Questions 4

Identify the correspondences between architectures (from 1 to 4) and their characteristic risks (from A to D).

1.Dynamlc/cloud-based systems.

2.Client-server systems.

3.Multi-Tier systems.

4.Distributed systems.

1.Potential problems due to firewalls, packet inspection and server load balancing.

2.Critical workflows or dataflows to, from, or through unreliable or unpredictable remote servers, especially when such servers suffer periodic connection problems or intermittent periods of intense load.

3.Failures related to the correct configuration of features such as distribution, virtualization and scaling, during the Initial configuration or subsequent updates.

4.Inadequate bandwidth or capacity on any individual server.

SELECT ONE OPTION

Options:

A.

1D-2A-3C-4B

B.

1C - 2B - 3D - 4A.

C.

1A-2C-3D-4B.

D.

1C-2A-3D-4B.

Buy Now
Questions 5

Base Scenario 1: This Base Scenario 1 is used for 2 questions throughout this exam. When you refer to Base Scenario 1, you are referring to this description and only this description, without any modification.

k given project for the development of a management software that will have a multilayer architecture will enable Its users to Install it in multiple locations, nationally and internationally - each installation can operate Independently and communicate with other instances in a selective way. Each installation shall have a high processing capacity.

Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).

• The project follows a sequential development life cycle model.

Question

Which is the right moment in the project to analyze and evaluate the performance risks?

SELECT ONE OPTION

Options:

A.

After design but before coding.

B.

During the requirements activities and again before running the performance test.

C.

During the analysis and design activities as well as, again, before each performance test cycle.

D.

Repeatedly throughout the development phases (including requirements activities) and the performance test itself.

Buy Now
Questions 6

Identify the activity that is NOT part of the performance test preparation.

SELECT ONE OPTION

Options:

A.

Deploying the environment.

B.

Setting up the system under test.

C.

Setting up the load generation and monitoring tools and making sure that all the necessary information will be collected.

D.

Virtualizing the servers.

Buy Now
Questions 7

(REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2. you are referring to the description and only the description, without any modification.

Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).

• Natalie should make a presentation to the business stakeholders In order to explain the performance test plan.

Question

Which ONE of the following options contains information that should be included in Natalie's presentation to the business stakeholders?

SELECT ONE OPTION

Options:

A.

A spike test shall be conducted in a test environment equivalent to the production environment. Passengers shall be removed from the production environment, disassociated and imported Into the test environment.

B.

The cost of the spike test will be in line with the budget submitted by the cloud service provider. The test must take place in the planned timeframe and use the disassociation algorithm, that were previously agreed on.

C.

A performance test will be conducted to verify the management applications capability to support simultaneous, i.e concurrent, request peaks. The objective of this test (spike test) is to check that the system will be able to support the operations.

D.

A spike test shall be conducted in the performance test environment set up by the systems manager. Preparation includes installation from the clone of the virtual machine identified for this purpose.

Buy Now
Questions 8

Choose the option that BEST describes valid opportunities for the dynamic performance testing.

SELECT ONE OPTION

Options:

A.

During component Integration testing, across any kind of use cases and workflows, especially when integrating different use case features or Integrating with the "backbone” structure of a workflow.

B.

During system testing of overall end-to-end behaviors under various load conditions.

C.

During acceptance testing, especially for data flows and workflows across key inter-system interfaces. In system integration testing, it is not uncommon for the "user* to be another system or machine (e.g. inputs from sensor inputs and other systems).

D.

During unit testing, including using or not profiling information to determine potentialbottlenecks and white box techniques to evaluate resource utilization.

Buy Now
Questions 9

Choose the VALID description of the ramp-up concept.

SELECT ONE OPTION

Options:

A.

Stage of reaching the stationary state.

B.

Stage of finishing the test.

C.

Stage of exit from a stationary state by increasing the number of concurrent users.

D.

Technique in which the load on the system is increased to a certain value in the shortest possible time.

Buy Now
Questions 10

Refer to Base Scenario 1: When you refer to Base Scenario 1, you are referring to the description and only the description, without any modification.

Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).

•The project follows an iterative and Incremental development life cycle model.

•Development approach: Agile.

Question

Which of the statement(s) below is (are) TRUE regarding how the performance test is undertaken7

1.The performance test can have a dedicated iteration in a specific way.

2.Performance testing should be performed in a cloud-based performance test environment

3.The performance test may be conducted by a specific team.

4.A performance test cycle must be performed in each iteration by the development team (Agile).

SELECT ONE OPTION

Options:

A.

True statements: IV.

B.

True statements: III, IV.

C.

True statements: II, III.

D.

True statements: I, III.

Buy Now
Questions 11

Scenario

James is participating in a project In which a web portal is being developed to sell tickets for different types of events.

Once the sale has been made and confirmed by the payment channel, the information must be available to the rest of the types of user (for example, the managers of each event) In a maximum time of 2 seconds (It Is expected that this temporal constraint will be met in 95% of the transactions and that 90% of the transactions will be completed at 100%).

Ticket sales take place during a time window (start date and time, end date and time) that is announced in advance. At the beginning of this window, there are peaks of 150 users per minute, for 5 minutes.

Question

Choose the option that enables James to meet the performance target.

SELECT ONE OPTION

Options:

A.

Establish the acceptance criteria for response times.

B.

Create a baseline corresponding to the total number of users registered in the production database.

C.

There is no need to set a baseline for the peak attendance, it is a known value.

D.

Create a baseline for maximum attendance for the ticketing transaction.

Buy Now
Questions 12

(REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2, you are referring to the description and only the description, without any modification.

Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).

• Natalie should make a presentation to the technical stakeholders In order to explain the performance test plan.

Question

Which ONE of the following options contains information that should be included in Natalie's presentation to the technical stakeholders?

SELECT ONE OPTION

Options:

A.

A spike test shall be conducted in a test environment equivalent to the production environment. Passengers shall be removed from the production environment, disassociated and Imported into the test environment.

B.

A spike test shall be conducted in the performance test environment set up by the systems manager. Preparation includes installation from the clone of the virtual machine identified for this purpose.

C.

The cost of the spike test will be In line with the budget submitted by the cloud service provider. The test must take place within the planned timeframe and use the disassociation algorithm previously agreed.

D.

A performance test will be conducted to verify the management application s capability to support simultaneous, i.e. concurrent, request peaks. The objective is to check that the system will be able to support the operations.

Buy Now
Exam Code: CTFL-PT_D
Exam Name: ISTQB Certified Tester Foundation Level - Specialist Performance Testing
Last Update: Oct 22, 2024
Preorder
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 24 Oct 2024