CBAP Certified Business Analysis Professional Questions and Answers

Questions 4

You are the business analyst for your organization. Gary and Janet, two key stakeholders in the project, are in disagreement over a requirement for the type of software to be installed on the server your solution calls for.

What must happen in this instance before formal approval can be offered?

Options:

A.

The conflict will need to be resolved through research, resolution, or through a third-party mediation.

B.

Gary and Janet will need to determine who has seniority in the company to determine which requirement takes precedence.

C.

The conflict will need to be removed from the solution scope until Gary and Janet come to a solution.

D.

The business analyst will need to make a decision on which requirement is most appropriate.

Buy Now
Questions 5

Which of the following diagrams is used to display sensitivity analysis data?

Options:

A.

Decision tree

B.

Ishikawa

C.

Influence

D.

Tornado

Buy Now
Questions 6

You are the business analyst for your organization. Management has asked you to create a plan that will define the proposed structure and schedule for communicating the business analysis activities to the appropriate stakeholders.

What plan does management want you to create?

Options:

A.

Business Analysis Plan

B.

Business Analysis Communications Plan

C.

Communications management plan

D.

Stakeholder Management Plan

Buy Now
Questions 7

A business analyst (BA) was developing an outline of the timing of business analysis activities with the project manager. What factors may impact the Timing of the activities the BA is performing?

Options:

A.

Solution design

B.

Project manager's experience

C.

Project sponsor Interest

D.

Contract Terms

Buy Now
Questions 8

You are preparing a business case for your organization to determine the justification of the costs of the solution in relation to benefits the solutions will bring the organization. You need four inputs to complete this process.

Which one of the following is not an input that will help you write the business case?

Options:

A.

Feasibility study

B.

Stakeholder concerns

C.

Assumptions and constraints

D.

Business need

Buy Now
Questions 9

There are just three inputs to the assess proposed solution process.

Which of the following is NOT one of the inputs for the assess proposed solution process?

Options:

A.

Requirements

B.

Decision analysis

C.

Assumptions and constraints

D.

Solution options

Buy Now
Questions 10

Enterprise analysis provides many things for an organization.

All of the following are tasks included in enterprise analysis except for which one?

Options:

A.

Determine solution approach

B.

Define business need

C.

Assess capability gaps

D.

Solution performance assessment

Buy Now
Questions 11

You are the business analyst for the NHQ Organization. Management has asked that you examine the workflow and internal processes for order fulfillment. Specifically, they'd like you to complete an in-depth analysis and documentation of the business problems and opportunities that may be exist for the organization.

What business analysis knowledge area does this activity map to?

Options:

A.

Requirements elicitation

B.

Solution assessment and validation

C.

Enterprise analysis

D.

Requirements management and communication

Buy Now
Questions 12

You are the business analyst for your organization. You are currently working with Steve on the organize requirements process. You and Steve have elected to use the user stories approach for this process.

What is the user stories approach for requirements organization?

Options:

A.

Stakeholders' experiences equate to the stakeholder requirements.

B.

Stakeholders are interviewed and their experiences are recorded to help identify the requirements.

C.

Stakeholders' objectives are described to identify the requirements that the solution will need to support.

D.

Stakeholders are interviewed and their stories are recorded as part of the requirements.

Buy Now
Questions 13

You are creating the solution scope for an identified problem in your organization. You are working with several stakeholders during this process including the domain subject matter expert, the implementation subject matter expert, the project manager, and the sponsor.

Which of these stakeholders will be responsible for writing the project scope?

Options:

A.

Domain subject matter expert

B.

Business analyst

C.

Project manager

D.

Sponsor

Buy Now
Questions 14

You are the business analyst for your organization. Your current project is using a plan-driven approach for the requirements, business analysis, and monitoring.

Which one of the following statements best describes the plan-driven approach to business analysis planning and monitoring?

Options:

A.

Plan-driven approaches determine how priorities will be diagnosed for the project solution.

B.

Plan-driven approaches encourage changes that prevent errors and omissions.

C.

Plan-driven approaches typically have meetings daily to discuss the business analysis requirements process.

D.

Plan-driven approaches typically call for a significant amount of formality and detail.

Buy Now
Questions 15

Your organization is using a plan-driven approach to business analysis.

What characteristic must be true of changes in the approach that your organization is using?

Options:

A.

All the changes only occur if they are less than an agreed factor, such as ten percent of the solution's overall cost or a percentage of the project's schedule.

B.

All the changes only occur if they are less than ten percent of the solution's overall cost.

C.

All the changes only occur if they are genuinely necessary.

D.

Changes are generally not permitted in the plan-driven approach to business analysis.

Buy Now
Questions 16

You are the business analyst for your organization and preparing to complete the requirements elicitation activities. Your manager wants to know when the requirements elicitation process will be completed.

Which of the following responses best describes the nature of the requirements elicitation process?

