Black Friday Special - 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dm70dm

Note! The E_S4HCON2022 Exam is no longer available. Get in touch with our Live Chat or email us for more information about the E_S4HCON2023 Exam.

E_S4HCON2022 SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Questions and Answers

Questions 4

When using the DMO of SUM, which files can be handled by SUM in the download directory?

There are 2 correct answers to this question.

Response:

Options:

A.

Parameter file SAPup_add.par

B.

Stack XML file calculated by the Maintenance Planner

C.

Breakpoint configuration file SAPUPPHAS.BRK

D.

MIGRATE J5T_DUR_XML file from a previous run

Buy Now
Questions 5

What do you need to consider when performing the SI checks for an SAP S'4I 1ANA conversion? Note There are 2 correct answers to this question.

Options:

A.

You need an SAP system based on AS ABAP 7.50 or above for the SI check framework

B.

The SI checks are executed in the development system and the results are transported into the subsequent systems

C.

The errors from the SI checks must be solved, otherwise. SUM will report an error

D.

You need to build up an SI check framework by applying SAP Notes

Buy Now
Questions 6

You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?

Please choose the correct answer.

Response:

Options:

A.

Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.

B.

Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.

C.

Perform the Unicode conversion before the upgrade to SAP ECC 6.08.

D.

Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.

Buy Now
Questions 7

What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?

Options:

A.

To optimize the migration

B.

To optimize the activation

C.

To optimize the conversion

D.

To optimize the main import

Buy Now
Questions 8

You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.

The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.

Why are 40 Process Buckets executed in parallel?

Please choose the correct answer.

Response:

Options:

A.

There is a maximum of 40 parallel R31oad processes within this specific downtime phase.

B.

SUM is still running in uptime; the number of 40 defined R31oad processes is considered.

C.

The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.

D.

These are 40 pairs of R3load processes, so there are 80 R3load processes running.

Buy Now
Questions 9

Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

Options:

A.

Dual Stack split

B.

Support Package Stack update

C.

Database migration

D.

Release upgrade

E.

Homogenous system copy

Buy Now
Exam Code: E_S4HCON2022
Exam Name: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade
Last Update: Dec 2, 2023
Questions: 73
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 24 Nov 2024