New Year Special Sale - 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dm70dm

CDCP Certified Data Centre Professional (CDCP) Questions and Answers

Questions 4

What is the best practice for cutting holes in the raised floor tile?

Options:

A.

Anywhere as data centre tiles are designed to allow cut-outs anywhere.

B.

Draw a cross on the tile and when making a cut-out do not touch a line and avoid the corners.

C.

Draw a line in the middle of the tile and never touch the line when making the cut.

D.

Cut the tiles at the corner so the pedestals can be used as a vertical cable manager.

Buy Now
Questions 5

Can Electro Magnetic Fields (EMF) cause data centre failures?

Options:

A.

Yes, high levels of EMF can cause data centre failures.

B.

No, only power issues will cause data centre failures.

C.

No, only cooling issues will cause data centre failures.

D.

Yes, but only EMF caused by lightning strikes.

Buy Now
Questions 6

Which type of Fire Detection Device is recommended for protecting a Data Center?

Options:

A.

Heat detector

B.

Smoke detector

C.

Flame detector

D.

None of the above

Buy Now
Questions 7

The expected time to Recover/Repair from a system from a failure is defined as.

Options:

A.

MTBF

B.

MCBF

C.

MLBF

D.

MTTR

Buy Now
Questions 8

IP protection grades consist of two numbers.

Which levels of protection do they describe and what is the best protection?

Options:

A.

First digit; protections against the ingress of solid objects. Second digit; protection against ingress of water/fluids. The lower the number the better the level of protection.

B.

First digit; protections against the ingress of solid objects. Second digit; protection against ingress of water/fluids. The higher the number the better the level of protection.

C.

First digit; protections against the ingress of water/fluids. Second digit; protection against ingress of solid objects. The higher the number the better the level of protection.

D.

First digit; protections against the ingress of water/fluids. Second digit; protection against ingress of solid objects. The lower the number the better the level of protection.

Buy Now
Questions 9

Which one of the following is an Objective of Data Center Fire Protection?

Options:

A.

Information

B.

Representation

C.

Depression

D.

Suppression

Buy Now
Questions 10

What needs to be installed in the battery room when using Lithium-ion batteries?

Options:

A.

A battery management system to monitor and prevent unsafe temperatures during charging/discharging.

B.

High capacity air-conditioning equipment since Lithium-ion batteries are sensitive to high temperatures, which can reduce their lifetime.

C.

A proper ventilation system since Lithium-ion batteries produce highly flammable Hydrogen gas during charging.

D.

A proper supply of distilled water.

Buy Now
Questions 11

What is the main risk for a data centre when the water supply fails?

Options:

A.

Failure to the water supply could result in IT failure and/or denial of access to operate.

B.

Failure to the water supply could result in DX cooling systems to fail.

C.

Failure to the water supply could cause issues for the cooling of back-up generators.

D.

Failure to the water supply could result in sudden changes of the relative humidity in the Computer room.

Buy Now
Questions 12

An optical fiber cable comes with the specifications 50/125 um.

What do the numbers represent?

Options:

A.

The first number represents the distance for a 10 Gb/s connection; the second number represents the distance for a 1 Gb/s connection.

B.

The first number represents the diameter of the core; the second number represents the diameter of the cladding in microns.

C.

The first number represents the diameter of the core; the second number represents the actual diameter cable including the buffer and jacket.

D.

The first number represents the required distance to single-phase power cabling; the second number represents the required distance to three-phase cabling.

Buy Now
Questions 13

Which one of the following is an Audible Signaling and Notification Device?

Options:

A.

Sirens

B.

Strobes

C.

Alarms

D.

Clocks

Buy Now
Questions 14

Which one of the following is an example of Indirect Cost?

Options:

A.

Legal fees

B.

Damaged brand perception

C.

System recovery

D.

Cost revenues

Buy Now
Questions 15

Which one of the following is an AC Power Quality Anomaly?

Options:

A.

Signal Distortion

B.

Waveform Distortion

C.

Backup Condition

D.

Attenuation

Buy Now
Questions 16

What is the main difference between an Environmental Monitoring System (EMS) and a Building Management System (BMS)?

Options:

A.

An EMS provides local alarms. A BMS provides both local and remote alarms.

B.

A BMS is only able to monitor dry contacts (on/off). An EMS can also monitor analog values.

C.

A BMS only operates as a stand-alone system. An EMS can be configured as a redundant system.

D.

An EMS monitors only. A BMS monitors and controls.

Buy Now
Questions 17

Which design consideration should be implemented with an Inergen-based fire suppression system?

Options:

A.

Install protective covers around the nozzles to avoid accidental gas dumps.

B.

Install the gas containers (tanks) close to the data centre.

C.

To use Inergen only for fires which are not related to electrical power.

D.

Pressure relief valves are required in the room that needs protection.

Buy Now
Questions 18

The UPS vendor is offering the latest model of their UPS to you. The vendor indicates that the UPS is categorized as VFD class.

Is this UPS a fit for your mission-critical data centre?

Options:

A.

Yes

B.

No

C.

Yes, but only if you oversize the battery bank with 10%.

D.

Yes, but only if they install it with a 12-pulse rectifier.

Buy Now
Questions 19

Cost of Downtime can be classified as.

Options:

A.

Direct and Indirect

B.

Up and Down

C.

Mean and Median

D.

Classified and Declassified

Buy Now
Questions 20

What should be considered when implementing hot- or cold-aisle containment in an existing computer room?

Options:

A.

Equipment will get too hot at the rear (back) of the rack potentially resulting in more ICT hardware failures.

B.

The delta-T of the equipment will increase too much causing reliability issues.

C.

It creates potential issues with the existing fire suppression system(s).

D.

It will be more difficult to install power and network cabling in the contained area.

Buy Now
Questions 21

Mean time between failures is best considered a measure of:

Options:

A.

Size

B.

Cost

C.

Duration

D.

Reliability

Buy Now
Exam Code: CDCP
Exam Name: Certified Data Centre Professional (CDCP)
Last Update: Dec 19, 2024
Questions: 73

PDF + Testing Engine

$49.5  $164.99

Testing Engine

$37.5  $124.99
buy now CDCP testing engine

PDF (Q&A)

$31.5  $104.99
buy now CDCP pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 22 Dec 2024