Questions 4

When using a change-driven approach, the business analyst may create an initial list of high-level requirements for the initiative. This high-level requirements list is also known as what term?

Options:

A.

Requirements envisioning

B.

Project scope

C.

Product scope

D.

Requirements foundation

Buy Now
Questions 5

As a business analyst, you'll often need to analyze business needs, requirements, and solutions for assumptions and constraints. Which one of the following is a constraint? Choose the best answer.

Options:

A.

The solution must cost less than $450,000.

B.

The solution should be implemented during the summer months.

C.

The solution must be done by December 31.

D.

The solution won't need external resources.

Buy Now
Questions 6

All of the following are examples of elicitation techniques that are used as part of the business analyst elicitation task except for which one?

Options:

A.

Brainstorming

B.

Observation

C.

Decomposition

D.

Prototyping

Buy Now
Questions 7

Beth is a business analyst for her organization and she's discussing the solution with her key stakeholders. Beth is considering that moving to a new operating system, new office software, and new customized applications will be too much for the end users to learn and to manage their ongoing responsibilities. What task is Beth completing in this scenario?

Options:

A.

Manage the stakeholders.

B.

Evaluate solution performance.

C.

Define transition requirements.

D.

Assess organizational readiness.

Buy Now
Questions 8

Which approach to business analysis activities deals with rapid delivery of the business value?

Options:

A.

Quality-driven

B.

Change-driven

C.

Plan-driven

D.

Stakeholder-driven

Buy Now
Questions 9

Which of the following describes the organizational policies, procedures, forms, and methodologies the business analyst is to follow?

Options:

A.

Organizational process asset

B.

Enterprise architecture

C.

Business need

D.

Matrix structure

Buy Now
Questions 10

You work as a business analyst for u Certify Inc. You have been assigned the task to implement the job

shadowing process. Which of the following statements are true regarding the job shadowing process? Each correct answer represents a complete solution.

Options:

A.

The job shadowing process is a part of business analysis planning and monitoring activities.

B.

In this process, the observer is required to keep an eye on those workers whose work routine is down and who are unable to explain their work.

C.

In this process, the observer has to understand their work process for better assessment of the modifications of the work required.

D.

Job shadowing is an elicitation process that is a part of job observation.

Buy Now
Questions 11

In order to plan the business analysis approach, the business analyst must understand the organizational process needs and what other thing?

Options:

A.

Objectives that apply to the initiative

B.

Stakeholders' threats and perceived threats

C.

Consideration of risk and reward

D.

Purpose of the proposed solution

Buy Now
Questions 12

You are a business analyst in an organization that has recently embraced business analysis as part of its initiative for new projects. In this organization, there is not an organizational standard for tailoring business analysis duties and expectations. Which one of the following best describes the action you should take to begin business analysis?

Options:

A.

Work with the appropriate stakeholders to determine how the business analysis work should be completed.

B.

Define the organizational standard first.

C.

Create a business case for the need of organizational standards for business analysis.

D.

Take charge and begin the business analysis activities, but document your approach to serve as a template for future business analysis initiatives.

Buy Now
Questions 13

You are creating the solution scope for an identified problem in your organization. You are working with several stakeholders during this process including the domain subject matter expert, the implementation subject matter expert, the project manager, and the sponsor. Which of these stakeholders will be responsible for writing the project scope?

Options:

A.

Business analyst

B.

Project manager

C.

Domain subject matter expert

D.

Sponsor

Buy Now
Questions 14

In order to assess the capability gaps of an organization, you'll need all of the following inputs except for which

one?

Options:

A.

Solution performance assessment

B.

Enterprise architecture

C.

Solution scope

D.

Business need

Buy Now
Questions 15

As a business analyst, you'll need to recognize the methods that are appropriate for recording and documenting the results of elicitation activities. Which one of the following cannot be considered as a valid method for documenting elicitation?

Options:

A.

Whiteboards

B.

Audio recordings

C.

Voice mails

D.

Written documentation describing the outcome of the event

Buy Now
Questions 16

You are the business analyst for your organization. You're creating a document that states the business need, identifies the key stakeholders, and defines the positive impact the solution will bring to the organization and stakeholders. What document are you creating?

Options:

A.

Requirements documentation

B.

Business case

C.

Project charter

D.

Vision statement

Buy Now
Questions 17

You are a business analyst in an organization that has recently embraced business analysis as part of its initiative for new projects. In this organization, there is not an organizational standard for tailoring business analysis duties and expectations. Which one of the following best describes the action that you should take to begin business analysis?

Options:

A.

Take charge and begin the business analysis activities, but document your approach to serve as a template for future business analysis initiatives.

B.

Create a business case for the need for organizational standards for business analysis.

C.

Define the organizational standard first.

D.

Work with the appropriate stakeholders to determine how the business analysis work should be completed.

Buy Now
Questions 18

You are the business analyst for your organization and working with the stakeholders to prioritize the requirements. The stakeholders are concerned about the financial impact of the requirements should some of them fail during the implementation. You would like to rank the risk tolerance of the stakeholders based on their comments about the solution and the requirements. The following are the three categories of risk tolerance associated with the stakeholders except for which one?

Options:

A.

Neutrality

B.

Mitigation

C.

Risk-seeking

D.

Risk-aversion

Buy Now
Questions 19

Enterprise analysis provides many things for an organization. All of the following are tasks included in enterprise analysis except for which one?

Options:

A.

Assess capability gaps

B.

Determine solution approach

C.

Define business need

D.

Solution performance assessment

Buy Now
Questions 20

What elicitation technique is best described as a study to compare the strengths and weaknesses of an organization against its peers and competitors?

Options:

A.

Brainstorming

B.

Market analysis

C.

Comparative analysis

D.

Benchmarking

Buy Now
Questions 21

When a business analyst prepares for elicitation, he must define the scope of the selected elicitation

technique, notify the stakeholders of the elicitation plan and technique to be used, and what other preparation activity?

Options:

A.

Schedule all needed resources.

B.

Create an elicitation plan.

C.

Define the solution.

D.

Perform stakeholder analysis.

Buy Now
Questions 22

A business analyst (BA) is working on a project for a media company. The BA has verified, validated, and prioritized the requirements based on business benefits. During the development phase, the team discovered that the current viewer will no longer be supported by the provider. The technical team needs to either upgrade to the newer version with different technology or find an alternate viewer. Given this new information, what is the next step for the BA?

Options:

A.

Assess the impacts and re-prioritize the requirements based on technical constraints

B.

Continue the project as it is currently important to focus on customer satisfaction

C.

Convince stakeholders that the business benefits are unachievable due to technical constraints

D.

Communicate the technical constraints to customers

Buy Now
Questions 23

Two stakeholders are arguing over which model to use for describing requirements. One insists that using an activity diagram is superior while the other prefers a state diagram. How should the business analyst (BA) resolve the conflict?

Options:

A.

Explain that the models are complementation to each other

B.

Allow both stakeholders to work on the models independently

C.

Introduce a third model type so that neither stakeholder prevails

D.

Suggest a fusion model that integrates activity and state diagrams

Buy Now
Questions 24

Barry is a project stakeholder that is excited about the deliverable your project wants to create for the organization. He's helpful, provides information, and offers support whenever your project needs it. How would you classify Barry based on this information?

Options:

A.

Positive stakeholder

B.

Cheerleader

C.

Project sponsor

D.

Project team member

Buy Now
Questions 25

You are a Business Analyst for your organization, and you're preparing to elicit requirements from stakeholders. You've gathered several inputs to help with the elicitation process. Which input will you use to ensure that you understand the type of information that should be elicited from stakeholders?

Options:

A.

Roles and Responsibilities

B.

Stakeholder List

C.

Business Need

D.

Risk Assessment

Buy Now
Questions 26

When an organization implements a new solution, the organization will often have to provide dual-support for the new solution and the solution that's being replaced. Which one of the following is not an input to the transitional requirements definition?

Options:

A.

Stakeholder management strategy

B.

Deployed solution

C.

Stated requirement

D.

Organizational readiness assessment

Buy Now
Questions 27

When a business analyst performs requirements tracing, he may need to trace the requirements backward through their lineage and may need to trace the requirements forward through their relationship to other requirements. What is the forward tracing activity called in requirements traceability?

Options:

A.

Lineage tracking

B.

Backwards pass

C.

Derivation

D.

Allocation

Buy Now
Questions 28

You are the business analyst for your organization and are leading a presentation about an identified problem. This presentation will help the stakeholders to understand the problem and it will help you when you begin to elicit requirements from the stakeholders. Which type of learner learns best through the presentation of models?