Options:

A.

The schedule of the project determines the duration of the requirements elicitation process.

B.

The duration of the requirements elicitation activities is determined by the willingness of the project stakeholders to contribute to the requirements information.

C.

The size of the project determines the duration of the requirements elicitation process.

D.

Eliciting requirements is not a compartmentalized activity.

Buy Now
Questions 17

Which conduct stakeholder analysis technique is useful for identifying shared characteristics of a stakeholder group?

Options:

A.

Surveys

B.

Scope modeling

C.

Brainstorming

D.

Interviews

Buy Now
Questions 18

You are the business analyst for your organization. Management has asked that you create a model of the requirements so the stakeholders can better understand the requirements and the project as a whole.

Which of the following statements best describes a model?

Options:

A.

Models are slices of the project solution.

B.

Models simplify the requirements for common stakeholders.

C.

Models are statistics for the return on investment, time saved, and other mathematics.

D.

Models abstract and simplify reality.

Buy Now
Questions 19

The business sponsor of a project to automate a high risk, high profile process has expressed concerns that some activities people perform will be missed. The business analyst (BA) has already created a process flow with associated user stories.

Which of the following actions will address the sponsor’s concerns?

Options:

A.

Record the concerns in the risk register

B.

Schedule a formal review with the stakeholders

C.

Demonstrate traceability to the business case

D.

Review the final approved elicitation results

Buy Now
Questions 20

The objective of a solution implemented was to increase the number of customer calls resolved per hour.

When using basic statistical sampling concepts, what does the business analyst (BA) need to consider?

Options:

A.

Metrics and Key Performance Indicators (KPIs)

B.

Frequency and Timing

C.

Financial Analysis

D.

Benchmarking and Market Analysis

Buy Now
Questions 21

Which of the following tasks cannot start until other tasks are completed?

Options:

A.

Analysis task

B.

Dependent task

C.

Predecessor task

D.

Independent task

Buy Now
Questions 22

Which of the following diagrams is known as Ishikawa diagram?

Options:

A.

Activity

B.

Data-flow

C.

Cost-Benefit

D.

Cause-and Effect

Buy Now
Questions 23

A large company has thousands of geographically dispersed employees and dozens of IT systems. Multiple business analysts (BAs) work in parallel on various requirements with different stakeholders. When considered in isolation, the requirements look meaningful and valuable to those who approved them. However, when it comes to implementation, some of the requirements appear to be contradicting each other. A lead BA recognizes that adding some traceability information would help uncover such conflicts early in the process.

To what should the BA trace the requirements?

Options:

A.

Stakeholder tasks

B.

Business needs

C.

Organizational functions

D.

Solution components

Buy Now
Questions 24

Which of the following techniques is used to test customer acceptance of the solution and to measure marketplace demand?

Options:

A.

Interviews

B.

Market Survey

C.

Technology Assessment

D.

Prototyping

Buy Now
Questions 25

While reviewing a subset of requirements with stakeholders, a business analyst (BA) finds a requirement that does not deliver benefit to any of the stakeholders. After much discussion, the stakeholders decide that the requirement does not align with the solution scope.

What recommendation will the BA make?

Options:

A.

Update the solution design

B.

Re-evaluate the future state

C.

Change the solution scope

D.

Eliminate the requirement

Buy Now
Questions 26

The business analyst (BA) has been tasked with assessing and recommending the best solution that fits an organization's need for a new third-party sales tool.

What technique would be used for identifying suitable options?

Options:

A.

Balanced scorecard

B.

Decision analysis

C.

Vendor assessment

D.

Process analysis

Buy Now
Questions 27

Which of the following qualitative techniques involves a disciplined analysis of the event sequences that could transform a potential hazard into an accident?

Options:

A.

Failure mode and effects criticality analysis

B.

HAZOP technique

C.

Failure mode and effects analysis

D.

Preliminary Risk Analysis

Buy Now
Questions 28

Which of the following types of elicitation allows each stakeholder to freely discuss their role in a particular process?

Options:

A.

Focus group

B.

Structured interview

C.

Quick Interview

D.

Unstructured interview

Buy Now
Questions 29

Which of the following processes measures the maturity level of the security program?

Options:

A.

Risk analysis

B.

Risk mitigation

C.

Risk assessment

D.

GAP analysis

Buy Now
Questions 30

A local manufacturer that serves about 1000 retail stores is experiencing a slow yet steady decrease of its customer base over the last couple of years. Attributing the situation to increased competition, management has hired a team of sales representatives to attract new clients and promote the manufacturer's products. However, after four months there is still no progress. Management has engaged a business analyst (BA) to investigate this issue.

What should the BA do first?

Options:

A.

Perform market research to identify on which competitive advantages the sales team should focus

B.

Create a training program to close potential skill gaps for the sales team

C.

