Easter Sale - 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dm70dm

IDPX Interior Design Professional Exam Questions and Answers

Questions 4

When estimating the total FF&E costs for installation, maintenance, and replacement, which of the following is being completed?

Options:

A.

Actual costs

B.

Planned value

C.

Life-cycle costing

D.

Cost-benefit analysis

Buy Now
Questions 5

During early planning stages of a sustainable project, which of the following elements are the MOST important to develop?

Options:

A.

LED lighting and locally sourced materials

B.

Wind power and recycled content materials

C.

Composting toilets and renewable power sources

Buy Now
Questions 6

Which consultant should be contacted to correct omissions on the drawing shown below?

IDPX Question 6

Options:

A.

Electrical

B.

Plumbing

C.

Structural

D.

Fire protection

Buy Now
Questions 7

Which of the following is MOST likely to require a louvered door?

Options:

A.

IT closet

B.

Hotel room

C.

Executive office

D.

Dental exam room

Buy Now
Questions 8

Administration, marketing, and management expenses in a design firm are examples of

Options:

A.

Indirect labor

B.

Billable hours

C.

Direct materials

D.

Facility overhead

Buy Now
Questions 9

What is one way to reduce indoor air pollutants?

Options:

A.

increase humidity levels

B.

install operable windows

C.

use materials with high VOCs

D.

decrease building temperature

Buy Now
Questions 10

Which scheduling method BEST shows the interrelationships of tasks?

Options:

A.

work plan

B.

Gantt chart

C.

critical path

D.

milestone chart

Buy Now
Questions 11

Which two functions are allowed with a one-hour fire separation in a fully-sprinklered building?

IDPX Question 11

Options:

A.

a bank and a theater

B.

a car wash and a bank

C.

a theater and a casino gaming floor

D.

a casino gaming floor and a bowling alley

Buy Now
Questions 12

During a substantial completion walk-through, a designer notices that a door was installed incorrectly. What should the designer do NEXT?

Options:

A.

Meet with the general contractor, review the drawings, and schedule replacement

B.

Process a change order and include the new door location

C.

Add the door location and problem to the punch (deficiency) list

D.

Ask the client to accept the door, with a credit memo

Buy Now
Questions 13

What is the BEST way for a designer to determine whether the payment application of a contractor is consistent with the work completed to date?

Options:

A.

Request a breakdown of the pricing in the payment application to be reviewed by the consultants

B.

Participate in periodic site visits to compare progress onsite to progress claimed in the payment application

C.

Review the project schedule to determine what should be completed by the date of the payment application

D.

Call the subcontractors individually to verify that the work noted on the payment application is indeed complete

Buy Now
Questions 14

What is the MINIMUM distance a vending machine can be located on the push side of a door with a closer and latch in an employee breakroom?

Options:

A.

12" [305 mm]

B.

18" [457 mm]

C.

24" [610 mm]

Buy Now
Questions 15

What type of space may employees be relocated to during a phased remodel project?

Options:

A.

swing

B.

staging

C.

hoteling

D.

pre-move

Buy Now
Questions 16

What modification would increase the available time for occupants to exit a space during a fire?

Options:

A.

Change the ceiling type

B.

Install a sprinkler system

C.

Increase the number of exits

D.

Specify finishes with higher flame-spread rating

Buy Now
Questions 17

During construction of a project in another city, what is a common and efficient way for a small firm to manage the progress?

Options:

A.

visit the location of the project on a weekly basis

B.

joint-venture with a design firm local to the project

C.

partner with a prominent company local to the designer

D.

hire one employee that will remain in the city of the project

Buy Now
Questions 18

A designer is working on a joint venture project with a local engineering firm for a large university project. What drawing system will BEST incorporate coordination of project information?

Options:

A.

Facility condition index (FCI)

B.

Building information modeling (BIM)

C.

Project life cycle management (PLM)

D.

Virtual design and construction project manager (VDC)

Buy Now
Questions 19

What should be evaluated by the design team in advance of a project kickoff with clients and stakeholders?

Options:

A.

Cost analysis and value engineering

B.

Site availability and schedule impacts

C.

System performance and subcontractor availability

Buy Now
Questions 20

When the owner/contractor agreement is executed, which documents specifically form the contract documents?

Options:

A.

drawings, specifications, instruction to bidders

B.

drawings, specifications, addenda

C.

specifications, addenda, bid (tender) solicitation

D.

addenda, bid (tender) solicitation, instruction to bidders

Buy Now
Questions 21

A storage area has been approved as an accessory occupancy within a retail store. The means of egress requirements are based on which occupancy type?

Options:

A.

Storage (S)

B.

Business (B)

C.

Mercantile (M)

Buy Now
Questions 22

In a project that includes a home renovation and procurement of new furniture, what is the BEST fee structure?

Options:

A.

Hourly fee method and cost-plus method

B.

Square foot method and fixed fee method

C.

Fixed fee method and square foot method

D.