Options:

A.

Kinesthetic learners

B.

Auditory learners

C.

Communication model learners

D.

Visual learners

Buy Now
Questions 29

A business analyst has just completed an elicitation event. What stakeholder(s) is/are involved in the documentation of the elicitation results?

Options:

A.

Business analyst and key stakeholders

B.

Business analyst

C.

Project manager, project team, and business analyst

D.

Project manager, business analyst, and project sponsor

Buy Now
Questions 30

You are the business analyst for your organization and you are completing the manage requirements traceability process. You are tracking the requirements to determine how the requirements are interrelated with one another and with the actual delivery of the project scope.

There are actually three reasons why the business analyst should trace requirements. Which one of the following is not one of the three reasons why trace requirements are useful?

Options:

A.

Requirements allocation

B.

Requirements coverage

C.

Quality control

D.

Impact analysis

Buy Now
Questions 31

John and Hanna are business analysts in their organization and they are completing the verification activities to check for completeness of the requirements. When should John and Hanna perform these verification activities?

Options:

A.

At each milestone of the requirements analysis process

B.

Once all of the requirements have been gathered

C.

Iteratively throughout the requirements analysis process

D.

As often as the requirements management plan calls for

Buy Now
Questions 32

When a business analyst performs requirements tracing, he may need to trace the requirements backward through their lineage and may need to trace the requirements forward through their relationship to other requirements. What is the backwards tracing activity called in requirements traceability?

Options:

A.

Allocation

B.

Lineage tracking

C.

Derivation

D.

Backwards pass

Buy Now
Questions 33

You are a business analyst for your organization. Your current business analysis endeavor includes working with stakeholders located in offices around the world. Because these stakeholders are dispersed, what is likely to increase in this endeavor as opposed to a collocated group of stakeholders?

Options:

A.

Costs

B.

Face-to-face meetings

C.

Communication needs

D.

Risks

Buy Now
Questions 34

Enterprise analysis creates just five outputs. Which one of the following is an output of the enterprise analysis tasks?

Options:

A.

Stakeholder concerns

B.

Solution approach

C.

Solution performance assessment

D.

Assumptions and constraints

Buy Now
Questions 35

All of the following are inputs to the task assess organizational readiness except for which one?

Options:

A.

Enterprise architecture

B.

Solution Scope

C.

Stakeholder concern

D.

Risk register

Buy Now
Questions 36

You work as a project manager for SoftTech Inc. You are working with the project stakeholders to begin the qualitative risk analysis process. You will need all of the following as inputs to the qualitative risk analysis process except for which one?

Options:

A.

Risk management plan

B.

Stakeholder register

C.

Project scope statement

D.

Risk register

Buy Now
Questions 37

If an organization wants to re-use requirements, where should the defined requirements be kept?

Options:

A.

Requirements management plan

B.

Requirements repository

C.

Solution scope

D.

Project management plan

Buy Now
Questions 38

What does MoSCoW mean when it comes to requirements prioritization?

Options:

A.

Must, Should, Could, Would

B.

Money, Schedule, Control, Waiting

C.

Must, Should, Could, Won't

D.

Mustn't, Shouldn't, Couldn't, Won't

Buy Now
Questions 39

Complete this sentence. If a requirement cannot be verified, it cannot be successfully.

Options:

A.

Scheduled

B.

Estimated

C.

Assigned

D.

Implemented

Buy Now
Questions 40

Henry is meeting with Janet, the business analyst of the organization. They are discussing an opportunity to create a new service their company can provide, though the startup of the service would take time and an investment. Henry wants Janet to explore the possibility of this new venture. What activity is Henry asking Janet to complete?

Options:

A.

Brainstorm the business need.

B.

Create a data diagram for the service.

C.

Define the business need.

D.

Elicit the requirements of the proposal.

Buy Now
Questions 41

Which basis for prioritization allows the project team to work initially with lower-risk requirements first?

Options:

A.

Quantitative ranking

B.

Positive risk ranking

C.

Relationship to other requirements

D.

Implementation difficulty

Buy Now
Questions 42

One of the techniques to assess capabilities in an organization is to use SWOT. What does SWOT accomplish?

Options:

A.

SWOT reviews your strengths, weaknesses, opportunities, and threats.

B.

It identifies how current capabilities match up against the influencing factors.

C.

It assesses the strength, weaknesses, opportunities, and threats.

D.

SWOT is a goal setting technique that means "Sweat Works Over Time."

Buy Now
Questions 43

An organization has two different solutions to grow its business. One project is worth $375,000 to the organization. The second project is worth $565,000 to the business. The organization can only do one of the projects and elects to do the second project for $565,000. What is the opportunity cost of this decision?

Options:

A.

$190,000

B.

$565,000

C.

$375,000

D.

$940,000

Buy Now
Questions 44

The task of prioritizing requirements creates just one output. What is it?

Options:

A.

Validated requirements

B.

Requirements (prioritized)

C.

Requirements rankings

D.

Requirements assessment

Buy Now
Questions 45

By which of the following is the performance of all requirements management and communication activities governed?

Options:

A.

Business analysis plans

B.

Business analyst

C.

Project manager

D.

Project sponsor

Buy Now
Questions 46

Holly's organization uses a plan-driven approach to business analysis. When it comes to communication in Holly's organization what type of communication will likely be required?

Options:

A.

Face-to-face

B.

Ad hoc

C.

Chain of command

D.

Formal

Buy Now
Questions 47

The process of defining the business need uses one output. What is it?

Options:

A.

Feasibility study

B.

Solution scope

C.

Business need

D.

Capability gaps

Buy Now
Questions 48

You are the business analyst for your organization and you are working with Bill on creating a model. Bill is a little confused about all the different things a model can do for the stakeholders. You explain to Bill that a model can do all of the following except for which one?

Options:

A.

Define the risk and reward for the requirements

B.

Categorize and create hierarchies of items

C.

Define boundaries for business domains

D.

Show business logic

Buy Now
Questions 49

According to the book 'A Guide to the Business Analysis Body of Knowledge', effective business analysis practices can do what to the amount of change to requirements in a stable business environment?

Options:

A.

Reduce the amount of change, but not eliminate entirely.

B.

Document the changes to requirements.

C.

Control the frequency of the change.

D.

Eliminate the change entirely.

Buy Now
Questions 50

As a business analyst, you must identify activities in your business analysis approach. Which one of the following is useful for identifying activities?

Options:

A.

Project management input

B.

BABOK

C.

A list of deliverables

D.

WBS

Buy Now
Questions 51

A business analyst (BA) is managing stakeholder collaboration to ensure positive reactions are capitalized upon. There is uncertainty as to whether the correct stakeholders have been identified. Which technique can be used to correct this situation?

Options:

A.

Functional decomposition

B.

Lessons learned

C.

Risk analysis

D.

Interviews

Buy Now
Questions 52

A business owner has identified a high priority requirement that needs to be implemented immediately. The project manager has asked the business analyst (BA) to perform an impact analysis of this change. Which factor will the BA need to consider?

Options:

A.

Number of systems being affected by the requirement

B.

Original source of the requirement

C.

Method of requirement communication

D.

Selection of the elicitation for the requirement

Buy Now
Questions 53

A software development company has a strict policy of evaluating solutions against the number of defects reported in the testing phase. This practice helps the company stay competitive and deliver better solutions. What performance measure is being practiced?

Options:

A.

Predictive

B.

Quantitative

C.

Adaptive

D.

Qualitative

Buy Now
Questions 54

The emergence of self-driving vehicles has disrupted the auto insurance industry. The Chief Information Officer (CIO) has asked the business analyst (BA) to modify the existing business model to include self-driving vehicles. Which of the following will be valuable information for the BA to use?

Options:

A.

Vision and mission statement

B.

Project charter

C.

Business architecture framework

D.

Organizational structure

Buy Now
Questions 55

You are the business analyst for your organization and you're creating a business analysis communication management plan. In your plan, you want to address the different locales and culture and the communication needs that may affect the business analysis approach. Which one of the following elements should not be included in the cultural analysis of the plan?

Options:

A.

Relationship to task completion

B.

Relationship to authority

C.

Relationship to religion

D.

Relationship to time

Buy Now
Questions 56

You are the business analyst for your organization and you're training Marcy, a new business analyst, on how requirements are formed. Which one of the following best describes how requirements are formed?

Options:

A.

Stakeholders' needs, wants, and expectations

B.

Solutions-based approach

C.

Change-driven approach

D.

Risk and reward solution

Buy Now
Questions 57

Linda works as a project manager for an IT project. She is getting new developers for completing her project. Which of the following processes is she involved in?