Review historic sales and related data to understand what is happening to the customer base

D.

Identify appropriate training providers and send out a request for proposal

Buy Now
Questions 31

Which of the following participants have to keep the minutes and details of the conversation during Interviews?

Options:

A.

Stakeholder

B.

Scribe

C.

Business Analyst

D.

End user

Buy Now
Questions 32

A sports wristwatch product manufacturer wants to add a blood sugar monitoring toolkit to the watch. Market research has confirmed that the most profitable segment of the manufacturer’s target customer is looking for this feature. The business analyst (BA) worked with the product owner to finalize the set of requirements and design options and then defined multiple approaches for implementing the feature. At this point, the solutions' team agreed that they were unable to accurately assess the merits of each of the proposed solutions.

What is the possible reason?

Options:

A.

Requirements are not allocated to solution components

B.

Too many approaches are dividing the team

C.

Business needs are unclear to the team

D.

Requirements and design options are not detailed enough

Buy Now
Questions 33

Which of the following software development life cycles is a methodology that divides the project into phases, and the project manager focuses on control of time, cost, and scope?

Options:

A.

Spiral

B.

Agile

C.

Waterfall

D.

Incremental

Buy Now
Questions 34

Which of the following chart shows the correlation between project team members and the work they've been assigned to complete?

Options:

A.

Pie chart

B.

Responsibility Assignment Matrix (RAM) chart

C.

Gantt chart

D.

RACI chart

Buy Now
Questions 35

What is the term used to describe the cost of the solution after the solution has been implemented in production by a vendor?

Options:

A.

Total ownership costing

B.

Lifecycle maintenance fees

C.

Sustainability fees

D.

Total cost of ownership

Buy Now
Questions 36

Which one of the following business analysis planning and monitoring techniques can be used to define and document the business analysis approach?

Options:

A.

Process modeling

B.

Structured walkthrough

C.

Decision analysis

D.

Control charts

Buy Now
Questions 37

You are the business analyst for your organization and are training Tracy on business analysis duties. You are explaining to Tracy how it's important for a business analyst to generate new ideas to approaching problems, solving problems, and to generate alternative solutions. You stress that it's important for the business analyst to generate new ideas and innovative concepts.

What type of analytical thinking are you describing for Tracy?

Options:

A.

Lateral thinking

B.

Brainstorming

C.

Creative thinking

D.

Decision making

Buy Now
Questions 38

Ned is the business analyst for the NHQ Company. He is working with Stan on completing the requirements prioritization of all the identified requirements.

Why would Stan and Ned complete requirements prioritization?

Options:

A.

To determine which requirements should be completed first

B.

To determine which requirements should not be completed at all

C.

To determine which requirements, carry the most risk

D.

To determine who created what requirement based on their position in the organization

Buy Now
Questions 39

Which one of the following terms is not a business analysis planning and monitoring approach?

Options:

A.

Structured walkthroughs

B.

Decision analysis

C.

Requirements elicitation

D.

Process modeling

Buy Now
Questions 40

You need to identify assumptions as part of the assessment of capability gaps.

Which of the following is an example of an assumption?

Options:

A.

The project manager believes that her project team members can program in COBOL.

B.

All vendors must have security clearance.

C.

The software must be compatible with the current operating system.

D.

The risk in the project must be quantified.

Buy Now
Questions 41

Henry is the business analyst for his organization. Management has created a pre-determined budget of

$450,000 for his solution. Henry has identified the project requirements but now wants to prioritize them based on timeboxing and budgeting. Henry examines the cost of the requirements and begins removing the requirements from the allowed list in order to meet the $450,000 budget.

What timeboxing or budgeting approach is Henry using?

Options:

A.

Parametric

B.

All in

C.

Selective

D.

All out

Buy Now
Questions 42

You are the business analyst for your organization and are preparing for the conduct elicitation activity. You'll need several stakeholders' roles as you prepare for this activity in your organization.

Which one of the following stakeholders may be responsible to dictate that a specific process or technique be

followed during your requirements elicitation activities?

Options:

A.

Project manager

B.

Regulator

C.

Functional management

D.

Project sponsor

Buy Now
Questions 43

Sally is the business analyst for her organization. Sally and her business analysis team is currently using a business analysis approach to determine what the competition of her organization is offering prospective clients. She is trying to identify solutions to increase revenue by remaining competitive with the competition.

What business analysis approach is Sally and her business analysis team using?

Options:

A.

Business rules analysis

B.

Functional decomposition

C.

Focus groups

D.

Benchmarking

Buy Now
Questions 44

You are creating the solution scope for a proposed solution in your organization. You need to understand the scope of work that needs to be completed. You elect to identify the solution scope and then break the solution scope into smaller work products or deliverables.

What technique are you using in this instance?

Options:

A.

Interface analysis

B.

Scope modeling

C.

Vision statement creation

D.