Value-oriented method and hourly fee method

Buy Now
Questions 23

Which person is MOST responsible for ensuring that the construction drawings are code-compliant?

Options:

A.

Developer

B.

Building owner

C.

Interior designer

D.

Building inspector

Buy Now
Questions 24

An interior designer was contacted by their client shortly after occupancy and move-in, complaining that lights in private offices and some spaces were turning off automatically after a few minutes. What is the BEST next step?

Options:

A.

Inform the client that they can disconnect the occupancy sensors

B.

Reconfigure the spaces with issues to better improve occupancy sensor line-of-sight

C.

Have the occupancy sensors replaced with manual switches at the owner’s expense

D.

Contact the installer to check that the occupancy sensors are set to the maximum time limit

Buy Now
Questions 25

What is the allowable reach range for an obstructed side reach over a kitchen counter?

Options:

A.

34" [914 mm] to 46" [1168 mm]

B.

15" [381 mm] to 48" [1219 mm]

C.

18" [457 mm] to 48" [1219 mm]

Buy Now
Questions 26

To reduce radon levels in a home, it is recommended that the

Options:

A.

crawl space is ventilated

B.

building is depressurized

C.

basement windows are sealed

D.

expansion joints are installed at slabs-on-grade

Buy Now
Questions 27

Which wall section provides for a two-hour fire-rated wall?

IDPX Question 27

Options:

A.

1 5/8" [41 mm] metal studs, 1/2" [13 mm] regular gypsum board applied to each side, 3/8" [9 mm] regular gypsum board applied to each side

B.

Two layers 1/2" [13 mm] metal studs, regular gypsum board applied to each side

C.

1 5/8" [41 mm] metal studs, 1/2" [13 mm] type X gypsum board applied to each side, 1/4" [6 mm] regular gypsum board applied to each side, 2" [50 mm] glass fiber insulation

D.

1 5/8" [41 mm] metal studs, two layers 1/2" [13 mm] type X gypsum board applied to each side, glass fiber insulation

Buy Now
Questions 28

In order for a building permit to be issued, what MUST be completed?

Options:

A.

demolition phase of project

B.

submission of contract documents

C.

final inspection by a building official

D.

issuance of the certificate of occupancy

Buy Now
Questions 29

Which wall assembly would produce the highest STC rating?

Options:

A.

2x4 studs at 16" [406 mm] OC, 2 layers of 5/8" [15 mm] gypsum board on each side, full batt insulation

B.

2-1/2" [64 mm] metal studs at 16" [406 mm] OC, 1/2" [13 mm] gypsum board on each side, full batt insulation

C.

3-1/2" [89 mm] metal studs at 16" [406 mm] OC, 5/8" [15 mm] gypsum board on each side, full batt insulation

Buy Now
Questions 30

A university is renovating the restrooms (washrooms) of a dormitory built in 1963 and is required to reduce the water usage by 20%. What is MOST important when specifying plumbing fixtures?

Options:

A.

durability & Green Seal fixtures

B.

cleanability & Energy Star fixtures

C.

accessibility & WaterSense fixtures

D.

sustainability & International Plumbing Code compliant fixtures

Buy Now
Questions 31

Which of the following would allow for ease of reconfiguration of power and data for open office environments?

Options:

A.

access flooring

B.

poke-through system

C.

cellular floor systems

D.

underfloor steel ducts

Buy Now
Questions 32

Any space that is classified as an assembly occupancy MUST have

Options:

A.

the occupancy load posted

B.

a dedicated restroom (washroom)

C.

direct access to the main elevator

Buy Now
Questions 33

On a multi-tenant floor, what is the usable area when calculating square footage according to Building Owners and Managers Association (BOMA) standards?

IDPX Question 33

Options:

A.

Tenant 1 and Tenant 2

B.

Tenant 1, Tenant 2, and Elevator Lobby 3

C.

Tenant 1, Tenant 2, and Electrical/Telephone 5

D.

Tenant 1, Tenant 2, Electrical/Telephone 5, and Elevator Lobby 3

Buy Now
Questions 34

The specification of which item is within the scope of work for interior designers when designing for water conservation?

Options:

A.

ultra-low flow faucets

B.

vegetated roof system

C.

rainwater collection cisterns

D.

FSC certified wood products

Buy Now
Questions 35

What rating is used to determine a material’s sound absorption?

Options:

A.

CAC

B.

STC

C.

NRC

D.

UL (CSA)

Buy Now
Questions 36

While performing a survey of an existing elevator lobby in a sprinklered commercial building, a designer documents a dead-end corridor. How should this be corrected?

Options:

A.

coordinate with engineers to provide more sprinkler heads

B.

reconfigure the corridor to be less than 50 ft [15.2 m] in length

C.

provide a smoke detector and emergency lighting to the corridor

D.

raise the ceiling height to 10 ft [3.0 m] and include 2-hour fire-rated partitions

Buy Now
Questions 37

When evaluating a finish material’s impact on indoor air quality, the interior designer requests

Options:

A.

time for climatization

B.

carbon monoxide sensors

C.

material safety data sheets

D.

manufacturer’s specifications

Buy Now
Questions 38

How are the actual riser and tread dimensions for a set of stairs determined?

