CTFL4 ISTQB Certified Tester Foundation Level CTFL 4.0 Exam Questions and Answers

Questions 4

Which of the following statements about the testing quadrants is TRUE?

Options:

A.

The higher the number of the testing quadrant, the more important the tests associated with this quadrant are

B.

Automated acceptance tests produced during BDD and ATDD are classified in quadrant 02.

C.

Exploratory tests are classified in quadrant Q3, and they are usually included in a continuous integration process.

D.

Automated unit tests produced during TDD are classified in quadrant Q4 as they are technology facing.

Buy Now
Questions 5

Which of the following statements about the typical activities of a formal review process is TRUE?

Options:

A.

Individual review is only mandatory when the size of the work product under review is too large to cover at the review meeting

B.

Various review techniques that may be applied by participants during individual review are described in the ISO/IEC/IEEE 29119-3 standard.

C.

Choosing which standards to follow during the review process is usually made during review planning.

D.

One of the main goals of the review meeting is to make sure that all participants are aware of their roles and responsibilities in the review process

Buy Now
Questions 6

Which of the following statements refers to good testing practice to be applied regardless of the chosen software development model?

Options:

A.

Tests should be written in executable format before the code is written and should act as executable specifications that drive coding

B.

Test levels should be defined such that the exit criteria of one level are part of the entry criteria for the next level

C.

Test objectives should be the same for all test levels, although the number of tests designed at various levels can vary significantly

D.

Involvement of testers in work product reviews should occur as early as possible to take advantage of the early testing principle

Buy Now
Questions 7

Which of the following statements about white-box testing is FALSE?

Options:

A.

Static testing can benefit from using code-related white-box test techniques during code reviews.

B.

White-box testing allows suggesting test cases for increasing coverage levels which are based on objective measures

C.

Achieving full code coverage for a component or a system ensures that it has been fully tested

D.

Black-box testing can benefit from using code-related white-box test techniques to increase confidence in the code.

Buy Now
Questions 8

Which of the following statements describes regression testing?

I. Retesting of a fixed defect

II. Testing of an already tested program

III. Testing of new functionality in a program

IV. Regression testing applies only to functional testing

V Tests that do not nave to be repeatable, because They are only used once

Options:

A.

II, IV, V

B.

I, III, IV

C.

II

D.

I, IV

Buy Now
Questions 9

You are testing the latest version of an air-traffic control system prior to production deployment using exploratory testing. After following an unusual sequence of input steps, the system crashes. After the crash, you document a defect report with the following information:

•Title: System crashes unexpectedly during input.

•Brief summary: System crashes when an unusual sequence of inputs is used.

•Version: V1.001

•Test: Exploratory testing prior to production deployment

•Priority: Urgent

•Risk: High

•References: Screenshot of crashed application

What critical Information Is missing from this report?

Options:

A.

Conclusions, recommendations, and approvals.

B.

Change history.

C.

Description of the defect to enable reproduction.

D.

Status of defect

Buy Now
Questions 10

Which of the following statements are true?

1. Early and frequent feedback helps to avoid requirements misunderstanding.

2. Early feedback allows teams to do more with less.

3. Early feedback allows the team to focus on the most Important features.

4. Early and frequent feedback clarifies customer feedback by applying static testing techniques

Select the correct answer:

Options:

A.

3

B.

2

C.

1

D.

4

Buy Now
Questions 11

Which of the following statements about the test pyramid is TRUE?

Options:

A.

Each layer of the test pyramid groups tests related to a single non-functional quality charactenstic.

B.

The higher the layer of the test pyramid, the more production code a single automated test within the layer tends to cover

C.

The higher the layer of the test pyramid, the more maintainable a single automated test within the layer tends to be

D.

The higher the layer of the test pyramid, the more isolated a single automated test within the layer tends to be.

Buy Now
Questions 12

A state transition diagram describes a control system’s behavior in different operational modes. The initial state is“NORMAL MODE”.

Which ONE of the following test cases covers anINVALID sequence?

Options:

A.

NORMAL MODE → DIAGNOSTIC MODE → DEGRADED MODE → EMERGENCY MODE → DIAGNOSTIC MODE → NORMAL MODE → DIAGNOSTIC MODE

B.