Functional decomposition

Buy Now
Questions 45

Holly's organization uses a plan-driven approach to business analysis.

When it comes to communication in Holly's organization what type of communication will likely be required?

Options:

A.

Face-to-face

B.

Chain of command

C.

Formal

D.

Ad hoc

Buy Now
Questions 46

You are the business analyst for your organization. You are coaching Tom about the different approaches to business analysis.

Which type of business analysis approach has the most business analysis work at the beginning of the project or during the start of a project phase?

Options:

A.

Change-driven approach

B.

Value-driven approach

C.

Plan-driven approach

D.

Requirements-driven approach

Buy Now
Questions 47

Which of the following charts is important to ensure that the roles and responsibilities of those involved in a task are tracked?

Options:

A.

Pie chart

B.

Line chart

C.

RACI chart

D.

Gantt chart

Buy Now
Questions 48

You and Tom are writing the solution scope for a new project in your organization. You need to create a method to define what solution will and will not provide for the organization.

What technique can you and Tom use to establish appropriate boundaries for the solution?

Options:

A.

Interviews with the key stakeholders

B.

User stories

C.

Functional decomposition

D.

Scope modeling

Buy Now
Questions 49

You are the business analyst for your organization and are working with Virginia on the allocation of requirements for a new solution. You have assigned Virginia the task of breaking down the solution scope into smaller components for allocation.

What technique have you asked Virginia to complete in this scenario?

Options:

A.

Decision analysis

B.

Business rules analysis

C.

Process modeling

D.

Functional decomposition

Buy Now
Questions 50

Management would like you to front-load the requirements with the most risk requirements.

Why would management prefer the risky requirements first in the prioritization?

Options:

A.

So if the risk comes true the project will fail will little investment in the work.

B.

So if the risk comes true then the project manager can mitigate the risk event.

C.

So if the risk comes true they'll receive the reward as soon as possible.

D.

So if the risk comes true then there's ample time to correct the problem.

Buy Now
Questions 51

In a software implementation project, the designated business analyst (BA) has conducted all the elicitation activities and now needs to confirm the elicitation results.

What is used by the BA Professional to guide which sources of information and which results are to be compared?

Options:

A.

Information management approach

B.

Business analysis plan

C.

Elicitation activity plan

D.

Business analysis approach

Buy Now
Questions 52

While validating requirements for a software implementation project, the business analyst (BA) needs to identify scenarios that would alter the benefit delivered by a requirement.

Which of the following techniques should the BA use to identify such scenarios?

Options:

A.

Risk Analysis and Management

B.

Metrics and Key Performance Indicators

C.

Data Modeling

D.

Document Analysis

Buy Now
Questions 53

Which of the following charts is a quality control tool to show categories of defects?

Options:

A.

Pareto chart

B.

RACI chart

C.

Gantt chart

D.

RAM chart

Buy Now
Questions 54

A software company has won a contract to implement its product for a client. As part of the implementation work, a business analyst (BA) is asked to elicit information about the other client applications that will interface with the new system and provide the information graphically. The technical staff needs to understand the message interaction within the systems for key business transactions.

Which type of diagram should the BA use?

Options:

A.

Process

B.

Sequence

C.

Activity

D.

Context

Buy Now
Questions 55

Which of the following compares two or more systems, states, services, products, or things to determine the best viable choice?

Options:

A.

Benchmarking

B.

Risk Identification

C.

Risk analysis

D.

Cost-benefit analysis

Buy Now
Questions 56

Which of the following represents the duration of activities against a calendar?

Options:

A.

Scatter chart

B.

Gantt chart

C.

Pie chart

D.

Pareto chart

Buy Now
Questions 57

A business analyst (BA) has just finished verifying requirements for a new application that impacts various business processes for product setup, sales, and support. Which of the following methods should be used to validate the requirements with key stakeholders?

Options:

A.

Team review

B.

Brainstorming

C.

Joint application design

D.

Product backlog prioritization

Buy Now
Questions 58

A business analyst (BA) working on a recently implemented project is approached by the sponsor to provide artifacts that can be used organization wide for the long -term. Which of the following should the BA provide?

Options:

A.

Transition requirements document

B.

Project solution architecture

C.

High-level business requirements document

D.

Process models

Buy Now
Questions 59

A business analyst (BA) assigned to a project has been asked to implement regulatory requirements based on priority. What type of traceability relationship can the BA use to find an the solution components that need to be implemented?

Options:

A.

Satisfy

B.

Dependency

C.

Validate

D.

Derive

Buy Now
Questions 60

A business analyst (BA) is preparing for observation. A passive approach has been selected for establishing performance metrics. What should be identic for the next step?

Options:

A.

Performance measures

B.

Dependencies

C.

Participants

D.

Communication channels

Buy Now
Questions 61

An insurance company wants to increase sales by 15% and customer retention by 10% within 1 calendar year.

