Winter Sale - Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dpm65

Hot Vendors

CQE Certified Quality EngineerExam Questions and Answers

Questions 4

When a 24 experiment is fractionated to a 24'5 experiment, the fractioned design is also known as a

Options:

A.

90% fraction

B.

75% fraction

C.

fraction

D.

fraction

Buy Now
Questions 5

Which of the following statements BEST describes a bimodal distribution?

Options:

A.

This distribution shows stratified data and two distinct peaks.

B.

This distribution shows a single mode and bell shaped distribution.

C.

This distribution is truncated.

D.

This distribution has several distribution peaks.

Buy Now
Questions 6

Which of the following is the most important aspect of a successful quality improvement effort?

Options:

A.

Employee participation

B.

Financial comminnent

C.

Management commitment

D.

Organizational need

Buy Now
Questions 7

In a sample of 2.000 items taken from a large lot. 80 are found to be nonconforming. What is the 95% confidence interval for the proportion of nonconforming items?

Options:

A.

[0.0328. 0.0472]

B.

[0.0314. 0.0486]

C.

[0.0308. 0.0499]

D.

[0.0302. 0.049

Buy Now
Questions 8

When a company is developing a quality information system, the most important factor is the

Options:

A.

needs of the end user of the system

B.

input from the quality department

C.

level of oversight by senior management

D.

method of collecting data used in the system

Buy Now
Questions 9

A three-level, two-variable, full factorial experiment is to be run. The minimum number of runs will be

Options:

A.

6

B.

8

C.

9

D.

18

Buy Now
Questions 10

Writing and establishing process control procedures is

Options:

A.

Disposition.

B.

Notification.

C.

Preventive action.

D.

Corrective action.

Buy Now
Questions 11

Which of the following types of planning uses a strategic planning process that relates idealistic goals to work strategy?

Options:

A.

Yoji planning

B.

Hoshin planning

C.

Juran planning

D.

Deining planning

Buy Now
Questions 12

In the failure rate model shown below, which one of the sections represents the period when catastrophic failures are likely to occur?

Options:

A.

A

B.

B

C.

C

D.

All sections can experience catastrophic failure.

Buy Now
Questions 13

A graph of a data set, composed of a series of rectangles, each proportional in width to the range of values in a class and proportional in height to the number of items or fraction of items falling in these classes, is called which of the following?

Options:

A.

Histogram.

B.

Raw data.

C.

Ogive.

D.

Venn diagram.

Buy Now
Questions 14

Which of the following equations is used to calculate the upper control limit for an average chart?

Options:

A.

x-a2r

B.

x-a2 r

C.

X+ D4 R

D.

X-D-R

Buy Now
Questions 15

If the mean time between failures (MTBF) for a device is 200 hours, what is the constant failure rate per hour?

Options:

A.

0.005

B.

0.002

C.

0.500

D.

0.200

Buy Now
Questions 16

Which of the following tools begins at the point of failure and works back through the process to the components?

Options:

A.

Fault tree analysis

B.

Pugh matrix

C.

Cause and effect matrix

D.

Kappa analysis

Buy Now
Questions 17

Which of the following definitions describes severity?

Options:

A.

Probability that the failure would be avoided or detected

B.

Probability that the failure will occur

C.

Effect on uncertainty on objectives

D.

Impact that the failure would have

Buy Now
Questions 18

When trying to find all possible causes of a problem, which of the following tools would be useful?

Ⅰ. Systematic troubleshooting and brainstorming.

Ⅱ. Fishbone diagrams and histograms.

Ⅲ. Checklists and scatter diagrams.

Ⅳ. Control charts and graphs.

Options:

A.

I and IV only

B.

I, II and IV only

C.

II, III and IV only

D.

I, II, III and IV

Buy Now
Questions 19

Refer to the following FMEA table. The columns labeled S. O. and D. refer to ratings of severity, occurrence, and detection, respectively.

CQE Question 19

Which potential failure mode is most likely to be seen by a customer?

Options:

A.

No solder

B.

Too much solder

C.

Location of solder

D.