NORMAL MODE → DEGRADED MODE → NORMAL MODE → DIAGNOSTIC MODE → DEGRADED MODE → EMERGENCY MODE → DIAGNOSTIC MODE

C.

NORMAL MODE → DIAGNOSTIC MODE → DEGRADED MODE → EMERGENCY MODE → DIAGNOSTIC MODE → NORMAL MODE → DEGRADED MODE

D.

NORMAL MODE → DIAGNOSTIC MODE → NORMAL MODE → DIAGNOSTIC MODE → EMERGENCY MODE → DIAGNOSTIC MODE → NORMAL MODE

Buy Now
Questions 13

Which one of the following statements correctly describes the term 'debugging'?

Options:

A.

There is no difference between debugging and testing.

B.

Debugging is a confirmation activity that checks whether fixes resolved defects.

C.

Debugging is the development activity that finds, analyses and fixes defects.

D.

Debugging is of no relevance in Agile development.

Buy Now
Questions 14

Which of the following statements is not correct?

Options:

A.

Looking for defects in a system may require Ignoring system details

B.

Identifying defects may be perceived as criticism against product

C.

Looking for defects in system requires professional pessimism and curiosity

D.

Testing is often seen as a destructive activity instead of constructive activity

Buy Now
Questions 15

Which of the following are the phases of the ISTQB fundamental test process?

Options:

A.

Test planning and control, Test analysis and design, Test implementation and execution, Evaluating ex t criteria and reporting. Test closure activities

B.

Test planning, Test analysis and design. Test implementation and control. Checking test coverage and reporting, Test closure activities

C.

Test planning and control, Test specification and design. Test implementation and execution, Evaluating test coverage and reporting, Retesting and regression testing, Test closure activities

D.

Test planning. Test specification and design. Test implementation and execution. Evaluating exit criteria and reporting. Retesting and test closure activities

Buy Now
Questions 16

A typical objective of testing is to ensure that:

Options:

A.

testing is used to drive the development of a software

B.

a software has been tested using a combination of test techniques

C.

there are no defects in a software that is about to be released

D.

a software has been properly covered

Buy Now
Questions 17

Which of the following statements best describes the difference between product risk and project risk in software testing?

Options:

A.

Product risk refers to the risk associated with the project's schedule, budget, and resources, while project risk refers to the risk associated with the quality and functionality of the software product.

B.

Product risk refers to the risk associated with issues such as delays in work product deliveries, inaccurate estimates, while project risk refers to the risk associated with the project's schedule, budget, and resources.

C.

Product risk and project risk are essentially the same and can be used interchangeably.

D.

Product risk refers to the risk associated with delays in elements such as work product deliveries and inaccurate estimates, while project risk refers to the risk associated with issues such as user dissatisfaction.

Buy Now
Questions 18

Which of the following coverage criteria results in the highest coverage for state transition based test cases?

Options:

A.

Can't be determined

B.

Covering all transitions at least once

C.

Covering only start and end states

D.

Covering all states at least once

Buy Now
Questions 19

In Agile teams, testers closely collaborate with all other team members. This close collaboration could be problematic and result in testing-related organizational risks.

Which TWO of the following organization risks could be encountered?

I.Testers lose motivation and fail at their core tasks.

ii.Close interaction with developers causes a loss of the appropriate tester mindset.

iii.Testers are not able to keep pace with incoming changes in time-constrained iterations.

iv.Testers, once they have acquired technical development or business skills, leave the testing team.

Options:

A.

ii and iii

B.

i and iii

C.

i and ii

D.

ii and iv

Buy Now
Questions 20

Which ONE of the following options BEST describes Behavior-Driven Development (BDD)?

Options:

A.

Expresses the desired behavior of an application with test cases written in a simple form of natural language that is easy to understand by stakeholders—usually using the Given/When/Then format. Test cases are then automatically translated into executable tests.

B.

Defines test cases at a low level, close to the implementation, using unit test frameworks.

C.

Is primarily focused on non-functional testing techniques to ensure system reliability and performance.

D.

Requires testing to be performed after development is completed to validate software functionality.

