You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox?

Please choose the correct answer.

Response:

Options:

A.

/ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)

B.

/ASU/SSM (ASU Simple Schedule Manager)

C.

/ASU/SHOW_NOTE (Show SAP Note via Web-Browser)

D.

/ASU/START (Start ASU Toolbox)

Buy Now
Questions 5

The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?

There are 2 correct answers to this question.

Response:

Options:

A.

Check the most recent entries shown in file sapevt.trc

B.

Check the system log (transaction SM21) of the SAP system

C.

Check the messages shown by the SUM UI

D.

Check the most recent entries in SAPup.log

Buy Now
Questions 6

What is the benefit of using the file UPGANA.XML from a previous SUM run?

Please choose the correct answer.

Response:

Options:

A.

To auto-fill specific fields on selected screens on the SUM UI

B.

To make the progress information within SUM UI more accurate

C.

To repeat specific phases during the SUM run

D.

To skip selected phases during the SUM run

Buy Now
Questions 7

You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.

Options:

A.

The upgrade of the PRD must be finished before you start new development in the DEV.

B.

The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.

C.

The transport between Unicode and non-Unicode systems is forbidden.

D.

The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.

Buy Now
Questions 8

Which preparational steps must be performed for an SAP S/4HANA conversion?

There are 2 correct answers to this question.

Response:

Options:

A.

Uninstall industry extensions not supported by SAP S/4HANA

B.

Install add-on SAP Gateway 7.50

C.

Uninstall Fiori apps not released for SAP_UI 7.50

D.

Delete client 066 (Early Watch Client)

Buy Now
Questions 9

Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?

Options:

A.

Downtime Optimized DMO (DoDMO)

B.

Near-Zero Downtime Maintenance (nZDM)

C.

Near-Zero Downtime Technology (NZDT)

D.

Downtime Optimized Data Conversion (DoC)

Buy Now
Questions 10

You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?

Please choose the correct answer.

Response:

Options:

A.

Before the downtime starts

B.

At the end of the downtime

C.

As part of the cleanup process

D.

Early in the downtime

Buy Now
Questions 11

You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

Options:

A.

Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration

B.

Unicode conversion SAP S/4HANA conversion including database migration

C.

Unicode conversion SAP S/4HANA conversion without database migration Database migration

D.

SAP S/4HANA conversion including database migration and Unicode conversion

E.

Unicode conversion Database migration SAP S/4HANA conversion without database migration

Buy Now
Questions 12

Which circumstances will allow SUM to run without the creation of a shadow system?

Please choose the correct answer.

Response:

Options:

A.

Using the main configuration option "Single System" when installing an Add-On

B.

Using the main configuration option "Single System" in case of an upgrade.

C.

Using the database migration option (DMO) for SUM

D.

Using the main configuration option "Standard" when applying SAP Support Packages

Buy Now
Questions 13

You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?

Please choose the correct answer.

Response:

Options:

A.

Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.

B.

Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.

C.

Perform the Unicode conversion before the upgrade to SAP ECC 6.08.

D.

Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.

Buy Now
Questions 14

You want to execute a Unicode Conversion only. Which approach do you need to follow?

Please choose the correct answer.

Response:

Options:

A.

SWPM using the Backup / Restore procedure

B.

SUM with DMO

C.

SUM without DMO

D.

SWPM using the Load procedure

Buy Now
Questions 15

SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.

Options:

A.

The path was stored in file host_profile during registration

B.

The path was stored to the environment of user adm during registration

C.

The path is taken from the URL entered in the browser to start SUM

D.

The path was stored in file sumabap conf during registration

Buy Now
Questions 16

You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?

Options:

A.

AA

B.

As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.

Buy Now
Questions 17

What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

Options:

A.

Standalone AS ABAP with SAP_BASIS 752 and above

B.

SAP ECC system from SAP ERP 6.0 EHP 8

C.

SAP Solution Manager 7.2

D.

SAP S/4HANA Server 1809 and above

Buy Now
Questions 18

You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.

Options:

A.

Software update

B.

Conversion

C.

Main import

D.

Migration

Buy Now
Questions 19

Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.

Options:

A.

SAP S/4HANA conversion including DMO

B.

Prerequisite check

C.

DMO without system update

D.

SAP S/4HANA conversion without DMO

E.

Benchmark tool

Buy Now
Questions 20

You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?

There are 2 correct answers to this question.

Response:

Options:

A.

Conversion of application tables (PARCONV_UPG)

B.

Activation of dictionary objects (ACT_UPG)

C.

Switch to new repository (EU_SWITCH)

D.

Modification adjustment (SPDD)

Buy Now
Questions 21

You are running an SAP ECC system.

For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?

Note There are 3 correct answers to this question

Options:

A.

Upgrade the SAP system

B.

Perform an SAP S/4 HANA conversion without DMO

C.

Perform an SAP S/4 HANA conversion including DMO

D.

Apply SAP support packages

E.

Use DMO for SUM

Buy Now
Questions 22

Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

Options:

A.

Dual Stack split

B.

Support Package Stack update

C.

Database migration

D.

Release upgrade

E.

Homogenous system copy

Buy Now
Questions 23

Which Guides contain information about SUM phases starting with "EU_CLONE_"?

There are 2 correct answers to this question.

Response:

Options:

A.

The SAP S/HANA Conversion Guide

B.

The Application Guide

C.

The major SUM Guide

D.

The DMO Guide

Buy Now
Questions 24

What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.

Options:

A.

It explains the database migration option (DMO) of SUM.

B.

It contains a section about the simplification item (SI) checks.

C.

It explains where to find information about the custom code analysis.

D.

It is a database-specific document.

Buy Now
Exam Code: E_S4HCON2023
Exam Name: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade
Last Update: Apr 14, 2025
Questions: 80

PDF + Testing Engine

$49.5  $164.99

Testing Engine

$37.5  $124.99
buy now E_S4HCON2023 testing engine

PDF (Q&A)

$31.5  $104.99
buy now E_S4HCON2023 pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 19 Apr 2025