CDCS EXIN EPI Certified Data Centre Specialist Questions and Answers

Questions 4

A new network storage device in a non-standard size rack of approximately 600 kg/1,300 lbs is going to be installed in the data center.

Are new floor loading calculations required?

Options:

A.

No, as long as the equipment is less than 700 kg/1,500 lbs it will be within the limits.

B.

No, specifications of equipment brought into the data center will already be known during the design of the data center, and therefore the floor will be able to handle it.

C.

Yes, additional floor loading calculations need to be done by the floor manager, which should be verified by the safety engineer.

D.

Yes, a structural engineer, approved/endorsed by the building owner, should carry out new floor loading calculations.

Buy Now
Questions 5

Is it allowed to make design changes during the implementation phase?

Options:

A.

No, after a design freeze no further changes are allowed.

B.

Any change is fine as long as it is within the scope of the project.

C.

Yes, but only when time to implement is not exceeded.

D.

Only when there is a strong business and/or technical justification.

Buy Now
Questions 6

Which efficiency indicator accounts for all cooling costs (installation, operation, disposal)?

Options:

A.

HER

B.

COP

C.

PUE

D.

LCC

Buy Now
Questions 7

When shielding material reaches its saturation point, what will be the impact?

Options:

A.

The shielding material will reach its optimal shielding performance state.

B.

The shielding material will no longer be able to attenuate (reduce) additional EMF.

C.

The shielding material will increase its permeability factor.

D.

The shielding material will reach its maximum electrically charged state.

Buy Now
Questions 8

The building in which the computer room is housed is required to have a sprinkler system. The building is therefore equipped with a wet pipe system.

What action, if any, should you recommend for the computer room?

Options:

A.

Maintain the current wet pipe system.

B.

Replace the wet pipe system with a deluge system.

C.

Replace the wet pipe system with a dry pipe system.

D.

Replace the wet pipe system with a pre-action system.

Buy Now
Questions 9

When installing a raised floor, can we use a spirit level bar to level the floor?

Options:

A.

Yes, spirit level bars can be used as long as their length is longer than 60 cm/2 ft (the size of a typical raised floor tile).

B.

No, because using a spirit level bar, a measurement error will be transferred from pedestal to pedestal.

C.

Yes, but spirit level bars can only be used in the vertical plane.

D.

Yes, using a spirit level bar for raised floors higher than 40 cm is preferred.

Buy Now
Questions 10

The UPS of a data center, with an ANSI/TIA-942 Rating-4, is installed with the rectifier connected to power feed A and the bypass/reserve line input connected to power feed B.

To which feed will the output of the UPS be synchronized?

Options:

A.

The UPS will not synchronize to any of the feeds but use an internal clock to set the output voltage and frequency

B.

Depends on the setting of the UPS, as the UPS can normally be set to either feed

C.

Feed A

D.

Feed B

Buy Now
Questions 11

You need to determine the strategy for the cooling audit. All the servers are based on a front-to-rear (F-R) airflow design.

Which location for the temperature/humidity measurement should you recommend for the audit?

Options:

A.

At the back/rear of the server at 50 mm/2 inch

B.

At 1.5 meters/5 feet above the floor in the middle of the cold aisle

C.

At the front/intake of the server at 50 mm/2 inch

D.

At 1.5 meters/5 feet above the floor in the middle of the hot aisle

Buy Now
Questions 12

A data center scores Rated-3 in mechanical, Rated-4 in electrical, and Rated-2 in telecommunications. What is the overall rating?

Options:

A.

Rated-2

B.

Rated-4

C.

Rated-4 since electrical is most important

D.

Depends on architectural rating

Buy Now
Questions 13

You are working on the design of a new facility. The electrical riser of the building with high current power is located close to the area where sensitive IT equipment in the computer room will be located.

What should you recommend to reduce the amount of EMF coming from the electrical riser?

Options:

A.

Install single-phase power cabling

B.

Install three-phase power cabling based on three individual core wires

C.

Install bus bar trunking

D.

Install three-phase power cabling based on a combined cable (e.g. XLPE etc.)

Buy Now
Questions 14

A customer requires THDi from the UPS not to exceed 3% and wants high efficiency. The UPS has a 6-pulse SCR/thyristor rectifier and is loaded ~80%. Many ICT changes are expected in the next 3 years. What should you recommend?

Options:

A.

Nothing; the UPS will keep THDi at the right levels

B.

Install a passive harmonic filter on the UPS

C.