Options:

A.

Manage Project Team

B.

Develop Project Team

C.

Acquire Project Team

D.

Human Resource Planning

Buy Now
Questions 58

Which one of the following statements best describes the purpose of allocating requirements?

Options:

A.

Optimize efficiency and link to productivity.

B.

Limit the risk exposure.

C.

Maximize the business value.

D.

Increase productivity through efficiency.

Buy Now
Questions 59

In order to plan business analysis activities, you will need four inputs. Which one of the following inputs is not valid for this task?

Options:

A.

Business analysis approach

B.

Stakeholder tolerance for risk

C.

Stakeholder list, roles, and responsibilities

D.

Business analysis performance assessment

Buy Now
Questions 60

Which approach is used to focus on minimizing up-front uncertainty?

Options:

A.

Class-driven approach

B.

Change driven approach

C.

Solution-driven approach

D.

Plan-driven approach

Buy Now
Questions 61

All of the following statements are true regarding a brainstorming session during requirements elicitation except for which one?

Options:

A.

All ideas should be visibly recorded.

B.

The number of ideas should not be limited.

C.

The ideas should be generated with a cost or time estimate.

D.

All ideas should be shared without any discussion, criticism, or evaluation.

Buy Now
Questions 62

What tool is best described as a spreadsheet to use when there's a relatively low amount of requirements that need to be traced?

Options:

A.

Roles and responsibilities chart

B.

Quantitative matrix

C.

Coverage matrix

D.

RACI Chart

Buy Now
Questions 63

A business analyst in her organization has identified all of the terminology of the solution, the acronyms the organization will use, and the nomenclature of her department where the endeavor will take place. Where should all of this information actually be stored?

Options:

A.

WBS

B.

Business analysis register

C.

Terminology register

D.

Data dictionary

Buy Now
Questions 64

Which of the following defines all of the required work to satisfy the requirements of the project?

Options:

A.

Project scope

B.

Requirements envisioning

C.

Requirements foundation

D.

Product scope

Buy Now
Questions 65

You are the business analyst for your organization and you're using a plan-driven approach to business analysis processes. In this environment, what types of communications are most likely required to be used in regard to requirements?

Options:

A.

Informal

B.

Ad hoc

C.

Face-to-face

D.

Formal

Buy Now
Questions 66

If you're a business analyst and using an event-based elicitation task, such as a requirements workshop, what can be considered as essential to establish with the participants?

Options:

A.

Cost management

B.

Deadlines

C.

Ground rules

D.

Purpose of the workshop

Buy Now
Questions 67

A project to implement shared registration procedures across multiple jurisdictions has stalled several times. The new business analyst (BA) assigned to the project used a collaborative game to elicit requirements. What effect was the BA attempting to achieve?

Options:

A.

Minimal variance from planned effort

B.

Close alignment with corporate values

C.

Stimulate teamwork in a fun situation

D.

High confidence in conclusions

Buy Now
Questions 68

Ralph is a business analyst for his organization and he's using the plan-driven approach for business analysis. Ralph has captured the requirements of the project, but what must happen before he can begin capturing and defining the requirements at a deeper level of detail?

Options:

A.

The initial requirements must be tested for time, cost, quality, and risk.

B.

The initial requirements must undergo a feasibility study.

C.

The initial requirements must be formally approved by the stakeholders.

D.

The initial requirements must pass through the Delphi Technique.

Buy Now
Questions 69

A business analyst has identified four different solutions for a business need. In the light of solution assessment, how many solution assessment iterations should he do?

Options:

A.

The business analyst can do multiple assessments, one for each solution or to compare multiple solutions.

B.

There is no limit, but the business analyst should perform the same type of assessments for each solution to be balanced.

C.

The business analyst can do one assessment per solution.

D.

There should only be one solution assessment - four is too many. Some of the solutions are better than others.

Buy Now
Questions 70

You are the business analyst in your organization and you're working to organize the requirements for the business units in your company. Which technique is best suited for structuring requirements around the needs of each stakeholder group?

Options:

A.

Organizational modeling

B.

User stories

C.

Data modeling

D.

Functional decomposition

Buy Now
Questions 71

You are the business analyst for your organization and are working on organizing the identified requirements for a new solution. Nancy, your assistant in this process, says that these requirements aren't very complex. You agree but add that it's this thing that makes the overall solution complex. What thing adds to the level of complexity among requirements?

Options:

A.

Relationships among the requirements

B.

Management in the project

C.

Cost and schedule constraints

D.

Stakeholders in the project

Buy Now
Questions 72

You are the business analyst for your organization and you've been working with several stakeholders to

gather requirements for approval.

The requirements have been approved with the exception of a conflict on one requirement. What must you and the stakeholders do in regard to this conflict before the business analysis endeavor may continue?

Options:

A.

The requirement with the conflict should be excluded from the approved set of requirements and must be resolved before it can be joined to the approved set of requirements.

B.

The conflict must be documented as a risk.

C.

The conflict must be resolved before the set of requirements may be approved.

D.

The conflict must be documented in an issues log, assigned to an issue owner, and then the endeavor may continue.

Buy Now
Questions 73

You are the business analyst for your organization and your manager has asked you to prepare an analysis of each proposed solution. Your manager wants you to determine whether and how eachoption can provide an expected business benefit to meet the stated business need. What is your manager asking you to create?

Options:

A.

Feasibility study

B.

Abbreviated study

C.

Alternative identification analysis

D.

Quantified analysis

Buy Now
Questions 74

Robert is the business analyst for his organization and is preparing to host a workshop for twenty stakeholders. The goal of this workshop is to comprehensively identify the requirements for newsoftware that will be created for Robert's organization. What must first be established in the workshop to ensure that the elicitation process moves smoothly?

Options:

A.

An understanding of the ground rules of the workshop

B.

An understanding of who are the most important stakeholders

C.

An understanding of the business opportunity

D.

An understanding of the requirements elicitation processes

Buy Now
Questions 75

You have been assigned as the Project Manager for a new project that involves the development of a new interface for your existing time management system. You would like to plan the communications that need to be made during the project lifecycle. Which of the following would be a critical tool/technique to help in your communications planning?

Options:

A.

RAM Chart

B.

Affinity Diagram

C.

Stakeholder Analysis

D.

Text-Oriented Chart

Buy Now
Questions 76

A stakeholder would like to add requirements to an IT project which is in flight. The project manager wants to revisit the traceability repository prior to committing to the addition of any new requests, because it is used for which of the following activities?

Options:

A.

Creating test plans and test cases

B.

Approving requirement relationships

C.

Developing documentation for technical support

D.

Supporting change and scope management

Buy Now
Questions 77

A business analyst (BA) was asked by the vice president (VP) to evaluate the organization's claims processing capability and recommend improvements. The VP agreed to the BA's recommended solution approach and identified an external vendor to develop the modernized claims processing system. Before contracting with the external vendor, the BA realized that the budget should be approved by the Chief Financial Officer. What was missed by the BA when performing stakeholder analysis?

Options:

A.

Attitude

B.

Roles

C.

Decision making authority

D.

Level of influence

Buy Now
Questions 78

A business analyst (BA) is structuring requirements to ensure they are cohesive and tell the full story. Which of the following requirements is consistent with a stakeholder's need: “As a Product Manager, I want to review my general insurance sales performance so I track my sales performance against my annual target”?

Options:

A.

“Provide weekly new bank account sales reports on a shared drive.”

B.

“Increase customer retention across the life insurance division”

C.

“Segment insurance sales data between life and general”

D.

“Migrate the insurance web portal to a cloud platform."

Buy Now
Questions 79

A business analyst (BA) is supporting an organization in its product launch. The BA wants to identify assumptions about the benefits resulting from the new product. What does identifying assumptions help the BA manage?

Options:

A.

Priorities

B.

Metrics

C.

Requirements

D.

Risks

Buy Now
Questions 80

A business analyst (BA) is working on a project that follows incremental and iterative approaches. The BA and the stakeholders have shortlisted several user stories to be considered in the project scope. Which of the following methods would enable them to arrive at a common understanding on delivering value in the product and ranking the stories?

Options:

A.

Story decomposition

B.

State modelling

C.

Value stream mapping

D.

MoSCoW prioritization

Buy Now
Questions 81

A project aiming at improving an organization's Net Promoter Score is nearing completion. The business analyst (BA) and stakeholders are evaluating ways to measure the performance of the solution. Which technique may be employed?

Options:

A.

Vendor assessment

B.

Market analysis

C.

Focus groups

D.

