H12-425_V2.0 HCIP-Data Center Facility Deployment V2.0 Questions and Answers

Questions 4

Which air supply mode requires reasonable raised floor height?

Options:

A.

Air supply mode using blast caps.

B.

Underfloor air supply mode

C.

Air supply mode using wind pipe

D.

In-row horizontal air supply mode

Buy Now
Questions 5

If the UPS5000-E is overloaded in normal mode, it transfers to bypass mode immediately. The bypass supplies power to loads to protect the UPS.

Options:

A.

True

B.

False

Buy Now
Questions 6

Which features of Huawei integrated UPS can reduce the footprint?

Options:

A.

Intelligent alternating hibernation technology

B.

High power density design

C.

Hot swap

D.

Installation against a wall

Buy Now
Questions 7

When connecting chilled water pipes for the NetCol8000-C, fill water and preserve pressure 8 hours after the conversion adapter is connected.

Options:

A.

True

B.

False

Buy Now
Questions 8

In a project 32 NetCol8000-Cs need to be networked for teamwork. Each group consists of four air conditioners. How should the northbound RS485 grouping switches, namely, toggle switches 2 and 3 on the main control module, be set for the last air conditioner in each group?

Options:

A.

ON, ON

B.

ON, OFF

C.

OFF, ON

D.

OFF, OFF

Buy Now
Questions 9

Which of the following menus can be used by engineers to manually add devices on the NetEco?

Options:

A.

Data center planning

B.

Report management

C.

Alarm management

D.

System management

Buy Now
Questions 10

On the ECC800-Pro WebUI, which of the following is the first-level menu of the NMS Application?

Options:

A.

System Settings

B.

Maintenance

C.

Home

D.

Monitoring

Buy Now
Questions 11

The optional temperature and humidity sensor for the UP55000 cannot be cascaded.

Options:

A.

True

B.

False

Buy Now
Questions 12

Which of the following statements is false about the ECM of the UPS5000-E?

Options:

A.

As a control interface for the entire system, the ECM communicates with each module and provides a bus for communication between the dry contact card and the system control card.

B.

The ECM controls the bypass module to work properly, if one ECM is faulty, the UPS can still work in normal mode but cannot be manually switched to bypass mode.

C.

The ECM ensures equalized output currents between modules so that load power is equally shared.

D.

The ECM provides three types of CAN communication: monitoring CAN communication, intra-rack parallel CAN communication, and inter-rack parallel CAN communication.

Buy Now
Questions 13

During filling refrigerant for NetCol5000-A, there is no need to put the refrigerant steel cylinder upside down on balance.

Options:

A.

True

B.

False

Buy Now
Questions 14

During the installation of an air conditioner system, which of the following statements are correct about the draining impurities from the refrigerant pipe?

Options:

A.

Block one of the pipe ports.

B.

Fill the pipe with high-pressure nitrogen.

C.

Quickly remove the pipe plug, and avoid facing people to prevent injury.

D.

To discharge nitrogen from the outdoor unit.

Buy Now
Questions 15

Which of the following statements is true about UPS5000 power modules and bypass modules?

Options:

A.

The UPSS000-E-200K and UPS5000-E-400K use the same power module and provide the same capacity of 50 kVA but have different numbers of power modules.

B.

For UPSs of the same model but in different power segments, their bypass module capacity is the same.

C.

The power module capacity of both the UPS5000-S and UPS5000-E is 50 kVA. Therefore, the two types of UPS can be used together.

D.

The power modules used in the UPSS000-S-1200K are the same as those used in the UPS5000-E-200K.

Buy Now
Questions 16

In large-scale data centers such as financial securities centers and telecom hubs. UPSs with a capacity of 200 kVA or higher are usually used. For UPS5000-E-200k, 12 V battery packs are usually configured as backup power instead of battery racks.

Options:

A.

True

B.

False

Buy Now
Exam Code: H12-425_V2.0
Exam Name: HCIP-Data Center Facility Deployment V2.0
Last Update: Nov 19, 2024
Questions: 55

PDF + Testing Engine

$56  $159.99

Testing Engine

$42  $119.99
buy now H12-425_V2.0 testing engine

PDF (Q&A)

$35  $99.99
buy now H12-425_V2.0 pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 21 Nov 2024