Install an active harmonic filter on the UPS

D.

Install an isolation transformer rated K13 or K20

Buy Now
Questions 15

What is a significant difference between a halocarbon gas-based fire suppression system and an inert gas-based fire suppression system?

Options:

A.

Inert gas has smaller-sized gas containers than halocarbon gas.

B.

Inert gas harms the environment and halocarbon gas does not.

C.

Halocarbon gas works on the basis of heat removal and inert gas works on the basis of oxygen reduction.

D.

Halocarbon gas works on the basis of oxygen reduction and inert gas works on the basis of heat removal.

Buy Now
Questions 16

An MCB needs to be installed in the PDU of an ICT rack. Which breaking curve should you select?

Options:

A.

D-Curve

B.

C-Curve

C.

B-Curve

D.

A-Curve

Buy Now
Questions 17

What is the main reason to install Earth Leakage protection?

Options:

A.

Protection of ICT equipment against high-frequency noise currents

B.

Protection of human lives

C.

Improvement of the data center grounding/earthing system

D.

Protection against lightning strikes

Buy Now
Questions 18

Which class of UPS is ideal for data centers?

Options:

A.

VFD (Voltage and Frequency Dependent)

B.

VI (Voltage Independent)

C.

VFI (Voltage and Frequency Independent)

D.

First class

Buy Now
Questions 19

What should be considered when installing overhead data cabling?

Options:

A.

To maintain minimum separation from power and ensure that the fire detection and suppression systems are not hindered.

B.

Copper data cabling should not be placed in metal cable trays.

C.

Optical fiber cabling should always be positioned on top of the copper cabling in the same cable tray to avoid damage to the sensitive optical fiber.

D.

All cabling should make sharp bends directly into the rack to avoid usage of additional space and blocking the airflow on top of the rack.

Buy Now
Questions 20

The air intake of the mission-critical server at the top of the rack is measuring 25 °C/77 °F.

Is this acceptable?

Options:

A.

Yes, this is allowed according to the standards and guidelines

B.

As long as it does not exceed the average server room temperature of 38 °C/100 °F

C.

Depends on the ANSI/TIA-942 Rating the data center needs to comply with

D.

No, the temperature needs to be 20 °C/68 °F

Buy Now
Questions 21

You are installing new copper cabling.

What is the advantage or disadvantage of choosing pre-terminated category 6 or 6A cabling?

Options:

A.

Pre-terminated cabling is already factory tested and saves installation time.

B.

There is no advantage as most new copper cabling network designs are based on category 3 or 5E for horizontal cabling.

C.

Pre-terminated cabling has a higher fire rating.

D.

Pre-terminated cabling makes ordering of the copper cables more complex, as you need to know in advance on which side the male or female connector needs to be located.

Buy Now
Questions 22

What is the first step in the design stage of the data center life cycle?

Options:

A.

Select vendors

B.

Do a design validation

C.

Define the scope of the project

D.

Freeze the design

Buy Now
Questions 23

What is the redundancy setup shown in the diagram?

Options:

A.

2+N+1

B.

N+2

C.

N+N+N

D.

2(N+1)

Buy Now
Questions 24

Do you need to consider blast protection when designing a data center?

Options:

A.

No, there is no reason for implementing blast protection as nobody can predict the impact of a bomb explosion.

B.

Yes, if the data center is a potential target or the building is located within the vicinity of (close by) a potential target.

C.

No, blast protection is not a requirement of ANSI/TIA-942.

D.

Yes, blast protection is a requirement of ANSI/TIA-942.

Buy Now
Questions 25

A data center is located in an area where the demand for power is higher than the utility power company is able to deliver. This results in frequent power outages and, therefore, power shedding (scheduled/controlled power shutdown for areas) is frequently applied. The mains power is more than 650 hours/year not available.

What type of generators should be installed?

Options:

A.

Standby generators should be installed in at least an N+1 configuration

B.

Continuous generators should be installed, at least in an N+1 configuration

C.

A combination of standby-, prime-, and continuous-generators, as the duration of the power outage is unpredictable. The total available capacity of the generators should be at least 500% of the data center load

D.

Continuous generators should be installed; no N+1 configuration is needed as the generators will run all the time

Buy Now
Questions 26

What is the main disadvantage of using a ToR (Top of Rack) design?

Options:

A.

A single ToR (Top of Rack) switch is more expensive than an EoR (End of Row) switch.

B.

You need a separate rack to install all your ToR (Top of Rack) switches.

C.