Business case

Buy Now
Questions 82

A business analyst (BA) has identified the impacts and resolution for a proposed change. Based on the Responsible, Accountable, Consulted, informed (RACI) matrix, who must approve the change before it is implemented?

Options:

A.

Subject matter expert

B.

Business sponsor

C.

Project manager

D.

System architect

Buy Now
Questions 83

A business analyst (BA) is creating a business process model (BPM) showing how the organization will handle errors reported on its website. The BA held a workshop with stakeholders about how the process might work. The BA was also given an instruction manual about a similar error-handling situation, but was advised that some minor aspects are not applicable to the new process. How can the BA use the manual?

Options:

A.

Ignore the manual's information when creating the BPM since it is about a different situation

B.

Identify the discrepancies in process between the manual and the workshop results and resolve these with stakeholders

C.

Create a new version of the manual based on the original

D.

Rely on the manual to create the BPM and ignore the interview results because no single stakeholder has the whole picture of the process

Buy Now
Questions 84

An organization's Business Analysis Center of Excellence (BACoE) has deployed several business analysts (BAs) to provide business analysis to a cross-functional initiative. After the first phase of the project, the BACoE seeks to determine the effectiveness of the business analysis work. Which of the following techniques could be used to elicit feedback from all affected stakeholders?

Options:

A.

Brainstorming

B.

Business cases

C.

Surveys

D.

Root cause analysis

Buy Now
Questions 85

A global organization is implementing a new Knowledge Management System and communication to the different regions has been informal. The approach is to convert the few remaining regions iteratively. The team has experienced variances at this point but feels confident in these final conversions. How should the business analyst (BA) communicate the information?

Options:

A.

Repository

B.

Document management

C.

Email

D.

Individual collaboration

Buy Now
Questions 86

A business analyst (BA) creates several use case scenarios to specify the requirements for a system. When the beta version of the system is released, there are problems because several important pieces of information are missing. What should the BA have done to avoid this situation?

Options:

A.

Performed decision analysis

B.

Identified assumptions

C.

Prepared activity diagrams

D.

Analyzed completeness

Buy Now
Questions 87

Verification of requirements on the projects have highlighted an issue regarding misunderstanding of design models among key stakeholders. A major reason cited for the misunderstanding was the technical jargon and models used in the documentation. What must the business analyst (BA) do to improve the understanding?

Options:

A.

Ensure completeness within the models used

B.

Verify that elements within the models are used consistently

C.

Represent design models using common terminology

D.

Check for compliance with organization standards

Buy Now
Questions 88

A business analyst (BA) is tasked with developing requirements that can be implemented by the development team iteratively. Which characteristic should the requirements exhibit?

Options:

A.

Substantial

B.

Granular

C.

Prioritized

D.

Unambiguous

Buy Now
Questions 89

A business analyst (BA) is working on a project involving the purchase of a commercial off-the-shelf (COTS) product. All internal risks have been identified and assessed. What is the BA's next course of action?

Options:

A.

Review the business objectives

B.

Consult the business case

C.

Assess external risks

D.

Perform an environmental scan

Buy Now
Questions 90

A business analyst (BA) creates the following diagram as part of current state analysis activities.

CCBA Question 90

What does a diagram of this type help users to understand?

Options:

A.

Decision-making

B.

Regulatory compliance

C.

Business capability

D.

Process improvement

Buy Now
Questions 91

A one-location restaurant has been a huge success and the owner wants to expand into more markets. The owner wants to ensure that the quality of the food and pleasing atmosphere is maintained without introducing new variables. Working with the key members of the organization, the owner determines that training and standard processes must be defined. The owner engages a business analyst (BA) to create training materials and operating procedures based on the existing processes at the original restaurant. During this documentation, the BA identifies some opportunities for improvement. How must the BA proceed?

Options:

A.

Schedule time with the owner to review any opportunities to improve existing processes and obtainpermission to include changes before documenting

B.

Create documentation based on the observed processes because improvements are outside of the scope of the project

C.

Provide documentation of improved procedures based on the observed opportunities for then new location

D.

Perform benchmarking and market analysis to determine whether there are standard procedures in the restaurant industry that support the opportunities identified

Buy Now
Questions 92

The business analyst (BA) has scheduled an informal review of audit requirements with the compliance officer. The BA wants to demonstrate that the requirements collectively support one another so begins with reviewing the:

Options:

A.

template architectures.

B.

business rules document.

C.

functional specification.

D.

work breakdown structure.

Buy Now
Questions 93

A large online retailer is introducing new technology to upgrade its aging ordering process. The business analyst (BA) has drawn a stakeholder matrix showing information on how to engage with the stakeholders throughout the project.

CCBA Question 93

Using the stakeholder matrix as a guide, how should the BA engage the suppliers?

Options:

A.

Meet with the suppliers to discuss their needs

B.

Ensure the suppliers are kept informed by showing interest in their needs

C.

Communicate changes to the suppliers by general communication

D.

Focus efforts to engage with the suppliers regularly

Buy Now
Questions 94

The business analyst (BA) has completed the verification of a set of requirements, but a change in scope has materialized. Which technique should the BA use to obtain consensus and reach agreement among the stakeholders?

Options:

A.

Financial analysis

B.

Business rules analysis

C.

Decision analysis

D.

Risk analysis and management

Buy Now
Questions 95

A business analyst (BA) begins to suspect that the ongoing elicitation activities with stakeholders are not delivering the quality of business analysis information required due to a lack of stakeholder participation. What type of technique can the BA adopt to resolve this type of issue?

Options:

A.

Stakeholder Engagement

B.

Roles and Permissions Matrix

C.

Requirements Validation

D.

Risk Analysis and Management

Buy Now
Questions 96

A business analyst (BA) worked with two stakeholders to finalize the access rights related requirements for an internal software application. According to the first stakeholder “Comments, once entered in the application, should be stored for 365 days and should not allow the users to delete”. According to the second stakeholder, “The users with super administrator privileges should be able to add/delete/modify every page/section in the entire application.” Which characteristic does this pair of requirements fail to meet?

Options:

A.

Concise

B.

Consistent

C.

Complete

D.

Complex

Buy Now
Questions 97

Requirements have been prioritized in the product backlog for inclusion in the upcoming release. One of the project team members fears that at least one requirement from the prioritization list is not finalized and still requires further analysis. Which of the following factors describe the affected requirement?

Options:

A.

Benefit

B.

Dependency

C.

Stability

D.

Risk

Buy Now
Questions 98

The business analyst (BA) recommended a new application be rolled out in phases. After reviewing alternatives, the project sponsor agreed. What does the BA expect to achieve by this approach?

Options:

A.

Increase stakeholder engagement

B.

Maximize allocation

C.

Maximize benefits

D.

Increase process validation

Buy Now
Questions 99

A survey on a new system was conducted after the chief executive officer (CEO), who is also the project sponsor, expressed concerns about the uptake of the new system. The CEO is neither sure that the concerns are valid nor whether the survey was conclusive about the success of the project. The business analyst (BA) has been tasked to address the concerns expressed by the CEO and evaluate the results of the survey. What must the BA do to determine that the system is performing as intended and address the concerns of the CEO?

Options:

A.

Evaluate the new system against competitor applications

B.

Confirm the satisfaction of business requirements

C.

Conduct another survey to validate the original results

D.

Validate performance measures and alignment with KPIs

Buy Now
Questions 100

Two business analysts (BAs) are working on a requirement elicitation activity. One BA comes across a checklist that contains stakeholder details such as who are involved, location, group dynamics that are to be considered before beginning the elicitation activity and seeks a clarification from the second BA. The other BA explains that these details, along with several other items mentioned in the checklist, are required to:

Options:

A.

select elicitation techniques.

B.

prepare stakeholders.

C.

secure supporting material.

D.

understand scope of elicitation.

Buy Now
Questions 101

A business analyst (BA) is verifying requirements for a software solution. The BA needs to confirm that items determined to be important are included in the final requirements deliverable. Which of the following will help the BA complete this task?

Options:

A.

Checklists

B.

Requirements matrix

C.

Evaluation criteria

D.

Prioritization

Buy Now
Questions 102

A business analyst (BA) is designing solutions for a set of requirements and finds that there is an opportunity to improve the operations of the business. Which of the following is an opportunity for improvement the BA could recommend?

Options:

A.

Create a solution by constructing a number of solution components to meet the requirements

B.

Enable the solutions that will satisfy the highest priority requirements and stakeholder needs

C.

Provide information to staff so they can answer customer inquiries directly themselves

D.