Buy Now
Questions 21

What type of testing measures its effectiveness by tracking which lines of code were executed by the tests?

Options:

A.

Acceptance testing

B.

Structural testing

C.

Integration testing

D.

Exploratory testing

Buy Now
Questions 22

Which of the following statements about retrospectives is TRUE?

Options:

A.

Only developers and testers should be involved in retrospectives, as involving people in other roles is very likely to prevent developers and testers from having open and constructive discussions that really help identify process improvements.

B.

Retrospectives can be very effective in identifying process improvements and can also be very efficient and cost-effective especially since, unlike reviews, they do not require any follow-up activities

C.

On Agile projects, well-conducted retrospectives at the end of each iteration can help the team reduce and sometimes even eliminate the need for dairy stand-up meetings.

D.

During retrospectives, in addition to identifying relevant process improvements, participants should also consider how to implement these improvements and retain them based on the context of the project, such as the software development lifecycle.

Buy Now
Questions 23

Which of the following statements about the shift-left approach is FALSE?

Options:

A.

The shift-left approach can only be implemented with test automation

B.

The shift-left approach in testing is compatible with DevOps practices.

C.

The shift-left approach can involve security vulnerabilities

D.

The shift-left approach can be supported by static analysis tools.

Buy Now
Questions 24

The following diagram displays the logical dependencies between requirements and the individual requirement priorities. For example, "R2->R3" means that R3 is dependent on R2. Priority is indicated by the number next to the letter ”P" i.e. P1 has a higher priority than P2.

CTFL4 Question 24

Which one of the following options best describes the test execution sequence using both requirement dependency and priority

Options:

A.

R2. R1, R3. R4. R5, R6. R7, R8.

B.

R1, R2, R3, R4, R5, R6, R7, R8.

C.

R2, R4. R8, R5, R1, R6, R3, R7.

D.

. R2, R1,R3,R7,R6,R5,R4,R8.

Buy Now
Questions 25

Consider an estimation session in which a six-member Agile team (Memb1..... Memb6) uses the planning poker technique to estimate a user story (in story points). The team members will use a set of cards with the following values: 1,2, 3,5, 8,13,21. Below is the outcome of the first round of estimation for this session:

CTFL4 Question 25

Which of the following answers BEST describes how the estimation session should proceed?

Options:

A.

The final estimate of the user story in story points is determined by applying the three-point estimation technique with the following input values most optimistic estimate - 1, most likely estimate - 3, and most pessimistic estimate - 21

B.

Further estimation rounds should be performed until all team members will pick the card having the same value: this value will represent the final estimate of the user story in story points.

C.

The final estimate of the user story in story points is determined by calculating the average value between the most optimistic estimate of 21 story points (Memb4> and the most pessimistic estimate of 1 story point (Memb6)

D.

Memb6 and Memb4 which have produced the most pessimistic and the most optimistic estimates respectively, should explain the reasons of their choices to stimulate a discussion between all members before proceeding to another estimation round

Buy Now
Questions 26

The tests at the bottom layer of the test pyramid:

Options:

A.

run faster than the tests at the top layer of the pyramid

B.

cover larger pieces of functionalities than the tests at the top layer of the pyramid

C.

are defined as 'Ul Tests' or 'End-To-End tests' in the different models of the pyramid

D.

are unscripted tests produced by experience-based test techniques

Buy Now
Questions 27

Atypical generic skill required for the role of tester is the ability to

Options:

A.

Take on the role of developer to meet challenging project deadlines

B.

Assume leadership aimed at imposing decisions on the rest of the team.

C.

Use tools to make the execution of repetitive testing tasks more efficient.

D.

Determine the corrective actions to get a test project on track in case of deviations from the test plan

Buy Now
Questions 28

Which of the following characterizations applies to a test tool used for the analysis of a developer's code prior to its execution?

Options:

A.

Tool support for test design and implementation.

B.

Tool support for static testing.

C.

Tool support for test execution and logging.

D.

Tool support for performance measurement and dynamic analysis.

Buy Now
Questions 29

Which of the following best describes the relationship between a test progress report and a test summary report?

Options:

A.

The test report prepared during a test activity may be referred to as a test progress report, while a test report prepared at the end of a test activity may be referred to as a test summary report.