Various strategies to achieve this were considered and a restructure to the existing pricing model is selected to help achieve these goals.

A business analyst (BA) works with stakeholders such as actuaries, product specialists, sales staff, risk managers, and underwriters who agree to applying varying levels of discounts to customers based on:

•Total annual premium the customer has with the company (Financial worth)

•Time with the insurance company (Loyalty)

Various financial models are considered but the stakeholders agree that an initial applicable discount is determined based on the customer's overall premium:

CBAP Question 61

The percentage of the maximum possible discount available to the customer is adjusted based on time with the company:

CBAP Question 61

Which technique would the BA use to validate the desired outcomes?

Options:

A.

Business model canvas

B.

Decision analysis

C.

Key performance indicators

D.

Use cases

Buy Now
Questions 62

A business analyst (BA) is reviewing the performance results from a recent change initiative. One of the results stated, "The planned schedule expected 50% of the project to be done at milestone 6. The schedule performance index (SPI) was .87. Three project team members worked overtime to ensure that the actual schedule would align with the planned schedule."

This is an example of what type of action?

Options:

A.

Engagement

B.

Preventive

C.

Corrective

D.

Improvement

Buy Now
Questions 63

A company has a process improvement initiative that is projected to increase revenue by $150,000 USD non- compounded per year. The budgeted cost of the initiative is $200.000 and supporting the initiative will cost

$30.000 for years two and three.

What is the projected return on investment over the first 3 years?

Options:

A.

44%

B.

73%

C.

40%

D.

51%

Buy Now
Questions 64

A business unit of a transnational manufacturer wants to implement a robust process for addressing integrity- critical equipment deterioration incidents. Timely and complete resolution of such incidents is vital for the business unit’s continuous safe and profitable operation. Treating each incident involves many employees from different departments extensively collaborating and exchanging information. That information is spread across multiple systems having their access limited to particular user groups. With the current manual process, some incidents get forgotten and remain unresolved for years.

The project’s Sponsor is an Equipment Integrity and Reliability Advisor, who moved into this position from

another business unit. That business unit implemented a proprietary application to integrate the information and to assist in tracking and managing the incidents. Having a positive experience with the application, the Sponsor is suggesting to customize it and reuse in the new business unit.

The business unit’s Enterprise Architect (EA), who is responsible for assessing solution options and presenting them to executive decision makers, has a few concerns with adopting the existing application. The application uses point-to-point interfaces with other data sources whereas the business unit’s target architecture relies on a data warehouse-based integration. Moreover, the two business units use different legacy systems, as well as different front-end implementation technologies. Additionally, the existing application is monolingual, while the business unit needs user interfaces and some data to be presented in two languages. With all of this, it may be easier to build a new application from scratch than to customize the existing one. To understand which option is better, the EA asks a business analyst (BA) to define business requirements.

With the team ready to consider design options, they are reviewing the following requirement: "Appropriate stakeholders shall be timely and reliably notified on incident-related events."

What quality criteria does this requirement fail to satisfy?

Options:

A.

Consistent

B.

Complete

C.

Atomic

D.

Understandable

Buy Now
Questions 65

A business analyst (BA) is planning for an upcoming solution based on a signed contract with a client but has learned that one of the key subject matter experts is unavailable during the first half of the business analysis phase. The project has a tight timeline and firm deadline that is part of the contract. There are no substitutes for the key subject matter expert.

How should the BA proceed?

Options:

A.

Change the solution scope by removing the subject matter expert's component and obtain approval on the new scope

B.

Reduce the schedule to coincide with the subject matter expert's availability and reduce the formality for requirements

C.

Document the contract terms as a risk and adjust the contract costs to plan for the changes/rework

D.

Identify the missing stakeholder as a risk and recommend an adaptive approach for the analysis phase

Buy Now
Questions 66

Company A is a nation-wide leader in commercial demolition. Having just celebrated its 100th year of operations, the company decided to begin doing work internationally. The current system used for reporting company finances is unable to keep pace with the potential demands of doing work in geographically dispersed locations. Therefore, the company decided to replace its client-based Profit & Loss (P&L) reporting system with a more robust, web-based system. This will ensure transparency across the organization and enable better decision making.

The business analyst (BA) at Company A has recently completed several rounds of elicitation to determine the requirements for the new, web-based system. Over 1250 requirements were elicited. An initial Requirements Traceability Matrix (RTM) has been drafted, and a subset of the RTM can be seen below:

CBAP Question 66

While verifying the requirements, the BA notices that Requirement ID NFO0003 does not meet the "unambiguous" or the "testable" characteristics of requirements quality. The BA plans to re-write the requirement.

Which of the following requirements is both unambiguous and testable?

Options:

A.

"The solution shall employ a blue background."

B.

"The solution shall employ a background color blue (HEX #0000FF)."