Purchase software that contains features that are not currently required but are included for free

Buy Now
Questions 103

A business analyst (BA) elicits requirements from end users for a new application, and then completes a set of use cases and use case scenarios. What should the BA do next?

Options:

A.

Identify all the roles and responsibilities

B.

Review the use case scenarios

C.

Conduct a requirements workshop

D.

Create acceptance and evaluation

Buy Now
Questions 104

A business analyst (BA) is defining constraints for a project. Which of the following is a valid constraint?

Options:

A.

“The solution must be implemented in six (6) months.”

B.

“The solution must increase sales by 20%.”

C.

“The solution must promote workplace safety.”

D.

“The solution must reduce support calls by 20%.”

Buy Now
Questions 105

A business analyst (BA) asked two stakeholders with approval authority to approve the requirements. The stakeholders are being asked to confirm that:

Options:

A.

organizational value will be created from the investment.

B.

all questions have been answered.

C.

project priorities are agreed upon.

D.

relevant legal and regulatory needs are met.

Buy Now
Questions 106

The Chief Executive Officer (CEO) is concerned about how two client bases are going to be integrated and serviced in the newly formed company after a merger. A project has been initiated to implement a Customer Relationship Management (CRM) system for the new company that will contain the client information from both companies. What must the business analyst (BA) do to address the concerns of the CEO?

Options:

A.

Demonstrate the functionality of the new CRM

B.

Reuse requirements models from each company

C.

Ensure all regulatory requirements are documented

D.

Create merged viewpoints of the requirements

Buy Now
Questions 107

A project is initiated to create new financial reports for the accounting department, and the accountants have a wide range of views as to what would serve them best. What should the business analyst (BA) do to develop the correct set of requirements?

Options:

A.

Conduct an impact analysis

B.

Estimate the scope of work

C.

Resolve differences of opinion

D.

Perform a feasibility study

Buy Now
Questions 108

A deployed loan product was funded with the expectation of prepayment risk reduction. Initially key performance indicators would be to take similar loan prepayment rates over the previous 10-year period and compare it with the new product. After implementation, the business analyst (BA) determines that the decade old housing market is vastly different. Which of the following should the BA consider for validity of performance measures?

Options:

A.

Currency

B.

Timing

C.

Sample size

D.

Frequency

Buy Now
Questions 109

A business analyst (BA) is tasked with performing a gap analysis between two existing systems to combine into a single system or run just one system. Which of the following modelling formats will show the requirements for both systems side by side?

Options:

A.

Activity Flow

B.

Matrix

C.

Glossary

D.

Bubble Chart

Buy Now
Questions 110

For a new account payable (AP) solution, the solution owner has provided the business analyst (BA) with goals the AP management team would like the solution to support. To ensure the solution meets these needs, the BA documents key performance indicators (KPIs). Which of the following is an example of a KPI?

Options:

A.

“The solution will send payment notification to the account holder after successful processing

B.

“The solution will report the average number of days an account payment is outstanding”

C.

“The solution will reduce the payment processing time from three days to two days”

D.

“The solution will enable account holders to make account payments via a web form”

Buy Now
Questions 111

A business analyst (BA) is in the process of specifying the confirmed results of a requirements elicitation workshop. Which of the following helps ensure that the correct information about the requirements is provided to the participants?

Options:

A.

Roles and permissions matrix

B.

Requirements architecture

C.

Stakeholder list

D.

Standard templates and syntax

Buy Now
Questions 112

A business analyst (BA) is working on a project that has a release date that cannot be changed. The BA engaged with stakeholders and completed the business requirements elicitation task. Upon review with the rest of the project team, it is determined that not all requirements can be implemented by the set deadline. What must the BA do to ensure maximum business value?

Options:

A.

Ensure test scenarios conform to business requirements

B.

Align business requirements to organizational strategy

C.

Analyze requirements to remove unnecessary components

D.

Choose an appropriate format to communicate requirements

Buy Now
Questions 113

A recent survey shows that a newly implemented system has features that the users have never used. Upon reviewing the survey report, the Chief Executive Officer (CEO) highlighted that the company must avoid future implementations with functionality that does not provide any business value. What must the business analyst (BA) do to ensure future requirements meet a business need?

Options:

A.

Facilitate a focus group with users to get feedback

B.

Choose an appropriate format to communicate requirements

C.

Consider business relevance while tracing requirements

D.

Ensure test scenarios align to business requirements

Buy Now
Questions 114

A business analyst (BA) is working on a project to implement a commercial off-the-shelf (COTS) application for tracking customers. In an observation session with a domain subject matter expert (SME), the BA notes that the SME keeps separate records for the customers who are also vendors. The BA knows that the new software has a module for vendor management that would integrate the vendor and customer records. Which type of opportunity has the BA identified?

Options:

A.

Potential to provide future value supported by the system

B.

Ability to provide greater amounts of information to staff

C.

Elimination of duplicate tasks performed by staff

D.

Automation to increase consistency of behavior

Buy Now
Questions 115

Stakeholders initially agreed to an implementation schedule for a set of reports based on the value to business users. The development team provided a detailed estimate of the time required to develop each report based on the business requirements. What should the business analyst (BA) and the stakeholders do with the estimates?

Options:

A.

Review the priorities.

B.

Analyze technical constraints.

C.

Revise the business requirements.

D.

Write functional report specifications.

Buy Now
Questions 116

A business analyst (BA) is eliciting requirements for a pharmaceutical distribution company with an expansion plan across many states, each with its own tools and methods. To make the requirements as reusable as possible, what should the BA do?

Options:

A.

Describe the requirements at a high level of abstraction.

B.

Provide details for the requirements.

C.

Limit the relationships between requirements.

D.

Make specific references to applications or departments.

Buy Now
Questions 117

A project team needs to maintain the traceability of requirements for a software system. Due to the large number of requirements, which of the following methods should the team use?

Options:

A.

Create a requirements model

B.

Maintain the requirements manually

C.

Develop a database management system

D.

Use a requirements management tool

Buy Now
Questions 118

A business analyst (BA) decided to capture requirements by inviting all the stakeholders to meet at an office location. After invitations were sent, it turned out that not everyone could attend this meeting because of their individual dispersed locations. Which of the following does the BA need to adjust to handle this situation?

Options:

A.

Elicitation scope

B.

Elicitation technique

C.

Project stakeholders

D.

Logistics setup

Buy Now
Questions 119

In a project meeting, stakeholders presented conflicting views on how the business analysis process should be conducted, leading to the sponsor becoming very upset. If a similar situation arises in the future, what can the business analyst (BA) do to avoid the situation?

Options:

A.

Develop a clearer RACI matrix

B.

Communicate with each stakeholder individually

C.

Obtain stakeholder signoff on the approach

D.

Obtain approval for the business case

Buy Now
Questions 120

An organization has identified a market opportunity that could result in significant business gains. A business analyst (BA) is asked to assist in building the new business model. The BA begins by analyzing the current state. What input is critical to the current state analysis?

Options:

A.

Organizational culture

B.

Risks and assumptions

C.

Goals and objectives

D.

Business needs

Buy Now
Questions 121

A business analyst (BA) is given an additional requirement near the end of the development phase that needs to be incorporated into the system as part of the same release. In this situation, the first activity the BA performs to understand the effect of the proposed change is to:

Options:

A.

Check with the project manager for timeline and budget metrics.

B.

Determine whether stakeholders are available for further elicitation.

C.

Determine whether the additional requirement is traceable to a need.

D.

Consult with the technical team for technical feasibility.

Buy Now
Questions 122

Market studies projected a 28% year-over-year growth for five (5) years for commercial vehicle loans. A company that provides lending for commercial vehicles wanted to keep up with industrydemand; however, their applications were not capable of scaling to the increased demand for loan processing and billing. The company is deploying a new system to meet the demand. The project started five (5) years ago and cost $2 million USD. The project metrics are to be evaluated after five (5) years. The return on investment (ROI) for the project is calculated at 11%. The project sponsors are upset that the desired ROI for the project was not met. What was the root cause of this issue?

Options:

A.

Demand forecasting

B.

Capability planning

C.

Risk planning

D.

Flawed assumptions

Buy Now
Questions 123

A business analyst (BA) is developing requirements for a project with a limited budget. The business owner will be prioritizing requirements so that low-value requirements can be de-scoped and the project remains within budget. Which of the following should the BA take into account to facilitate prioritization and ensure business objectives are met?

Options:

A.

Dependencies

B.

Data flow

C.

Functional decomposition

D.

Traceability

Buy Now
Questions 124

The business analyst (BA) has scheduled an informal review of audit requirements with the compliance officer. The BA wants to demonstrate that the requirements collectively support one another, so they begin by reviewing the:

Options:

A.