B.

The test report prepared during a test activity may be referred to as a test summary report, while a test report prepared at the end of a test activity may be referred to as a test progress report.

C.

There is no difference between a test progress report and a test summary report.

D.

Both the test progress report and the test summary report should always be generated via an automated tool.

Buy Now
Questions 30

In a two-hour uninterrupted test session, performed as part of an iteration on an Agile project, a heuristic checklist was used to help the tester focus on some specific usability issues of a web application.

The unscripted tests produced by the tester's experience during such session belong to which one of the following testing quadrants?

Options:

A.

Q1

B.

Q2

C.

Q3

D.

Q4

Buy Now
Questions 31

A Test Manager conducts risk assessment for a project. One of the identified risks is: The sub-contractor may fail to meet his commitment". If this risk materializes. it will lead to delay in completion of testing required for the current cycle.

Which of the following sentences correctly describes the risk?

Options:

A.

It is a product risk since any risk associated with development timeline is a product risk.

B.

It is no longer a risk for the Test Manager since an independent party (the sub-contractor) is now managing it

C.

It is a object risk since successful completion of the object depends on successful and timely completion of the tests

D.

It is a product risk since default on part of the sub-contractor may lead to delay in release of the product

Buy Now
Questions 32

Which of the following statements about the value of maintaining traceability between the test basis and test work products is not true?

Options:

A.

Traceability can be useful for assessing the impact of a change to a test basis item on the corresponding tests

B.

Traceability can be useful for determining how many test basis items are covered by the corresponding tests

C.

Traceability can be useful for determining the most suitable test techniques to be used in a testing project

D.

Traceability can be useful to support the needs required by the auditing of testing

Buy Now
Questions 33

Which ONE of the following options identifies the perspectives through which acollective authorship processgenerates a shared vision of user stories?

Options:

A.

Product owner, development, and testing

B.

Business, architecture, and testing

C.

Business, development, and testing

D.

Business, development, and acceptance testing

Buy Now
Questions 34

Which of the following lists factors That contribute to PROJECT risks?

Options:

A.

skill and staff shortages; problems in defining the right requirements, contractual issues.

B.

skill and staff shortages; software does not perform its intended functions; problems in defining the right requirements.

C.

problems in defining the right requirements; contractual issues; poor software quality characteristics.

D.

poor software quality characteristics; software does not perform its intended functions.

Buy Now
Questions 35

Which ONE of the following options MOST ACCURATELY describes the activities of “testing” and “debugging”?

Options:

A.

Testing triggers a failure that is caused by a defect in the software, whereas debugging is concerned with finding the causes of this failure (defects), analyzing these causes, and eliminating them.

B.

Testing triggers a failure that is caused by a defect in the software, whereas debugging is concerned with finding the causes of this failure (defects), analyzing these causes, and reproducing them.

C.

Testing identifies a defect that is caused by an error in the software, whereas debugging is concerned with finding the causes of this defect, analyzing these causes, and eliminating them.

D.

Testing triggers a defect that is caused by an error in the software, whereas debugging is concerned with finding the causes of this defect, analyzing these causes, and eliminating them.

Buy Now
Questions 36

For each test case to be executed, the following table specifies its dependencies and the required configuration of the test environment for running such test case:

CTFL4 Question 36

Assume that C0NF1 is the initial configuration of the test environment Based on this assumption, which of the following is a test execution schedule that is compatible with the specified dependencies and allows minimising the number of switches between the different configurations of the test environment^

Options:

A.

TC4, TC3, TC2, TC1, TC5.

B.

TCI, TC5, TC4, TC3, TC2

C.

TC4, TC3, TC2, TC5, TC1.

D.

TC4, TC1, TC5, TC2, TC3

Buy Now
Questions 37

Which of the following is a role that is usually responsible for documenting the findings (e.g., action items, decisions, recommendations) made by the review team as part of a typical formal review?

Options:

A.

Review leader

B.

Facilitator.

C.

Recorder.

D.