C.

"The solution shall employ a high-contrast between background and text."

D.

"The solution shall employ a background color that is viewable to a colored-blind user."

Buy Now
Questions 67

CBAP Question 67

In order to align with the added value required from the parcel tracking solution, what would be an important requirements' category for the BA to give more focus?

Options:

A.

Transition

B.

Process

C.

Non functional

D.

Stakeholder

Buy Now
Questions 68

A business analyst (BA) works for an organization that is moving from a waterfall methodology to an agile approach. This causes new challenges and opportunities for the BA.

Which business analysis planning and monitoring element is most impacted by the organization's change?

Options:

A.

Timing of business analysis work

B.

Conflict and issue management

C.

Technology and infrastructure

D.

Solution scope

Buy Now
Questions 69

A company with a big information technology (IT) department has hired a lead business analyst (BA) to enhance its business analysis practices. The lead BA discovers that sponsors are not satisfied with project outcomes. Developers complain about incomplete, ambiguous, and changing requirements. All stakeholders, including project managers, are blaming long cycles of analysis for the delays. The business analysts, in turn, feel overwhelmed with the number of projects and frustrated by the lack of collaboration from reviewers of their deliverables. All of the evidence is anecdotal and none of the groups could strongly substantiate their opinions.

Even after dozens of reviews, some stakeholders refuse to sign off on the requirements specification documents because of a few questionable requirements. This puts the projects at risk and creates tension between the participants. What should the lead BA do first?

Options:

A.

Escalate the problem to the executive management

B.

Set limits on duration of sign-offs and the number of reviews

C.

Track approvals al the level of individual requirements

D.

Offer the stakeholders incentives to sign off documents sooner

Buy Now
Questions 70

After the new report "Customer Sales by Date" was deployed last week, the sales team is now unable to generate the previously existing report "Consolidated Sales by Customer, " which is causing customer dissatisfaction.

What could the business analyst (BA) have assessed to prevent this situation?

Options:

A.

Current state and stakeholder needs

B.

Solution assessment results

C.

Strengths, weaknesses, and threats

D.

Balanced scorecard

Buy Now
Questions 71

A financial institution engaged in mortgage lending has embarked on a business process improvement initiative to eliminate the activities that hinder growth to ultimately improve the success rate of its mortgage business. As a benchmark for identification, the institution is keen on improving any business process that has less than a 75% success rate. The institution has appointed a business analyst (BA) to review the business transactions for the processes of origination, payments, and closures, as well as identify opportunities for improvements and recommend solutions.

The BA has collected the following information over the last three months pertaining to these business processes:

•All the business processes are at their maximum capacity in terms of the current number of transactions.

•Each business process has a certain number of rejects and the reasons for rejection include documentation, verification, collateral, and funding. Funding rejects occur when the bank's customers have failed to make payment of their mortgage processing fee or mortgage closure payment.

The BA has also recommended the use of documentation checklists as a solution to eliminate the documentation rejects.

CBAP Question 71

Which of the following business processes can be identified for the process improvement initiative?

Options:

A.

Mortgage payment process

B.

Mortgage origination process

C.

Mortgage closure process

D.

Collateral verification process

Buy Now
Questions 72

A popular department store chain wants to make computer upgrades as well as conduct a major remodeling effort to increase revenue to all their 100 stores over the next 2 years. The remodeling will occur in two phases. The two phases are required at each store and can be completed in any order, but each phase must be fully completed before the next phase can begin. Phase 1 will take approximately 32 weeks and will not require a store to be temporarily closed. Phase 2 will take approximately 20 weeks and will require a store to be temporarily closed.

In order to keep inventory level and total revenue for the department store chain at an operational level, 75% of the stores must remain open to the public at all times. Against the board of director's advice, the Chief

Executive Officer (CEO) made a decision to start and complete the top 25 revenue-producing stores in the first year to get those stores remodeled and fully operational.

A business analyst (BA) has been brought in to help with planning the project and gathering requirements. Based on the CEO's executive decision, which risk tolerance attitude is the CEO exhibiting?

Options:

A.

Seeking

B.

Avoidance

C.

Mitigation

D.

Neutrality

Buy Now
Questions 73

The BA is analyzing the requirements that are represented in the Class Diagram. In addition to the diagram, the BA would like to include a separate document that has the information about the data elements to ensure a common understanding of the classes' attributes. What technique is used to define the data elements?

Options:

A.

Reviews

B.

Data Mining

C.

Glossary

D.

Data Dictionary

Buy Now
Questions 74

A business analyst (BA) has been given a defect during user acceptance testing. After analyzing the defect, the BA determines it is a change in the requirement.

What does the BA need to do to assess the change?

Options:

A.

Close the defect "working as designed"

B.

Evaluate the risk analysis and management information

C.

Perform a root cause analysis

D.