Work breakdown structure

B.

Template architectures

C.

Functional specification

D.

Business rules document

Buy Now
Questions 125

A business analyst (BA) has identified the impacts and resolution for a proposed change. Based on the Responsible, Accountable, Consulted, Informed (RACI) matrix, who must approve the change before it is implemented?

Options:

A.

Business sponsor

B.

Subject matter expert

C.

Project manager

D.

System architect

Buy Now
Questions 126

A business analyst (BA) is planning how to present a set of requirements for a project with financial constraints. Which requirements attribute should the BA assign to allow cost implications to be assessed?

Options:

A.

Status

B.

Source

C.

Ownership

D.

Complexity

Buy Now
Questions 127

A domain subject matter expert (SME) describes a scenario to the business analyst (BA) that may need to be considered for an impending change. The BA and domain SME sketch out the process model for this exception scenario for consideration. What action does the BA take?

Options:

A.

Document the elicitation results then verify and validate them in a requirements review

B.

Plan an observation activity to gain a hands-on understanding of the situation

C.

Review the issue with stakeholders during a follow-up session

D.

Capture and integrate this process model into other appropriate planned outcomes

Buy Now
Questions 128

A business analyst (BA) has elicited the following requirement: "The solution must ensure the portal response times are under 2 seconds." What requirement classification schema does this requirement belong to?

Options:

A.

Non-functional requirements

B.

Transitional requirements

C.

Stakeholder requirements

D.

Functional requirements

Buy Now
Questions 129

A new product that is tablet-enabled is being considered to replace an older product to process orders. The data captured is sent to existing downstream applications, which are not being updated. What is the first thing that a business analyst (BA) should consider?

Options:

A.

Developing process and data models

B.

Performing an interface analysis

C.

Conducting a vendor assessment

D.

Identifying constraints and dependencies

Buy Now
Questions 130

The business analyst (BA) has an item logged in the action items register requiring the verification of forthcoming legislation in the next three months that might impact the proposed architecture. What should the BA do next?

Options:

A.

Transfer the item to the legal department

B.

Assess the impact immediately

C.

Present the item to the project manager

D.

Determine the performance

Buy Now
Questions 131

A company has bought a customizable software product, and the vendor's business analyst (BA) is visiting the company's office to perform a requirements assessment. The business sponsor expresses an interest in improving a specific process that is in scope. What should the BA do?

Options:

A.

Create a process model

B.

Review data flow diagrams

C.

Develop a data model

D.

Observe the activity

Buy Now
Questions 132

A long-established company selling ice cream is entering its crucial sales period leading up to summer. Based on the company's risk tolerance, a business analyst (BA) has advised against replacing the most popular flavors with new untested flavors. What is the company's attitude toward risk, as assessed by the BA?

Options:

A.

Risk-optimizing

B.

Risk-neutral

C.

Risk-averse

D.

Risk-seeking

Buy Now
Questions 133

An organization is planning to launch an exciting new service that has never been offered before. The expectations are that the service will be extremely popular with young families, but because the organization wants to keep it a secret until launch day, there is no way of knowing whether this is correct. Why should the business analyst (BA) suggest identifying high customer demand by young families as a risk?

Options:

A.

To manage the associated risks.

B.

To prove the idea is correct.

C.

To provide a benchmark against future change.

D.

To assess the costs and benefits accurately.

Buy Now
Questions 134

A business analyst (BA) is compiling information on different approaches that will meet solution requirements in order to make a recommendation for solution design. To evaluate whether externally available solutions meet the requirements, which of the following will the BA create and distribute?

Options:

A.

Statement of Work (SOW)

B.

Request for Information (RFI)

C.

Work Breakdown Structure (WBS)

D.

Rough Order of Magnitude (ROM)

Buy Now
Questions 135

A general insurance company wants to enter a new market that has the potential for high profit and little competition. The business analyst (BA) was asked to prepare a presentation for key stakeholders to show how the new segment will deliver value for stakeholders. Which of the following is best suited for this purpose?

Options:

A.

Business architecture

B.

Business model canvas

C.

Business case

D.

Capability analysis map

Buy Now
Questions 136

A business analyst (BA) is working on a project for a media company. The BA has verified, validated, and prioritized the requirements based on business benefits. During the development phase, the team discovered that the current viewer will no longer be supported by the provider. The technical team needs to either upgrade to the newer version with different features or find an alternate viewer. Given this new information, what is the next step for the BA?

Options:

A.

Convince stakeholders that the business benefits are unachievable due to technical constraints.

B.

Communicate the technical constraints to customers.

C.

Continue the project as it is currently important to focus on customer satisfaction.

D.

Assess the impacts and re-prioritize the requirements based on technical constraints.

Buy Now
Questions 137

A facilities management company has an ambitious growth plan of doubling the revenue of their office waste recycling service over the next 12 months. The business analyst (BA) plans to define the objectives and align them with the enterprise’s vision, mission, and goals. What element of 'SMART' goals would this objective refer to?

Options:

A.

Relevant

B.

Measurable

C.

Specialized

D.

Achievable

Buy Now
Questions 138

A business analyst (BA) is negotiating and resolving conflict with stakeholders to ensure they participate in the required BA activities. Which element of stakeholder management is the BA performing?

Options:

A.

Plan stakeholder engagement

B.

Monitor stakeholder engagement

C.

Gain agreement on commitments

D.

Confirm elicitation results

Buy Now
Questions 139

Performance measures have been collected and analyzed by a business analyst (BA) to evaluate a solution that was launched a few years ago; however, the performance measures do not indicatewhether or not the solution is contributing to the desired value. What is the recommended next step?

Options:

A.

Replace the solution as soon as possible

B.

Increase the efficiency of the solution

C.

Reduce the business' expectations of value

D.

Identify and collect more measurements

Buy Now
Questions 140

During a senior management meeting about a project at the requirements analysis stage, a business analyst (BA) stated that there were a number of workarounds associated with the current application. The Chief Information Officer (CIO) was looking for ways to improve the situation, and the BA suggests a solution. Which of the following can the BA suggest that the organization consider to increase efficiencies?

Options:

A.

Strategic realignment

B.

Capability assessment

C.

Project abandonment

D.

Process improvement

Buy Now
Questions 141

A business analyst (BA) is preparing an analysis approach to replace a 12-year-old air traffic control system. The BA aims to define the solution definition before implementation, capture theinformation in standardized templates, and ensure that all activities are identified first and then divided into tasks. Which approach provides the appropriate level of formality for this project?

Options:

A.

Reactive

B.

Adaptive

C.

Proactive

D.

Predictive

Buy Now
Questions 142

A business analyst (BA) has set up a number of elicitation workshops with key subject matter experts (SMEs) on a new project. All SMEs have accepted the workshop invitations except forthe legal SME, who has not responded to any invitations. The first workshop is scheduled for next week, and the BA has tried unsuccessfully to reach the legal SME by phone. How should the BA proceed?

Options:

A.

Drop by the legal SME’s desk and have an informal chat about how important their involvement is.

B.

Re-check the legal SME’s schedule and re-arrange all of the workshops based on vacancies in their calendar.

C.

Escalate the non-response to the legal SME’s manager via email and request that they make the SME attend.

D.

Proceed with the first workshop and capture the non-response as a project issue for the project manager to address.

Buy Now
Questions 143

A project is being initiated to enhance an online product because sales have declined for over a year. The company leaders are confident that all of the skills needed to improve the product exist within the company. By enhancing the product, sales will increase, and new customers will emerge. A business analyst (BA) will help the enhancement project by first:

Options:

A.

Identifying the stakeholders

B.

Implementing a suitable solution

C.

Documenting the requirements

D.

Evaluating the business need

Buy Now
Questions 144

Stakeholders must be able to determine the audit and approval history of requirements and designs. Which of the following provides a means to document traceability and change?

Options:

A.

Risk analysis and management

B.

Acceptance and evaluation criteria

C.

Requirements management tools

D.

Legal and regulatory information

Buy Now
Questions 145

Two stakeholders are arguing over which model to use for requirements. One insists that using an activity diagram is superior, while the other prefers a state diagram. How should the business analyst (BA) resolve the conflict?

Options:

A.

Suggest a fusion model that integrates activity and state diagrams

B.

Explain that the models are complementary to each other

C.

Allow both stakeholders to work on the models independently

D.

Introduce a third model type so that neither stakeholder prevails

Buy Now
Questions 146

Project work is taking place to evaluate whether a system's requirements can be met via creating internally, purchasing from others, or a combination of the two. What goal is addressed by this analysis?

