Questions 4

Which of the following test categories would best characterize a test designed to confirm that the data backup tapes stored offsite by a bank can be retrieved and loaded within the business process service level agreement?

Options:

A.

Hazard testing

B.

Reliability testing

C.

Security testing

D.

Continuity testing

Buy Now
Questions 5

A product risk assessment has revealed the following product risks:

• lack of usability requirements

• security during on-line transactions

• perceived performance of the system and response time from the user interface

• a required availability of almost 100%

To address the 4th risk, which of the following quality characteristics for technical testing should be part of the test approach?

Options:

A.

Adaptability

B.

Reliability

C.

Portability

D.

Compatibility

Buy Now
Questions 6

A risk-based approach is being taken to test a new web-based retail application. Which of the following activities is the Technical Test Analyst NOT usually expected to perform?

Options:

A.

Understanding the probability of each technical product risk

B.

Assessing the likelihood of identified security risks

C.

Assessing the business impact of identified performance risks

D.

Designing tests to mitigate identified reliability risks

Buy Now
Questions 7

Which statement is correct with respect to a mobile emulator tool?

Options:

A.

A mobile emulator models the mobile platform's runtime environment but not the hardware. The tested application differs from the application that will be distributed

B.

A mobile emulator models the hardware and utilizes the same runtime environment as the physical hardware. The tested application could also be used by the real device

C.

Unlike a mobile simulator tool, an emulator does not allow the setting of various usage parameters

D.

A mobile emulator tests the performance of a mobile device by subjecting it to high application loads

Buy Now
Questions 8

An enhancement to a Social Media application allows for the creation of new Groups. Any number of existing application members can be added to a

Group. An attempt to add a non-existing member of the application to a Group will result in an error. Members can also be removed from an existing Group.

Existing Groups can also be deleted but only if there are no current members attached to it.

Which keyword-driven input table provides an adequate test of this enhancement?

Options:

A.

CTAL-TTA Question 8 Option 1A group of people in a group Description automatically generated

B.

8A group of people in a table Description automatically generated

C.

8A group of people in a group Description automatically generated

D.

8A group of people in a group Description automatically generated

Buy Now
Questions 9

Which statement correctly describes service virtualization’’

SELECT ONE OPTION

Options:

A.

It is a shareable testing service that simulates the behavior, data and performance of a system or service to which the product or component under test would normally be connected

B.

It is a service which automatically deploys new versions of the software into the production environment at regular and short intervals

C.

it is an integrated set of tools that will automatically compile, test and deliver into a virtual environment a new build of the product under test

D.

it is a collection of mock objects such as stubs and drivers that will allow a product or component to run without some other product or component that it would normally need

Buy Now
Questions 10

Consider the following control flow graph:

CTAL-TTA Question 10

The control flow represents a software component of a car navigation system. Within the project the maximum cyclomatic complexity to be allowed is set at 5.

Which of the following statements is correct?

Options:

A.

No defect needs to be reported since the cyclomatic complexity of the component is calculated at 3.

B.

No defect needs to be reported since the cyclomatic complexity of the component is calculated at 4

C.

No defect needs to be reported since the cyclomatic complexity of the component is calculated at 5.

D.

A defect needs to be reported since the cyclomatic complexity of the component is calculated at 6.

Buy Now
Questions 11

Which of the following is a reason for the Technical Test Analyst to take the time to prepare for a code review?

Options:

A.

Allows the reviewer time to consider the Interaction of the item being reviewed with other items In the system

B.

Allows time to prepare the test data

C.

Allows time to gather the test metrics for management review

D.

Allows time to plan the design and implementation of the item being reviewed

Buy Now
Questions 12

Which of the following defect types is NOT an example of a defect type typically found with API testing?

Options:

A.

Data handling issues

B.

Timing problems

C.

High architectural structural complexity

D.

Loss of transactions

Buy Now
Questions 13

Which of the following statements is TRUE regarding tools that support component testing and the build process?

Options:

A.

Both are used to examine source code before a program is executed. This is done by analysing a section of code against a set (or multiple sets) of coding rules.

B.

Both are used to reduce the costs of test environments by replacing real devices.

C.

Both provide run-time information on the state of the software code, e.g., unassigned pointers and the use and de-allocation of memory.

D.