Stringing solder

Buy Now
Questions 20

The values of two different variables are related to each other such that an increase in the value of the first variable is accompanied by a decrease in the value of the second variable. If the variables are perfectly correlated, their correlation coefficient will be equal to

Options:

A.

2.0

B.

1.0

C.

0.0

D.

-1.0

Buy Now
Questions 21

The failure rate model above is used to show a typical relationship of many parts between their failure rate and the time in service. The reliability function for period "B" is BEST represented by

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Buy Now
Questions 22

Under a defect classification system, a nonconformance that could cause a product's usability to be substantially reduced would be classified as

Options:

A.

acceptable

B.

minor

C.

major

D.

critical

Buy Now
Questions 23

The following is an incomplete ANOVA table.

SourcessdfMSF

Treatment3334

Error20

Total64324

What is the value of the F-statistic used to test for differences in treatment?

Options:

A.

0.21

B.

1.07

C.

2.87

D.

5.37

Buy Now
Questions 24

A process has the following output characteristics:

Mean = 28.65

Median = 24

Mode = 20

The uniniodal distribution with these characteristics is defined as

Options:

A.

skewed left

B.

skewed right

C.

not skewed

D.

s-shaped

Buy Now
Questions 25

Statistical process control was originated by

Options:

A.

Deming

B.

Feigenbaum

C.

Jurau

D.

Shewhart

Buy Now
Questions 26

Which of the following tools is used to plan for and avoid situations that might interfere with project implementation?

Options:

A.

Affinity diagram

B.

Matrix diagram

C.

Interrelationship digraph

D.

Process decision program chan

Buy Now
Questions 27

A company incurred the following quality costs last month.

Incoming material inspection$5,000

Process scrap$3,000

In-process reworkS450

Control engineering$450

Warranty$2,000

Customer complaints$6,000

Product liability$1,000

What is the total cost of external failures?

Options:

A.

$6000

B.

$8000

C.

$9000

D.

$9450

Buy Now
Questions 28

Which of the following tools specifies the use of a feedback cycle?

Options:

A.

Flowchart

B.

Cycle-time reduction

C.

Gantt chart

D.

Plan-do-check-act

Buy Now
Questions 29

A production line has job aids that outline, step by step, how to perform the tasks of the job. This is followed by each of the operators working on the line. This is an example of

Options:

A.

take time

B.

5S

C.

standardized work

D.

value stream mapping

Buy Now
Questions 30

In a value stream analysis, inspection is typically classified as

Options:

A.

real value added

B.

organizational value added

C.

non-value added

D.

customer value added

Buy Now
Questions 31

A test-retest study is performed to a coordinate measuring machine (CMM) using a working standard of 100.00 ± 0.001 mm (95% confidence). The length of the standard is measured 30 rimes. The mean and standard deviation of the measurements are x = 107.883 mm and 5 = 2.497 mm. All of the measurements are made are the same location on the standard and are taken by the same technician, who mounts and dismounts the unit for each measurement.

The precision of the CMM is estimated to be

Options:

A.

0.456

B.

2.497

C.

7.833

D.

12.735

Buy Now
Questions 32

In a failure mode and effects analysis (FXIEA). the focus should be on

Options:

A.

classifying as failures those items with risk priority numbers greater than 100

B.

creating flowchans for the items with high risk priority number or occurrence values

C.

implementing corrective action on items that have high alpha risk values

D.

implementing corrective action on items that have high risk priority number or severity values

Buy Now
Questions 33

The probability of an accident for the head event "H" given below is:

Options:

A.

0.0700

B.

0.1125

C.

0.0689

D.

0.1100

Buy Now
Questions 34

When measurements are taken using a reference scale, such as a pair of calipers, the resulting data are referred to as

Options:

A.

classified

B.

attribute

C.

discrete

D.

continuous

Buy Now
Questions 35

The design function which assigns probability of failures between components or subsystems is called

Options:

A.

Apportionment.

B.

Significance

C.

Confidence.

D.

Qualification.

Buy Now
Questions 36

A material review board (MRB) gets its authority to act from which of the following functions?

Options:

A.

Executive management

B.

Purchasing

C.

Engineering

D.