Options:

A.

Developing the project plan

B.

Validating the requirements

C.

Outlining the change control strategy

D.

Defining the solution approach

Buy Now
Questions 147

A business analyst (BA) is given an additional requirement near the end of the development phase that needs to be incorporated into the system as part of the same release. In this situation, the first activity the BA performs to understand the effect of the proposed change is to:

Options:

A.

determine whether stakeholders are available for further elicitation.

B.

consult with the technical team for technical feasibility.

C.

determine whether the additional requirement is traceable to a need.

D.

check with the project manager for timeline and budget metrics.

Buy Now
Questions 148

The director of a furniture store manages a group of skilled carpenters who make furniture from locally available materials. The director decides to automate its inventory processes so that carpenters can place orders for raw materials themselves. A business analyst (BA) is engaged to define the requirements and propose options for commercial off-the-shelf (COTS) inventory management solutions. After meeting with the director, the BA needs to schedule a workshop with the carpenters to:

Options:

A.

investigate whether automation is a constant for the end user.

B.

demonstrate some of the proposed products to the end users.

C.

convey the benefits for the automation to the end users.

D.

present the proposed future state to the end users.

Buy Now
Questions 149

Stakeholder requirements were approved for a business process reengineering initiative along with the creation of a roadmap. Due to market conditions, the product roadmap is modified to move the default process to the next iteration. What should the business analyst (BA) update in the stakeholder requirements?

Options:

A.

Requirement attribute values

B.

Scope model

C.

Requirement description

D.

Requirement performance measures

Buy Now
Questions 150

After an initial project kick-off meeting, the business analyst (BA) determined that the project has a short deadline and a regulatory mandate with stiff penalties for non-compliance. The stakeholders do not want to risk missing the deadline, and management is willing to commit any amount of resources to meet the deadline. Which kind of approach is suitable for the initiative?

Options:

A.

Adaptive development process

B.

Crystal clear development process

C.

Kanban development process

D.

Predictive development process

Buy Now
Questions 151

A business analyst (BA) has completed multiple workshops involving a number of stakeholders, including the project manager; however, the elicitation results are inconsistent between the stakeholders. How should the variation in results be resolved?

Options:

A.

The BA should model the elicited requirements in a review meeting.

B.

The project manager should decide which requirement is relevant.

C.

The project manager should model the elicited requirements in a review meeting.

D.

The BA should select which requirements are correct.

Buy Now
Questions 152

There are three inputs for stakeholder analysis. Which input describes the existing organizational units and their interactions with one another?

Options:

A.

Business need

B.

Enterprise architecture

C.

Matrix structure

D.

Organizational process asset

Buy Now
Questions 153

As a business analyst, you should work to identify opportunities to improve the operations of your organization. Which one of the following improvement opportunities aims to improve the experience of the customer?

Options:

A.

Eliminate redundancy.

B.

Automate or simplify the work people perform.

C.

Increase consistency of behavior.

D.

Improve the purchasing process.

Buy Now
Questions 154

A business analyst has determined that a project should be worth $2,750,000 in four years if her company decides to pursue the project. Assuming the rate of return on the investment is six percent, what is the minimum amount of funds the organization should invest in this project?

Options:

A.

$2,585,000.00

B.

$2,749,001.99

C.

$2,178,257.57

D.

$165,000

Buy Now
Questions 155

You are the business analyst for your organization. You are currently working with Steve on the organize requirements process. You and Steve have elected to use the user stories approach for this process. What is the user stories approach for requirements organization?

Options:

A.

Stakeholders' objectives are described to identify the requirements that the solution will need to support.

B.

Stakeholders are interviewed and their stories are recorded as part of the requirements.

C.

Stakeholders are interviewed and their experiences are recorded to help identify the requirements.

D.

Stakeholders' experiences equate to the stakeholder requirements.

Buy Now
Questions 156

What type of analysis can a business analyst perform to understand the functions of stakeholders, the location of stakeholders, the tasks stakeholders complete, and the stakeholders' concerns about the solution?

Options:

A.

Technical assessment

B.

Stakeholder impact analysis

C.

Organizational assessment

D.

Operational analysis

Buy Now
Questions 157

Which stakeholder(s) will be involved to determine if the requirements can be implemented?

Options:

A.

Domain subject matter expert

B.

Implementation subject matter expert

C.

Project team members

D.

Sponsor

Buy Now
Questions 158

A business analyst (BA) decided to capture requirements by inviting all the stakeholders to meet at an office location. After invitations were sent, it turned out that not everyone could attend this meeting because of their individual dispersed locations.

Which of the following does the BA need to adjust to handle this situation?

Options:

A.

Project stakeholders

B.

Logistics setup

C.

Elicitation scope

D.

Elicitation technique

Buy Now
Questions 159

Which tool will allow a business analyst (BA) to determine how information is input, processed, stored, and extracted from a collection of systems?

Options:

A.

Data Glossary

B.

Activity Flow

C.

Entity Relationship Diagram

D.

Data Flow Diagram

Buy Now
Questions 160

A business analyst (BA) is defining relationships between business requirements and solution components. Which guideline will the BA use to accomplish this?

Options:

A.

Change Strategy

B.

Solution Scope

C.

Solution Objectives

D.

Domain Knowledge

Buy Now
Questions 161

A senior business analyst (BA) must review the requirements specification of a junior BA. The senior BA puts together a list of key evaluation criteria to guide the determination of a requirement's quality. Which of the criteria below is a characteristic of a quality requirement?

Options:

A.

Atomic

B.

Owned

C.

Mapped

D.

Allocated

Buy Now
Questions 162

A business analyst (BA) spent three months eliciting, specifying, and modelling the detailed stakeholder and solution requirements. Right before requirement sign-off, the BA realized that the Vice President was unable to approve the requirements and the Chief Financial Officer should do so. What element of requirement approval did the BA miss?

Options:

A.

Manage conflicts and issues

B.

Track and communicate approval

C.

Gain consensus

D.

Understand stakeholder roles

Buy Now
Questions 163

A business analyst (BA) is proposing design options and a number of opportunities are occurring that need to be understood further. One particular opportunity will prevent different stakeholders from performing the same function in distinctly different ways. What type of opportunity is this?

Options:

A.

Reduced barriers to entry

B.

improved access to information

C.

increased efficiency

D.

Additional capabilities

Buy Now
Questions 164

A business analyst (BA) is working on a project to improve product delivery. The issues arise during the latter stages of the delivery Freecycle and are due to poor communication of the business analysis information from the elicitation phase. As a result, a BA has ensured that the testing and training teams are identified as stakeholders on the RACI Matrix going forward. To which RAG designation should the training and testing teams be added?

Options:

A.

Consulted

B.

Responsible

C.

Accountable

D.

Informed

Buy Now
Questions 165

An organization is experiencing long contracting life cycles when establishing annual contracts with its customers. Upon initial investigation, the outdated application was thought to be the cause, however based on further analysis the business process is found to be flawed. The business analyst (BA) wants to model the people involved in the process. Which of the following techniques models the responsibilities of these stakeholders?

Options:

A.

Roles and Permissions Matric

B.

Data Flow Diagram

C.

Use Cases and Scenarios

D.

Activity Flow

Buy Now
Questions 166

A business analyst (BA) conducted a requirements elicitation session with project stakeholders and communicated the results. The project sponsor expressed concern with certain requirements that address the federal government legislation. What must the BA do to address the concern of the project sponsor?

Options:

A.

Compare requirements with compliance requirements

B.

Determine the communication plan for requirements

C.

Reassure the project sponsor that testing will be conducted diligently

D.

Ensure requirements are traceable up to user acceptance testing

Buy Now
Questions 167

A new product that is tablet-enabled is being considered to replace an older product to process orders. The data captured is sent to existing downstream applications which are not being updated. What is the first thing that a business analyst (BA) should consider?

Options:

A.

Conducting a vendor assessment

B.

Performing an interface analysis

C.

Identifying constraints and dependence

D.

Developing process and data models

Buy Now
Questions 168

A project is being initiated to enhance an on-line product because sales have declined for over a year. The company leader’s ant confident that all of the skills needed to improve the product exist within the company. By enhancing the product, sales will increase and new customers will emerge. A business analyst (BA) will help the enhancement project by first:

Options:

A.

documenting the requirements.

B.

identifying the stakeholders.

C.

implementing a suitable solution.

D.

evaluating the business need.

Buy Now
Questions 169

A business analyst (BA) plans to organize a focus group to bring all the interested parties together and discuss the issues and possible risks for the new initiative. Due to the geographical differences of each participant a videoconferencing service will be used to satisfy stakeholder preferences. Which approach is the BA defining?