Both provide an environment for unit testing in which a component can be tested in isolation with suitable stubs and drivers.

Buy Now
Questions 14

A new application for planning journeys on public transport is being developed that will work on mobile devices. Why would you MOST likely include Portability testing in the test plan?

Options:

A.

To evaluate the degree to which it is easy to operate and control

B.

To evaluate the degree to which its components can be used in other systems

C.

To evaluate the effectiveness and efficiency in which it can be successfully uninstalled in a specified environment

D.

To evaluate the degree to which the system is operational and accessible when required for use

Buy Now
Questions 15

You are involved in testing a system in the medical domain. Testing needs to comply with the FDA requirements and is rated as being safety critical. A product risk assessment has been performed and various mitigation actions have been identified. Reliability testing is one of the test types that needs to be performed throughout the development lifecycle.

Based on the information provided, which of the following activities would need to be addressed in the test plan?

Options:

A.

Perform a vulnerability scan.

B.

Design and execution of specific tests that evaluate the software's tolerance to faults in terms of handling unexpected input values.

C.

Design and execution of test cases for scalability.

D.

Testing whether the installation/de-installation can be completed.

Buy Now
Questions 16

Which of the following is a generic risk factor that should be considered by a Technical Test Analyst during a product risk analysis?

Options:

A.

Frequency of use of the affected feature by end-users.

B.

Complexity of new technology.

C.

Visibility of failure leading to negative publicity and potential image damage.

D.

High change rate of business requirements.

Buy Now
Questions 17

Which of the following is true regarding maintainability?

Options:

A.

This factor Is critical for the initial success of the product launch

B.

This factor becomes more Important the longer the system remains in the production environment

C.

This factor will influence the performance of the system

D.

This factor affects resource utilization

Buy Now
Questions 18

A review of the following pseudo code is to be performed using a checklist:

Module Vowel Counter

Message: array of Characters

M, N: Integer

ACount, ECount, ICount, OCount, UCount: Integer

BEGIN

I=1

Read Nextchar

While Nextchar <> 'S'

DO

Message (I) = Nextchar

I = I+1

Read Nextchar

ENDWHILE

FOR M = 1 To I

DO

Print (Message(M))

IF Message (M) = 'E'

THEN

ECount = ECount + 1

ELSE

IF Message (M) = 'A'

THEN

ACount = ACount + 1

ELSE

IF Message (M) = 'I'

THEN

ICount = ICount + 1

ELSE

IF Message (M) = 'O'

THEN

OCount = OCount + 1

ELSE

IF Message (M) = 'U'

THEN

UCount = UCount + 1

ENDIF

ENDIF

ENDIF

ENDIF

ENDIF

ENDFOR

Print ('Message contains ' ACount + ECount + ICount + OCount + UCount ' vowels')

END

Which of the following checklist items would find code errors in this scenario?

A) Are all variables properly declared?

B) Are all loops, branches, and logic constructs complete, correct, and properly nested?

C) Are all cases covered in an IF-ELSEIF, including ELSE or DEFAULT clauses?

D) Are loop termination conditions obvious and invariably achievable?

E) Are there any redundant or unused variables?

Options:

A.

b and c

B.

a and e

C.

c and d

D.

a and d

Buy Now
Questions 19

A new reusable software component that handles sensor management has been developed. It will be used in manufacturing processes that work at SIL 2 and avionics systems where failure could lead to a "major" incident. The code contains no loops but does contain decisions with multiple conditions. Which of the following would be the BEST structure-based testing option for the new software?

Options:

A.

MC/DC coverage

B.

API coverage

C.

Decision coverage

D.

Statement coverage

Buy Now
Questions 20

Consider the following section of code:

If ((A > B) or (C > D)) and (E = F) then

print A:

Endif

Which of the following sets of test data can be used to achieve Modified Condition/Decision Coverage with the least number of tests?

CTAL-TTA Question 20

Options:

A.

Set 3

B.

Set 4

C.

Set 2

D.

Set 1

Buy Now
Questions 21

Consider the pseudo code for the Price program:

CTAL-TTA Question 21

Which of the following statements about the Price program describes a control flow anomaly to be found in the program?

Options:

A.

The Price program contains no control flow anomalies.

B.

The Price program contains unreachable code.

C.

The Price program contains data flow defects.