Moderator

Buy Now
Questions 38

The following chart represents metrics related to testing of a project that was competed. Indicate what is represented by tie lines A, B and the axes X.Y

CTFL4 Question 38

A)

CTFL4 Question 38

B)

CTFL4 Question 38

C)

CTFL4 Question 38

D)

CTFL4 Question 38

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Buy Now
Questions 39

Consider a given test plan which, among others, contains the following three sections: "Test Scope", "Testing Communication", and "Stakeholders". The features of the test object to be tested and those excluded from the testing represent information that is:

Options:

A.

not usually included in a test plan, and therefore in the given test plan it should not be specified neither within the three sections mentioned, nor within the others

B.

usually included in a test plan and, in the given test plan, it is more likely to be specified within "Test Scope" rather than in the other two sections mentioned

C.

usually included in a test plan and, in the given test plan, it is more likely to be specified within "Testing Communication" rather than in the other two sections mentioned

D.

usually included in a test plan and, in the given test plan, it is more likely to be specified within "Stakeholders" rather than in the other two sections mentioned

Buy Now
Questions 40

Metrics can be collected during and at the end of testing activities to assess which of the following?

i. Progress against the planned schedule and budget.

II. Current quality of the test object.

Hi. Adequacy of the test approach.

iv. Effectiveness of the test activities with respect to the objectives.

v. All the above.

Select the correct answer:

Options:

A.

Only i and ii.

B.

Only i and iii.

C.

Only I, ii and iv.

D.

Only v.

Buy Now
Questions 41

Consider a review for a high-level architectural document written by a software architect. The architect does most of the review preparation work, including distributing the document to reviewers before the review meeting. However, reviewers are not required to analyze the document in advance, and during the review meeting the software architect explains the document step by step. The only goal of this review is to establish a common understanding of the software architecture that will be used in a software development project.

Which of the following review types does this review refer to?

Options:

A.

Inspection

B.

Audit

C.

Walkthrough

D.

Informal review

Buy Now
Questions 42

Which ONE of the following is a GOOD testing practice that is INDEPENDENT of the chosen SDLC (Software Development Life Cycle) model?

Options:

A.

Testers are involved in reviewing work products as soon as the final version of this documentation is available so that this earlier testing and defect detection can support the “shift-left" strategy.

B.

Test analysis and design for a specific test level begin during the corresponding development phase of the SDLC, allowing testing to follow the principle of late testing.

C.

For every software development activity, there is a corresponding testing activity, ensuring that all development activities are subject to quality assurance.

D.

Different test levels have specific and overlapping test objectives, allowing tests to be appropriate to specific test object types while managing redundancy.

Buy Now
Questions 43

From a testing perspective, configuration management

Options:

A.

Allows the expected results to be compared with the actual results.

B.

Allows the tracking of all changes to versions of the testware.

C.

Includes all activities that direct and control an organisation with regard to quality

D.

Focuses on configuring static analysis tools to choose the most suitable breadth and depth of analysis.

Buy Now
Questions 44

A test manager decided to skip static testing since he believes bugs can be found easily by doing dynamic testing. Was this decision right or wrong?

Options:

A.

The decision was wrong. Ensuring quality mandates that static testing is performed after performing the dynamic testing.

B.

The decision was right. Static testing is usually redundant if a product is planned to go through a full-cycle of dynamic testing.

C.

The decision was right. Most of the bugs are easier to identify during the dynamic testing.

D.

The decision was wrong. Static testing can find defects early in the development process, reducing the overall cost of testing and development

Buy Now
Questions 45

Which of the following statements about checklist-based testing is TRUE?

Options:

A.

Checklist-based testing is a technique for managing the review meeting that can be applied in those reviews where the use of checklists is mandatory, as is often the case in formal reviews.

B.

Checklist-based testing is a review technique that can be used in a formal review process where reviewers, during individual review, try to detect issues within the work product based on a checklist

C.

In checklist-based testing, using checklists at a high level of detail is more likely to produce test cases that are easier to reproduce than those using checklists at a low level of detail

D.

Checklists used in checklist-based testing should be reviewed periodically for updates as, over time, test cases designed using the same checklist may become less effective at finding defects.

Buy Now
Questions 46

A test status report SHOULD:

Options:

A.

Specify the impediments to carrying out the planned test activities in the reporting period and the corresponding solutions put in place to remove them

B.