Options:

A.

Divide floor opening by desired tread dimension

B.

Divide floor opening by desired riser dimension

C.

Divide floor-to-floor height by minimum riser dimension

D.

Divide floor-to-floor height by maximum riser dimension

Buy Now
Questions 39

A contractor has notified the designer that the existing paint in a space tests positive for lead. What is the correct course of action?

Options:

A.

The lead paint should be encapsulated with oil-based paint

B.

The designer should notify the Environmental Protection Agency (EPA)

C.

A professional licensed contractor should perform lead-paint abatement

D.

A custodian should vacuum with a high-efficiency particulate air (HEPA) filter vacuum

Buy Now
Questions 40

A project is considered substantial and complete when

Options:

A.

Partial occupancy has been issued

B.

Deficiencies have been documented

C.

Progress payments have been administered

D.

The owner can use it for its intended purpose

Buy Now
Questions 41

When does a project team gather information about a company’s culture, mission, values, and business goals to understand possible challenges for a new workplace environment?

Options:

A.

programming

B.

client interview

C.

schematic design

D.

design development

Buy Now
Questions 42

In a soft goods furniture specification, what information should always be included?

Options:

A.

Fabric specification

B.

Installation instructions

C.

Location of the item on the plan

D.

Furniture vendor’s contact information

Buy Now
Questions 43

Which item causes the MOST issues when planning for systems workstations in an office space?

Options:

A.

The workstation cost is too expensive for the client’s budget

B.

The thickness of the panels was not considered when maintaining clearances

C.

The height of the panels is too low to reduce sound from traveling between workstations

D.

The electrical outlets are not maintained at the correct height to accommodate equipment

Buy Now
Questions 44

What spaces are typically grouped together in a multistory building’s service core?

Options:

A.

lobby, elevator, corridors, stairs

B.

stairs, elevator, toilet rooms, supply closet

C.

kitchen, toilet rooms, loading docks, laundry

D.

janitors closets, electrical closets, data rooms, HVAC

Buy Now
Questions 45

A corporate client tells their designer that they will be purchasing all of their ancillary furniture directly, and would only like the designer’s assistance with the remaining pieces. Which of the following would be in the designer’s scope to specify?

Options:

A.

Reception sofa

B.

Break room barstools

C.

Open office workstations

Buy Now
Questions 46

A lien has been placed on a building. What may be a probable cause for this action?

Options:

A.

A subcontractor has not been paid by the general contractor

B.

The certificate of substantial completion has not been issued

C.

The client requires more financing

D.

Contract documents do not comply with building code

Buy Now
Questions 47

A building code official has declined to issue a building permit for a project. The official explains that the plans and specifications do not meet code in terms of partition fire ratings and finishes. In order to keep the project on schedule, what would be the FIRST step in dealing with the problem?

Options:

A.

File an appeal with the city

B.

Notify the client immediately

C.

Notify the contractor by phone

D.

Discuss the problem with the code official

Buy Now
Questions 48

Who should be consulted when specifying materials and finishes to ensure maintenance adherence?

Options:

A.

Tenant

B.

Facility manager

C.

General contractor

Buy Now
Questions 49

If the net square footage [m²] is 50,000 square feet [4,645 m²] and usable square footage [m²] is 77,000 square feet [7,154 m²], what is the circulation factor?

Options:

A.

20%

B.

35%

C.

25%

D.

40%

Buy Now
Questions 50

For a public restroom (washroom) design, which wall base is the BEST option for cleanability?

Options:

A.

6" [152 mm] high rubber wall base

B.

4" [102 mm] high ceramic tile base

C.

Vinyl wallcovering that starts 1/4" [6 mm] above finished floor (AFF)

D.

Solid surface wall panels that start 2" [51 mm] above finished floor (AFF)

Buy Now
Questions 51

A client has signed a lease for a ground floor space previously used as a mobile phone retail store and plans to convert the space into a medical office. The designer should FIRST

Options:

A.

contact the building department to confirm if this use is permitted

B.

request programming information from the client and generate test fit plans

C.

survey existing space and ensure site conditions match up with CAD background

D.

confirm if the occupancy type above the space will trigger a fire separation requirement

Buy Now
Questions 52

In a large project, what is the BEST reason to enter into a joint venture?

Options:

A.

Increase the firm’s profit margins

B.

Maximize hiring of short-term staff

C.

Allocate staff resources to one project

D.

Gain experience in a new type of work

Buy Now
Exam Code: IDPX
Exam Name: Interior Design Professional Exam
Last Update: Apr 16, 2025
Questions: 175

PDF + Testing Engine

$49.5  $164.99

Testing Engine

$37.5  $124.99
buy now IDPX testing engine

PDF (Q&A)

$31.5  $104.99
buy now IDPX pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 20 Apr 2025