Conduct an impact analysis using traceability

Buy Now
Questions 75

A business analyst (BA) wants to estimate the potential value delivered by a set of requirements and design options by targeting a small group of stakeholders to understand their perceived value and expectations. The BA is going to organize a discussion during which feedback is collected.

Which technique will be used?

Options:

A.

Focus Group

B.

Brainstorming

C.

Survey

D.

Group interview

Buy Now
Questions 76

The technology team at a financial institution has successfully constructed a software application to be deployed as part of a digital banking strategy. A business analyst (BA) has completed a review of the current state description and now needs to evaluate the solution and determine limiting factors for value realization.

What additional input is required to perform the assessment of enterprise limitations?

Options:

A.

Operational assessment

B.

Potential value

C.

Solution performance analysis

D.

Organizational structure

Buy Now
Questions 77

You are the business analyst for your organization. You are identifying new opportunities to improve upon your existing web services. Management is open to new opportunities as long as the changes do not take more than 60 days to implement.

What type of a factor does the 60-day implementation represent?

Options:

A.

Technical constraint

B.

Schedule constraint

C.

Business constraint

D.

Assumption

Buy Now
Questions 78

Which of the following involves defining the various threats, determining the extent of vulnerabilities, and devising countermeasures against a possible attack?

Options:

A.

Qualitative risk analysis

B.

Risk analysis

C.

Risk assessment

D.

Quantitative risk analysis

Buy Now
Questions 79

Which of the following graphical presentations of a project plan is most appropriate for presenting to upper management?

Options:

A.

Pie chart

B.

Pareto Chat

C.

Critical Path Method

D.

Scatter chart

Buy Now
Questions 80

There are four inputs to the plan business analysis activities.

Which one of the following is not an input to the plan business analysis activities process?

Options:

A.

List of identified risks

B.

Organizational process assets

C.

Business analysis approach

D.

Stakeholder list, roles, and responsibilities

Buy Now
Questions 81

What requirements elicitation involves carefully selected stakeholders and subject matter experts for a short, intensive period (usually for one to a few days) to define and document the requirements for a solution?

Options:

A.

Many-to-many interviews

B.

Requirements workshop

C.

Focus group

D.

Prototyping

Buy Now
Questions 82

Which of the following roles helps assess the data requirements of a project, identifies data assets, and helps the project team complete data modeling requirements?

Options:

A.

Database analyst

B.

End user

C.

Subject matter expert

D.

Information architect

Buy Now
Questions 83

What business analysis plan defines the process to be followed in managing the solution scope and requirements?

Options:

A.

Requirements management plan

B.

Scope management plan

C.

Change management plan

D.

Project management plan

Buy Now
Questions 84

You are the business analyst for a large project in your organization. You are working with Ben to create requirements packages to present to the stakeholders, the business analyst team, and to the project manager. Ben wants to know why you're creating requirements packages.

What's the primary goal of developing a requirements package?

Options:

A.

To convey the cost, schedule, and risk information clearly

B.

To convey information clearly and in an understandable fashion

C.

To present the requirements in packages that are easy for the project team to accomplish in their project execution

D.

To help the project manager create the work breakdown structure

Buy Now
Questions 85

Which of the following meeting brings all of the potential vendors together to discuss the statement of work and the request for proposal?

Options:

A.

Contract bidding meeting

B.

Status meeting

C.

Qualified vendors meeting

D.

Bidders conference

Buy Now
Questions 86

You are completing the prepare for elicitation process for an identified problem in your organization. The prepare for elicitation process requires three inputs for this process.

Which one of the following is not an input that will help you prepare for the elicitation activities?

Options:

A.

Stakeholder list

B.

Stakeholder concerns

C.

Business need

D.

Solution scope

Buy Now
Questions 87

is a process to determine the completeness of the project work and to gain the customer's acceptance to move the project forward.

Options:

A.

Phase gate review

B.

Inspection of key results

C.

Verify scope

D.

Quality control

Buy Now
Questions 88

The RGQ Organization utilizes a change log.

What is a change log?

Options:

A.

It is a document that records all change requests for the project.

B.

It is a document that tracks all unauthorized changes to the project solution.

C.

It is a document that tracks all characteristics and status of changes that have been received.

D.

It is a document that tracks the changes that have been received, including their implementation to the project solution.

Buy Now
Questions 89

You are the business analyst for your organization and you are completing the manage requirements traceability process. You are tracking the requirements to determine how the requirements are interrelated with one another and with the actual delivery of the project scope.

There are actually three reasons why the business analyst should trace requirements.

Which one of the following is not one of the three reasons why trace requirements is useful?

Options:

A.

Impact analysis

B.

Requirements coverage

C.

Requirements allocation

D.

Quality control

Buy Now
Questions 90

You are the business analyst for your organization and are leading a presentation about an identified problem. This presentation will help the stakeholders to understand the problem and it will help you when you begin to elicit requirements from the stakeholders.