D.

The Price program contains an infinite loop.

Buy Now
Questions 22

Why could test cases need to be refactored in an Agile project?

SELECT ONE OPTION

Options:

A.

To maintain bi-directional traceability with the user stories

B.

To increase the breadth of black box coverage

C.

To make them easier to understand and cheaper to modify

D.

To ensure that the tests and code remained aligned

Buy Now
Questions 23

You are responsible for the performance testing of a new web application. In particular, you are interested in determining if you have enough and the right type of servers to handle 10,000 concurrent users. Which is the primary consideration when you are selecting your performance testing tools?

Options:

A.

The ability of the tool to support capture/replay

B.

The ability of the tool to detect invalid HTML

C.

The ability of the tool to exercise the graphical user interface to record the user experience

D.

The ability of the tool to generate load at the communications protocol level

Buy Now
Questions 24

Consider the code fragment provided below:

CTAL-TTA Question 24

The comment frequency of the code fragment is 13%.

To which non-functional quality characteristic does a good level of comment frequency especially contribute?

Options:

A.

Portability

B.

Maintainability

C.

Usability

D.

Performance Efficiency

Buy Now
Questions 25

Which statement about test automation is TRUE?

SELECT ONE OPTION

Options:

A.

Increasing test automation levels may decrease the frequency at which continuous deployments to production can be made

B.

Increasing test automation levels will eliminate the need for manual testing during continuous deployment

C.

Increasing test automation levels to increase the frequency of continuous deployment should always be an objective

D.

Minimizing the test suite by selecting, preparing and running only a subset of tests by using risk analysis should always be an objective

Buy Now
Questions 26

Consider the following code segments.

Segment 1:

If a > b then setc = 12

elseif c >7 set c = 5

endif

Segment 2: setc= 12 for n = 1 to c

display c

endfor

Segment 3:

If (a > b) or (c < d) then

set c = 12

else

set c = 5

endlf

Segment 4:

set y = 4

call (segments)

segments:

start

for I = 1 to y

print y

endfor

end

Which segment would receive the highest cyclomatic complexity value?

Options:

A.

Segment 1

B.

Segment 2

C.

Segment 3

D.

Segment 4

Buy Now
Questions 27

Which of the following is NOT a common issue with traditional capture/playback test automation?

Options:

A.

Difficult to maintain when software changes.

B.

Recorded scripts are difficult to maintain by non-technical persons.

C.

Data and actions are mixed in the recorded script.

D.

Execution of the recorded script is difficult outside office hours.

Buy Now
Questions 28

At which test level would performance efficiency testing most likely be performed?

Options:

A.

Component testing

B.

Integration testing

C.

System testing

D.

User acceptance testing

Buy Now
Questions 29

Installability testing is usually conducted during which stage in the application's SDLC and usually includes which other types of testing?

Options:

A.

System testing, with functionality and usability testing

B.

Integration testing, with functionality and performance testing

C.

Unit testing, with security and performance testing

D.

Acceptance testing, with usability and accuracy testing

Buy Now
Questions 30

You are working on an internet banking project. Your company is offering this product to the financial market. For each new customer, some customization will typically be needed. To make the product successful there is a strong focus during development on a reliable and maintainable architecture. To support architectural reviews, a checklist will be developed. Within the checklist specific sections will be attributed to reliability and maintainability.

Which question from the list below should you include in the maintainability section of the architectural review checklist?

Options:

A.

Will the system use n-version programming for critical components?

B.

Will the user interface be implemented independently from the other software modules?

C.

Does the system have user-friendly error messages?

D.

Does the password protection of the system adhere to the latest regulations?

Buy Now
Questions 31

Which option below BEST explains the value of a test charter in exploratory testing"5

SELECT ONE OPTION

Options:

A.

It provides expected test outcomes against which defects, if found, can be reported.

B.

It provides guidance for the tester at the beginning of a test session

C.

it provides bi-directional traceability to aspects of the epic or story under test

D.