Options:

A.

Stakeholder analysis

B.

Issue management

C.

Release planning

D.

Stakeholder collaboration

Buy Now
Questions 170

A business analyst (BA) is preparing for elicitation activities and needs to determine who should be consulted, who should participate, and what roles each should fill. Which elicitation technique should the BA use?

Options:

A.

Estimation

B.

Stakeholder List

C.

Data Mining

D.

Interviews

Buy Now
Questions 171

A project manager (PM) is planning the project timelines along with a business analyst (BA) and they come across the task of requirement allocation. The PM wants to know what the dependencies are before the requirement allocation task is initiated and seeks the BA's advice. Which of the following is a dependency that the BA will highlight as a predecessor for requirement allocation?

Options:

A.

Requirements architecture is approved

B.

Design options are available

C.

Solution approach has been determined

D.

Requirement are validated

Buy Now
Questions 172

Stakeholder requirements were approved for a business process reengineering initiative along with the creation of a roadmap.

Due to market conditions, the product roadmap is modified to move the default process to the next iteration. What should the business analyst (BA) modify in the stakeholder requirements?

    Requirement attribute values

    Requirement description

    Requirement performance measures

Options:

A.

Scope model

Buy Now
Questions 173

A long-established company selling ice cream is entering its crucial sales period leading up to summer. Based on the company's risk tolerance, a business analyst (BA) has advised against replacing the most popular flavors with new untested flavors. What is the company's attitude toward risk, as assessed by the BA?

Options:

A.

Risk-neutral

B.

Risk-optimizing

C.

Risk-averse

D.

Risk-soaking

Buy Now
Questions 174

A business analyst (BA) held a formal walk through of requirements developed on a project. Stakeholders expressed concerns because they had different interpretations of the requirements. What activity would help ensure a common understanding?

Options:

A.

Ensure appropriate templates used throughout elicitation

B.

Ensure consistent referencing of requirements

C.

Ensure compliance with key performance indicators

D.

Ensure correct terminology is used

Buy Now
Questions 175

A business analyst (BA) is developing requirements for a project with a limited budget. The business owner will be prioritizing requirements so that low value requirements can be de-scoped and the project remain within budget. Which of the following should the BA take into account to facilitate prioritization and ensure business objectives are met?

Options:

A.

Data flow

B.

Functional decomposition

C.

Traceability

D.

Dependencies

Buy Now
Questions 176

The Business Requirements Document (BRD) prepared by the business analyst (BA) was circulated to stakeholders for approval. Some stakeholders objected to the Use Case diagrams and could not understand them. Why would these be included in the document?

Options:

A.

The models were included as a mistake because Use Case diagrams are technical.

B.

The models are part of the technical documents and not part of BRD documents.

C.

The models are used for analysis and refining requirements and design.

D.

The models did not change the value compared to text-based requirements

Buy Now
Questions 177

A business analyst (BA) is developing the requirements for an inventory management system. Some current accounting processes are automated but other departments like purchasing, marketing, sales and distribution departments work in isolation and have a manual process. They extensively use spreadsheets to maintain the transactions and at the end of the day the department managers manually verify and reconcile transactions before supplying the information to the accounting department. In order to verify and validate the elicited requirements, the BA will need to prepare a:

Options:

A.

single process model on automation for all stakeholders.

B.

database structure in the viewpoint of the selected stakeholders

C.

list of requirements in a spreadsheet for all stakeholders.

D.

set of process models in the viewpoint of the selected stakeholders.

Buy Now
Questions 178

A business analyst (BA) is assessing risks on a project addressing the implementation of a new web portal. Which of the following would the BA classify as a project risk?

Options:

A.

Customer service ratings will increase with the new system

B.

Current infrastructure may not support increased performance

C.

Expenditures are currently below budgeted estimates

D.

Support calls will increase if the change is not performed

Buy Now
Questions 179

A business analyst (BA) is planning the traceability approach for a project. Why should the BA conduct this planning activity?

Options:

A.

To verify that project information is represented at a high level of abstraction

B.

To document the relationship between the different phases of the project for different stakeholders

C.

To ensure the approach provides enough detail to add value without excessive overhead

D.

To associate information with individual or related groups of requirements

Buy Now
Questions 180

A business analyst (BA) has been asked to develop a plan to complete the associated business analysis activities for a project in which an organization is switching from a manual to an automated process for receiving payments. As the final step in developing the plan, which technique will the BA use?

Options:

A.

Surveys or QUESTION NO:naires for the current initiative

B.

Functional Decomposition for the current initiative

C.

Lessons learned from previous initiatives

D.

Process modelling from previous initiatives

Buy Now
Questions 181

A business analyst (BA) is defining a stakeholder approval approach for the requirement deliverables. The project involves implementing new government regulatory requirements with significant risk to the organization in case of non-compliance. According to the BABOK ® GUIDE, what will the BA need to do?

Options:

A.

Ensure high level user stories are completed and accepted

B.

Use an informal approval process to speed up delivery

C.

Use a rigorous approval process of detailed specifications

D.

Ensure the document is completed and signed off

Buy Now
Questions 182

A business analyst (BA) is working to identity the business need, specifically the problems with the current state of a process. At which level of the enterprise can the BA identify problems with the current state?

Options:

A.

Bottom-up

B.

Top-down

C.

From external drivers

D.

From middle-management

Buy Now
Questions 183

During planning, elicitation, and sign off of requirements, the stakeholders felt that their opinions were not heard and information was not frequently shared. What major competency was lacking in this process?

Options:

A.

Collaboration

B.

Trustworthiness

C.

Information

D.

Communication

Buy Now
Questions 184

A banking giant recently found a major security loophole in their online banking platform that could expose customer information. Security experts and the business analyst (BA) develop a low cost, low effort emergency fix to address this issue. What factor should the BA use to convince the bank to move forward with the emergency fix?

Options:

A.

Cost

B.

Schedule

C.

Impact

D.

Urgency

Buy Now
Questions 185

A company is embarking on a software project in a heavily regulated domain. The client expects large upfront planning and detailed documentation for the project. The recommended approach for the project will be:

Options:

A.

adaptive.

B.

predictive.

C.

waterfall.

D.

scrum.

Buy Now
Questions 186

A company wants to increase transaction service offerings using its on-line channels. The existing application already has some of the required functionality. A new project has been initiated to implement the additional capabilities but the company management is unsure of thecomplexity of the project. What exercise must be carried out to determine the changes needed in the new application?

Options:

A.

Perform gap analysis of current and future states

B.

Identify internal solution component dependencies

C.

Evaluate competitor applications

D.

Assess organizational culture

Buy Now
Questions 187

A lead business analyst (BA) analyzed the performance of all BA's within the organization. How should the BA approach communicating the results to stakeholders?

Options:

A.

Compare a solution used at another company

B.

Identify the performance objectives

C.

Select performance measures

D.

Determine the reporting requirements

Buy Now
Questions 188

A business analyst (BA) is measuring solution performance of a new system. What should the BA consider to avoid skewed results and an inaccurate conclusion?

Options:

A.

Frequency

B.

Volume

C.

Currency

D.

Timing

Buy Now
Questions 189

There are three inputs to the business analysis planning approach process. Which one of the following is not one of the three inputs?

Options:

A.

Risk and rewards analysis

B.

Business need

C.

Organizational process assets

D.

Expert judgment

Buy Now
Questions 190

You are the business analyst for a large project in your organization. While your company prefers face-to-face communications there are many stakeholders located in different geographical locations. How can you still effectively serve as a business analyst when the stakeholders are not collocated?

Options:

A.

You will need the stakeholders to periodically gather in one locale.

B.

You will need to travel on a regular rotation to each of the geographical locations to complete the business analyst duties.

C.

Add more business analysts in each of the geographical location.

D.

You will need to implement videoconferences.

Buy Now
Questions 191

You are the business analyst for your organization and you're preparing the solution for your organization's review and implementation. Some of the requirements of the solution, however, must be inspected by compliance officers before the project and implementation can move forward. The requirements of the inspection can be best described as what?

Options:

A.

Bottleneck

B.

Requirements

C.

Cost-negativity

D.

Constraint

Buy Now
Exam Code: CCBA
Exam Name: Certification of Capability in Business Analysis (CCBA)
Last Update: Apr 20, 2025
Questions: 638

PDF + Testing Engine

$57.75  $164.99

Testing Engine

$43.75  $124.99
buy now CCBA testing engine

PDF (Q&A)

$36.75  $104.99
buy now CCBA pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 24 Apr 2025