Winter Sale - Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dpm65

Hot Vendors
Note! The HPE0-S50 Exam is no longer available.

HPE0-S50 Integrating HPE Synergy Solutions Questions and Answers

Questions 4

A customer has HPE SY 480 modules with two CPUs and 384GB (16GB DIMMS) of memory. The customer needs to double the CPU and memory capacity for java application server.

What should a Synergy integrator do to meet the customer needs?

Options:

A.

Install an HPE Synergy SY 620 compute module and reassign the server profile.

B.

Upgrade the HPE Synergy SY 480 to two additional CPUs and replace 16GB dimms with 64Gb.

C.

Install an HPE Synergy SY 680 compute module and reassign the server profile .

D.

Upgrade the HPE Synergy SY to two additional CPUs and replicate 16 Gb dimms with 32Gb.

Buy Now
Questions 5

Use the arrow or click drag steps on the left to set up a new HPE Synergy 12000 Frame into the correct on the right.

HPE0-S50 Question 5

Options:

Buy Now
Questions 6

What should a Synergy integrator do to unresponsive HPE Synergy Link Module?

Options:

A.

Press the reset button on the form of the HPE Synergy Frame.

B.

Remove and reinstall the Frame Link Module in the originate bay.

C.

Remove and reinstall the Composer.

D.

Disconnect and reconnect the Frame Link Module from the management network.

Buy Now
Questions 7

A customer has a single frame with seven compute modules in bays 1-7. The customer has an HPE Synergy 12Gb SAS should Module in slot 1. The customer recently made a change require high availability for its storage.

Options:

A.

Install an additional Synergy integrator do to the customer to support bays 7-12

B.

Move the compute module from bay 7 to bay 12.

C.

Add another HPE Synergy 12GB SAS Connecttion module to bay 4.

D.

Move the mezzanine Card to slot 2 on each compute module.

Buy Now
Questions 8

A customer needs to expand a single-frame Synergy solution for two frames.

What should the synergy integrator do to establish a proper management network for the two frames?

Options:

A.

In the Synergy Master console, select the Frame Link Modules in the new frame and define the connection between.

B.

Connect the RJ-45 front panel connectors on the two frames together with a single CAT6A cable.

C.

Connect the RJ-45 management ports of the Virtual Connect Modules together with redundant CAT6A cables.

D.

Disconnect the existing management ring and cable the Frame Link Modules in the first frame to the Frame Link Modules in the added frame.

Buy Now
Questions 9

Which utility compares currently running firmware with the upgrade firmware for the HPe Synergy FB Switch Module.

Which allows minimal downtime during the aggrade?

Options:

A.

SMU

B.

SUM

C.

VCSU

D.

ISSU

Buy Now
Exam Code: HPE0-S50
Exam Name: Integrating HPE Synergy Solutions
Last Update: Nov 28, 2023
Questions: 60
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 21 Nov 2024