It provides a way to prevent a test session’s timebox from being exceeded

Buy Now
Questions 32

Which TWO of the following are generic PRODUCT risk factors that should be considered by a Technical Test Analyst?

a)A high number of performance efficiency defects in the software

b)Inaccurate arithmetic calculations in key business areas cj Particularly complex code

d) Communication issues with geographically distributed teams

e) Usability-’ issues with the design of the user interface

Options:

A.

a and b

B.

a and c

C.

b and d

D.

c and e

Buy Now
Questions 33

You are a Technical Test Analyst preparing load test scripts. You have been invited to a technical review of the system's operational profile document produced by the business. The meeting is next week, during your preparation you notice that volumetric data covering projected transaction volumes will be held in a separate document that will not be available before the meeting. What would be the BEST course of action?

Options:

A.

Request that the meeting be delayed until the volumetric document has been drafted and examined by the reviewers

B.

To avoid delay to the project, attend the review as scheduled and raise the issue at the meeting

C.

State that you are not a mandatory reviewer but request that both documents be sent to you once agreed

D.

Delay the review but limit schedule impact by presenting the volumetric document to the reviewers during the meeting

Buy Now
Questions 34

You are part of an agile team creating a user story.

Which of the following requirements engineering techniques would you use to provide a visual representation of the system and help to see the 'overall* story with the functional flow?

SELECT ONE OPTION

Options:

A.

Personas

B.

Use Cases

C.

Story Mapping

D.

Storyboards

Buy Now
Questions 35

Which statement about test automation being applied to a reactive test approach, is CORRECT’

SELECT ONE OPTION

Options:

A.

Automation of test execution in exploratory test sessions can lead to increased efficiency and wider coverage of user stories

B.

BDD can be used within a reactive testing approach by producing automated tests in parallel with the implementation of the user story

C.

For projects that must comply with externally defined regulations, the automated tests and their results must be traceable back to requirements

D.

An increase in automated test coverage can lead to a greater degree of exploratory testing addressing high risk areas

Buy Now
Questions 36

Which option describes a good practice when applying test automation for a Regression-averse test approach?

SELECT ONE OPTION

Options:

A.

Developing and maintaining automated test checklists to efficiently execute a stable set of tests

B.

Applying BDD to produce automated tests before the implementation of a user story

C.

Focusing on the continuous improvement and refactoring of the automated tests

D.

Increasing automated test coverage to allow more time for exploratory testing

Buy Now
Questions 37

What is MOST likely to be a consideration when implementing a new performance test tool?

Options:

A.

The lack of flexibility in the tool may mean that it is unable to generate incorrect inputs for all the different types of virtual user

B.

The load generation suggested by the operational profiles of the users may exceed the available hardware and network bandwidth of the tool

C.

The model used to describe the intended execution-time behavior of the system under test may not be compatible with the tool

D.

The language used for programming the system under test may be different from that used to develop the tool

Buy Now
Questions 38

Consider the following section of code:

If ((A > B) or (C > D)) and (E = F) then

print A;

Endlf

Which of the following sets of test data can be used to achieve multiple condition coverage with the least number of tests?

CTAL-TTA Question 38

Options:

A.

Set 4

B.

Set 3

C.

Set 2

D.

Set 1

Buy Now
Questions 39

Below is the pseudo-code for the Win program:

CTAL-TTA Question 39

The bingo program contains a data flow anomaly. Which data flow anomaly can be found in this program?

Options:

A.

Variable 'A" is not assigned a value before using it.

B.

Variable 'D" is defined but subsequently not used.

C.

The program does not contain any comments.

D.

It is recommended to use a variable instead of the hard-coded print results "Win" and *Loose".

Buy Now
Questions 40

A new web site has been launched for a testing conference. There are a number of links to other related web sites for information purposes. Participants like the new site but complaints are being made that some (not all) of the links to other sites do not work.

Which type of test tool is most appropriate in helping to identify the causes of these failures?

Options:

A.

Review tool

B.

Hyperlink tool

C.

Static analysis tool

D.

Dynamic analysis tool

Buy Now
Questions 41

A new Payroll system calculates the amount of tax that each employee must pay (TaxToPay) on their gross monthly salary (in (), and the net salary (NetSal) that they will receive after that amount of tax has been deducted It also calculates the amounts of tax (TaxPdYTD) and net salary (SalPdYTD) paid in the year to date (YTD) by adding them to the stored amounts from last month (for month 1 these will be zero), inputs Include Employee id (Empid) and Gross Salary this month (GrossSal). Tax Rate is looked up on the key of Employee Id, the amounts of tax and net salary paid in the year to date are looked up on the key of (Employee Id and [month • 1]) except that for month 1 they will be zero.

if both employees were paid the same in month 1 as in the current month 2. for which tax has now to be calculated, which data-driven input and expected output table is correct for this situation?

