost memberships to a health club within the same building.

Buy Now
Questions 29

Winch of thefollowing rating method can beused to determine the performance of luminaires for Green Infrastructure and Buildings Credit. Light Pollution Reduction?

Options:

A.

edema index

B.

Light emitting diodes

C.

Backlight-uplight-glare

D.

illuminating Engineering Society. Stage A Evaluation

Buy Now
Questions 30

Which of thefollowing site conditions should be considered in the selection of renewable energy technologies for Green Infrastructure and Buildings Credit. Renewable Energy Production?

Options:

A.

Wind exposure

B.

Distance from a wetland

C.

Annual precipitation levels

D.

Elevation above the 100-year flood plain

Buy Now
Exam Code: LEED-AP-ND
Exam Name: LEED AP Neighborhood Development (LEED ND)
Last Update: Oct 17, 2024
Questions: 100

PDF + Testing Engine

$48  $159.99

Testing Engine

$36  $119.99
buy now LEED-AP-ND testing engine

PDF (Q&A)

$30  $99.99
buy now LEED-AP-ND pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 24 Oct 2024