There will be more switches to manage.

D.

A ToR (Top of Rack) switch has only optical interfaces.

Buy Now
Questions 27

Two servers stacked with no gap (metal-to-metal). What heat transfer occurs?

Options:

A.

No heat transfer

B.

Conduction

C.

Radiation

D.

Convection

Buy Now
Questions 28

What indicates the overcurrent of a fuse or breaker?

Options:

A.

The maximum inrush current an overcurrent protection device can handle within a defined period of time

B.

The maximum electrical current which can flow in a particular electrical system under short-circuit conditions; it is determined by the voltage and impedance of the supply system

C.

The current at which the device will trip

D.

The current that a fuse or breaker is able to interrupt without being destroyed or causing an electrically damaging arc

Buy Now
Questions 29

What should be implemented when an Inergen-based fire suppression system is installed in the computer room?

Options:

A.

Drainage system under raised floor

B.

Gas tanks need to be within or close to the data center

C.

Pressure release valves in the data center

D.

Proper water leak detection system

Buy Now
Questions 30

Can you install a raised floor tight to the perimeter of the room?

Options:

A.

Yes, but only if the data center is located in Zone 0 with no or little seismic activity

B.

Yes, a raised floor needs to be installed tight to the perimeter to prevent air leakage

C.

No, to avoid damage to the raised floor due to building and hygrothermal movement

D.

No, but this applies only to raised floors with a height of over 90 cm (3 ft)

Buy Now
Questions 31

The humidity in the computer room has changed from about 50% down to 35% Relative Humidity (RH).

What influence does this have on Electrostatic Discharge (ESD)?

Options:

A.

No influence as long as the temperature is at approximately 20°C/77°F

B.

Relative humidity has no influence on ESD

C.

ESD levels will go up

D.

ESD levels will go down

Buy Now
Questions 32

What is forced entry resistance based on?

Options:

A.

Time, tools, and people

B.

Rate and installed number of CCTV cameras

C.

Building materials used and the location of the data center

D.

The number of security guards on duty

Buy Now
Questions 33

You are changing the design of the fire suppression system for your computer room from a halocarbon fire suppression system into an inert-based fire suppression system. Could you use the same formula to calculate the gas content for the gas?

Options:

A.

No, there is a significant difference in the formula for the different types of fire suppression gases.

B.

Yes, as long as you take the difference between the net and gross volume into account.

C.

Yes, as long as you use the same units of measure, i.e., kg/m³ or lbs/ft³.

D.

Yes, as long as you change the 'S' factor of the formula to reflect the gas type used.

Buy Now
Questions 34

What is needed to determine the Relative Humidity (RH)?

Options:

A.

Wet bulb temperature, local atmospheric pressure, and calculator

B.

Dry bulb temperature, airflow, and conversion table

C.

Cold surface with dew collection counter

D.

Dry bulb temperature, wet bulb temperature, and psychrometric chart

Buy Now
Questions 35

An air-conditioner unit needs to be selected. Two types are available:

Unit-A has a Sensible Heat Ratio (SHR) of 0.7.

Unit-B has a Sensible Heat Ratio (SHR) of 0.9.

From an efficiency point of view, which one should be selected?

Options:

A.

It does not matter, as the Sensible Heat Ratio has nothing to do with efficiency.

B.

Not relevant, as Sensible Heat Ratio is only specified for air-conditioner equipment to indicate the ratio between intake temperature and exhaust temperature.

C.

Unit A

D.

Unit B

Buy Now
Questions 36

You are working with a customer who requires a guarantee that THDi levels coming from the UPS should not exceed more than 3% THDi. Furthermore, he wants to run a power-efficient data center. The UPS has a 6-Pulse SCR/Thyristor based rectifier. The current load on the UPS is approximately 80%. The customer indicates they are not expecting any changes on the ICT infrastructure for the next 3 years.

What should you recommend?

Options:

A.

Nothing, the UPS will be able to take care of the right levels of THDi

B.

Install a passive harmonic filter on the UPS

C.

Install an active harmonic filter on the UPS

D.

Install an isolation transformer rated at K13 or K20

Buy Now
Exam Code: CDCS
Exam Name: EXIN EPI Certified Data Centre Specialist
Last Update: Oct 23, 2025
Questions: 120

PDF + Testing Engine

$49.5  $164.99

Testing Engine

$37.5  $124.99
buy now CDCS testing engine

PDF (Q&A)

$31.5  $104.99
buy now CDCS pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 23 Oct 2025