Table 1

MonthEmpidGrossSalTaxRateTaxToPayNetSalTaxPdYTD

212000153001700600

222200204401760880

Table 2

MonthEmpidGrossSalTaxRateTaxToPayNetSalSalPdYTD

2120000.153001700600

2222000.24401760880

Table 3

MonthEmpidGrossSalTaxToPayNetSalTaxPdYTDSalPdYTD

11200030017006003400

12220044017608803520

Table 4

MonthEmpidGrossSalTaxToPayNetSalTaxPdYTDSalPdYTD

21200030017006003400

22220044017608803520

SELECT ONE OPTION

Options:

A.

Table 3

B.

Table 1

C.

Table 4

D.

Table 2

Buy Now
Questions 42

Which option below describes the BEST approach for testing a Medium risk mission- or safety-critical system?

SELECT ONE OPTION

Options:

A.

Automated tests recommended. Exploratory tests recommended, manual Black-box tests recommended

B.

Automated tests recommended. Exploratory tests highly recommended, manual Black box tests recommended.

C.

Automated tests optional (neutral). Exploratory tests highly recommended, manual Black-box tests optional (neutral).

D.

Automated tests optional. Exploratory tests highly recommended, manual Black-box tests recommended

Buy Now
Questions 43

Which of the following statements about Application Programming Interface (API) testing is TRUE?

Options:

A.

API testing cannot be applied to distributed systems

B.

Combinatorial testing cannot be applied to API testing

C.

API testing may require the use of specialized tools

D.

APIs are loosely coupled, so timing glitches will not happen

Buy Now
Questions 44

A medical company has performed a safety criticality analysis using the IEC61508 standard. The software components to be developed have been categorized by Safety Integrity Level (SIL). Most components have been rated at SIL 1 or 2, and a few components at SIL 4.

After some discussions with the QA manager, the project has decided to adhere to the recommendations for test coverage provided by the IEC61508 standard.

Which level and type of test coverage should at least be used for the components rated at Safety Integrity Level (SIL) 2?

Options:

A.

100% statement coverage, 100% decision coverage and 100% multiple condition coverage

B.

100% statement coverage, 100% decision coverage and 100% MC/DC coverage

C.

100% statement coverage and 100% decision coverage

D.

100% statement coverage

Buy Now
Questions 45

Below is pseudo-code which calculates a customer's cruise credits based on past cruise history:

PROGRAM CALC CRUISE CREDITS (CUST_ID) COUNT_CRUISES, CRUISE_CREDITS, LOYALTY_RATING: INTEGER CRUISE_LENGTH, CRUISE_ACCOM_TYPE: VAR

    LOYALTY_RATING = 0

    COUNT_CRUISES = 0

    CRUISE_LENGTH = 0

    CRUISE_ACCOM_TYPE = 0

    BEGIN

    READ CUSTOMER'S CRUISE HISTORY TO OBTAIN COUNT OF CRUISES

    READ CRUISE_HISTORY (CUST_ID)

    WHILE COUNT_CRUISES != -1 DO

    READ CUSTOMER'S NEXT CRUISE

    READ NEXT_CRUISE

    IF CRUISE_ACCOM_TYPE = 3 THEN

    CRUISE_CREDITS = CRUISE_CREDITS + 5

    ELSE

    IF CRUISE_ACCOM_TYPE = 2 THEN

    CRUISE_CREDITS = CRUISE_CREDITS + 3

    ELSE

    CRUISE_CREDITS = CRUISE_CREDITS + 2

    ENDIF

    ENDIF

    COUNT_CRUISES = COUNT_CRUISES - 1

    ENDWHILE

    LOYALTY_RATING = CRUISE_CREDITS / COUNT_CRUISES

    WRITE ("CRUISE CREDIT TOTAL IS:")

    WRITE (CRUISE_CREDITS)

    END PROGRAM CALC CRUISE CREDITS

The code contains data flow anomalies on lines 14 and 27. Which examples of data flow anomalies can be found on these lines?