National or international standards

Buy Now
Questions 37

Which of the following assumptions is a robustness factor suitable for validating statistical conclusions?

Options:

A.

Low reliability of measures

B.

High statistical power

C.

Low reliability of treatment

D.

Violated expectations of test

Buy Now
Questions 38

Which of the following symbols represents process performance index?

Options:

A.

CP

B.

Cpk

C.

ppk

D.

P

Buy Now
Questions 39

Which of the following problem-solving tools is a column graph which displays a static picture of the process?

Options:

A.

Pareto chart.

B.

Control chart.

C.

Histogram.

D.

Cause and effect diagram.

Buy Now
Questions 40

Which of the following activities is a form of error-proofing?

Options:

A.

Housekeeping

B.

Fixture design

C.

Equipment calibration

D.

Double sampling

Buy Now
Questions 41

Quality planning is an activity that identifies the needs of which of the following stakeholders?

Options:

A.

Management

B.

Suppliers

C.

Employees

D.

Customers

Buy Now
Questions 42

Which of the following is the correct test statistic to use for a paired-sample t test?

CQE Question 42

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Buy Now
Questions 43

The following chart is being used to monitor a process. What do points X and Y. and region Z

represent on the chart?

CQE Question 43

Options:

A.

Special causes of variation

B.

Changes in raw materials

C.

Common causes of variation

D.

Statistically stable variation

Buy Now
Questions 44

The effectiveness of corrective action can best be assessed by

Options:

A.

assuring that the appropriate processing documentation is changed to reflect the action taken

B.

changing the data collection system to capture the results of the corrective action

C.

redefining the applicable inspection, test, or process control requirements

D.

measuring the results of the corrective action

Buy Now
Questions 45

The following data sets were presented to top management.

CQE Question 45

Which problem area should be targeted for improvement first?

Options:

A.

A

B.

B

C.

C

D.

D

Buy Now
Questions 46

An increase in the overall length of a recently qualified metal component has been observed and the quality engineer suspects that the storage temperature could be a factor that has affected the overall length. Which of the following tools could be used to assess this relationship?

Options:

A.

Affinity diagram

B.

Scatter diagram

C.

Histogram

D.

Cause and effect diagram

Buy Now
Questions 47

Short-run SPC should be used in which of the following situations?

Options:

A.

The coded data being used do not show significant shifts in the process.

B.

Regular SPC charts show the process to be out of control.

C.

Many different parts are made in small lots.

D.

The number of charts currently used needs to be increased to control the process better.

Buy Now
Questions 48

The table below shows the results of inspecting 3,752 items. On the basis of this information, a Pareto chart would show what cumulative percent of nonconformities by the end of the third operation?

Order of OperationNumber of Nonconforming ItemsPercent of Nonconforming ItemsPercent of Nonconformities

1-3729.9%55.0%

2nd1564.2%23.3%

3 rd782.1%11.7%

4*501.3%7.2%

5th200.5%2.8%

Calculator

Options:

A.

16.2%

B.

21.7%

C.

78.3%

D.

90.0%

Buy Now
Questions 49

The primary focus of design FMEA (DFMEA) is to

Options:

A.

identify personnel responsible for implementation

B.

predict failure frequencies

C.

minimize measurement variation

D.

mitigate failure modes

Buy Now
Questions 50

Working on ail design phases simultaneously is characteristic of

Options:

A.

design for six sigma

B.

design for reliability

C.

quality function deployment

D.

concurrent engineering

Buy Now
Questions 51

The relationship between factors can be displayed using which of the following tools?

Options:

A.

Control chart

B.

Matrix diagram

C.

Check sheet

D.

Process map

Buy Now
Questions 52

Which of the following tools is an example of a noncontact measurement tool?

Options:

A.

Laser scanner

B.

Hardness tester

C.

Micrometer

D.

Caliper

Buy Now
Exam Code: CQE
Exam Name: Certified Quality EngineerExam
Last Update: Nov 16, 2024
Questions: 175

PDF + Testing Engine

$56  $159.99

Testing Engine

$42  $119.99
buy now CQE testing engine

PDF (Q&A)

$35  $99.99
buy now CQE pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 21 Nov 2024