Be produced as part of test completion activities and report unmitigated product risks to support the decision whether or not to release the product

C.

Always be based on the same template within an organisation, as its structure and contents should not be affected by the audience to which the report is presented.

D.

Specify the lines of communication between testing, other lifecycle activities, and within the organisation that were chosen at the outset of the test project.

Buy Now
Questions 47

Consider the following statements (I to V) about software testing:

I. Can be applied to non-executable work products.

II. Can be used to measure performance efficiency.

III. Can lead to the detection of defects.

IV. Can find defects directly.

V. Can identify unexpected behaviors caused by potential defects.

Which ONE of the following options is the list that characterizes static tests the BEST?

Options:

A.

Statements I, III, and IV

B.

Statements II, IV, and V

C.

Statements I, II, and IV

D.

Statements II, III, and V

Buy Now
Questions 48

Which of the following statements is true?

Options:

A.

Experience-based test techniques rely on the experience of testers to identify the root causes of defects found by black-box test techniques

B.

Some of the most common test basis used by white-box test techniques include user stories, use cases and business processes

C.

Experience-based test techniques are often useful to detect hidden defects that have not been targeted by black-box test techniques

D.

The primary goal of experience-based test techniques is to design test cases that can be easily automated using a GUI-based test automation tool

Buy Now
Questions 49

Which of the following is a typical potential risk of using test automation tools?

Options:

A.

Reduced feedback times regarding software quality compared to manual testing.

B.

Reduced test execution limes compared to manual testing.

C.

Reduced repeatability and consistency of tests compared to manual testing

D.

Underestimation of effort required to maintain test scripts.

Buy Now
Questions 50

Which of the following work products cannot be examined by static analysis?

Options:

A.

Test plans

B.

Source code

C.

Compiled code

D.

Formal models

Buy Now
Questions 51

Which one of the following statements IS NOT a valid objective of testing?

Options:

A.

To build confidence in the level of quality of the test object.

B.

To find all defects in a product, ensuring the product is defect free.

C.

To find failures and defects

D.

To evaluate work products such as requirements, user stories, design, and code.

Buy Now
Questions 52

Who of the following has the best knowledge to decide what tests in a test project should be automated?

Options:

A.

The developer

B.

The customer

C.

The development manager

D.

The test leader

Buy Now
Questions 53

Which of the statements correctly describes when a whole team approach may NOT be suitable?

Options:

A.

When a high level of test independence may be required.

B.

When acceptance tests need to be created.

C.

When a test automation approach needs to be determined.

D.

When the team dynamics need to be improved.

Buy Now
Questions 54

Which of the following statements is TRUE?

Options:

A.

User acceptance tests are usually automated and aim to verify the acceptance criteria for user stories

B.

Acceptance criteria for user stories can include details on data definitions, for example by describing the format, allowed values, and default values for a data item

C.

Acceptance criteria for user stones should focus on positive scenarios, while negative scenarios should be excluded

D.

Tests derived from acceptance criteria for user stories are not included in any of the four testing quadrants

Buy Now
Questions 55

Which of the following is an advantage of the whole team approach?

Options:

A.

It helps avoid the risk of tasks associated with a user story not moving through the Agile task board at an acceptable rate during an iteration.

B.

It helps team members understand the current status of an iteration by visualising the amount of work left to do compared to the time allotted for the iteration

C.

It helps the whole team be more effective in test case design by requiring all team members to master all types of test techniques.

D.

It helps team members develop better relationships with each other and make their collaboration more effective for the benefit of the project.

Buy Now
Questions 56

A virtual service emulating a real third-party service and the automated test scripts (aimed at testing the system under test) that interact with that service, are test work products that are typically created during:

Options:

A.

Test monitoring and control

B.

Test implementation

C.

Test design

D.

Test analysis

Buy Now
Exam Code: CTFL4
Exam Name: ISTQB Certified Tester Foundation Level CTFL 4.0 Exam
Last Update: Mar 28, 2025
Questions: 188

PDF + Testing Engine

$49.5  $164.99

Testing Engine

$37.5  $124.99
buy now CTFL4 testing engine

PDF (Q&A)

$31.5  $104.99
buy now CTFL4 pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 04 Apr 2025