Options:

A.

Line 14: Cruise_Credits is not assigned a value (defined) before being used Line 27: Loyalty_Rating is defined but not subsequently used

B.

Line 14: Cruise_Credits is defined but not subsequently used Line 27: Loyalty_Rating is not assigned a value (defined) before being used

C.

Line 14: Cruise_Credits is re-defined before being used Line 27: Loyalty_Rating is defined but not subsequently used

D.

Line 14: Cruise_Credits should not be declared as an integer Line 27: Loyalty_Rating should be calculated within the While loop

Buy Now
Questions 46

A major Caribbean bank typically develops their own banking software using an Agile methodology. However, for some specific components COTS software is acquired and used. The bank does not want to create a dependency on any external COTS supplier.

As part of the test approach, portability testing will be performed. Which portability sub-characteristic is especially relevant for the Caribbean bank?

Options:

A.

In stall ability

B.

Adaptability

C.

Replaceability

D.

Co-existence

Buy Now
Questions 47

Which of the following statements is true regarding API and GUI testing?

Options:

A.

API testing usually tests Individual inputs rather than combinations whereas GUI testing usually tests combinations

B.

In a service-oriented architecture. GUI testing is more important because of the need to verify the service supplied to the user

C.

Negative testing is used primarily with GUI testing

D.

API testing usually requires the use of tools, whereas GUI testing usually does not

Buy Now
Questions 48

You are testing software that will be used in nuclear power plants. The particular piece of code you are testing has been classified as SIL 2. The following section of code falls under this classification:

If ((A > B) or (C > D)) and (E = F) then print A

Endif

Which of the following sets of test data would supply the minimum tests needed to achieve the "highly recommended" level of coverage?

CTAL-TTA Question 48

Options:

A.

Set 1

B.

Set 3

C.

Set 5

D.

Set 2

Buy Now
Questions 49

You are asked to provide a practical and pragmatic testing solution for a commercial system where the main user interface is via the Internet. It is critical that the company’s existing good name and market profile are not damaged in any way. Time to market is not a critical issue when appropriate testing solutions are identified to mitigate business risks.

A product risk assessment has revealed the following product risk:

• Abnormal application termination due to connection failure of the main interface.

Which of the following is the appropriate test type to address this risk?

Options:

A.

Performance efficiency testing

B.

Portability testing

C.

Reliability testing

D.

Operability testing

Buy Now
Questions 50

Which of the following are activities that the Technical Test Analyst performs when setting up a test automation project?

1.Schedule the manual testing

2.Define interface requirements between tools

3.Perform a code review on the functional specifications

4.Determine whether to use a rule-dnven approach

5.Tram the test analysts to use and supply the data

Options:

A.

1.2

B.

3. 5

C.

1.4

D.

2,5

Buy Now
Questions 51

Which of the following statements about fault seeding tools is correct?

Options:

A.

Fault seeding tools insert defects into the source code to check the effectiveness of testing.

B.

Fault seeding tools insert defects into the source code to test the input checking capabilities of the software.

C.

Fault seeding tools insert defects into the source code to support the application of specification-based test design techniques.

D.

Fault seeding tools insert defects into the source code to check the level of maintainability of the software.

Buy Now
Questions 52

Which of the following statements about performance testing tools is NOT correct?

Options:

A.

Typical metrics and reports provided by performance testing tools include the number of simulated users throughout the test, and the number and type of transactions generated by the simulated users, and the arrival rate of the transactions.

B.

Significant factors to consider in the implementation of performance testing tools include the flexibility of the tool to allow different operational profiles to be easily implemented, and the hardware and network bandwidth required to generate the load.

C.

Performance testing tools typically drive the application by simulating user interaction at the graphical user interface level to more accurately measure response times.

D.

Performance testing tools generate a load by simulating a large number of virtual users following their designated operational profiles to generate specific volumes of input data.

Buy Now
Exam Code: CTAL-TTA
Exam Name: Certified Tester Advanced Level Technical Test Analyst
Last Update: Dec 1, 2024
Questions: 175

PDF + Testing Engine

$57.75  $164.99

Testing Engine

$43.75  $124.99
buy now CTAL-TTA testing engine

PDF (Q&A)

$36.75  $104.99
buy now CTAL-TTA pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 04 Dec 2024