Which type of learner learns best through the presentation of models?

Options:

A.

Visual learners

B.

Auditory learners

C.

Kinesthetic learners

D.

Communication model learners

Buy Now
Questions 91

Gary is the business analyst for his organization and he is preparing a presentation about the requirements for a large software development project.

Before Gary makes the presentation what should he do as part of his preparation for the presentation?

Options:

A.

Determine an appropriate format for the presentation.

B.

Confirm that he has the authority to host the presentation.

C.

Confirm that the stakeholders have signed off on the requirements.

D.

Hire a scribe to keep the minutes of the meeting.

Buy Now
Questions 92

You are the business analyst for your organization and you are completing the verify requirements process. There are eight characteristics each requirement should have: cohesive, complete, consistent, correct, and feasible.

Which one of the following four is not a characteristic of a requirement?

Options:

A.

Functional

B.

Modifiable

C.

Unambiguous

D.

Testable

Buy Now
Questions 93

Henry is the business analyst for the UUH Organization. Currently Henry is working on several work products as part of the requirements development process. He may need to share these work products with the stakeholders.

Which of the following is not an example of a work product?

Options:

A.

Requirements documentation

B.

Interview questions and notes

C.

Meeting agendas and minutes

D.

Presentation slides

Buy Now
Questions 94

You are completing enterprise analysis. Management has asked you to create a document that will help them create a go/no go decision to invest and more forward with a proposed project.

What document does management want you to create?

Options:

A.

Feasibility study

B.

Project scope

C.

Solution scope

D.

Business case

Buy Now
Questions 95

Which of the following phases is the first step towards creating a business continuity plan?

Options:

A.

Business Continuity Plan Development

B.

Scope and Plan Initiation

C.

Business Impact Assessment

D.

Plan Approval and Implementation

Buy Now
Questions 96

A business analyst (BA) has defined a business analysis approach and presented the documents to the sponsors, the senior executives, the domain experts, the project manager and the head of technology, to obtain agreement from all. At this juncture, the prefect manager objected to some of the estimates determined m the budget and refused to agree with the estimates. Which guideline or tool, if followed by the BA. would have helped in avoiding such disagreements?

Options:

A.

Requirements Classification Schema

B.

Stakeholder Engagement Approach

C.

Risk Analysis and Management

D.

Business Analysis Performance Assessment

Buy Now
Questions 97

A business analyst (BA) finds that the solution service level agreement (SLA) cannot be met m one out of five identified scenarios. is there 4 a dependency on a requirement which is a part of a future release. How should the BA approach the solution limitation?

Options:

A.

Assess the impact on the business operations

B.

Increase the scope and include the dependent requirement

C.

Modify the SLA

D.

Change the business process

Buy Now
Questions 98

A large insurance company wants to buy a new claims processing system or upgrade one of its two existing system. Each year the claims department is given a $3.5 million budget to spend. Time is of the essence since there are tome regulatory charges that will be coming the following year that will require several features that currently neither one of the two claims System currently support.

There are eight stakeholders involved in this initiative. There are local to where the claim system is managed, while five are located across the country. The business analyst (BA) struggled to get all stakeholders to agree on the desired features but ultimately got agreement on ten identified key features for the new claims system. The BA was able to build a current state and future state process model which included all ten key features.

System a processes 75% of the company's claims. It is 5 years old and the claim processors love it because it is easy to use. However, it must go offline for two hours each day. The code is very module so it does have flexibility to be modified. To upgrade system A to have all ten features it would cost $5 million. System A would be at capacity if it were to process all of the company's claims.

System B process 25% of the company's claims. It is an older mainframe system, but rarely goes offline. It could easily handle double the number of claims that system A processes. However, it has a lot of legacy code and would cost $6 million to upgrade.

Both systems have some of the desired key features. But neither system has all ten. The cost to buy a new system would be $7 million.

Below is the estimated cost for each feature in priority order.

CBAP Question 98

During elicitation the BA must understand the non-functional requirements. What nonfunctional requirement does System B support over System A?

Options:

A.

Usability

B.

Compatibility

C.

Scalability

D.

Compliance

Buy Now
Questions 99

A Business Analyst (BA) is tasked with presenting the requirements for an auto insurance product to domain and implementation subject matter experts (SMEs). What requirements viewpoints should be used by the BA?

Options:

A.

Business Process Model

B.

Organization Model

C.

Logical Data Model

D.

Scope Model

Buy Now
Questions 100

In a risk assessment exercise of a software implementation program, the business analyst (BA) has successfully computed the probability of occurrence (POC) and the cost of impact for each of the identified risks as follows:

CBAP Question 100

Which of the following will have the highest negative impact to value?

Options:

A.

Natural disasters

B.

Power surges

C.

Human errors

D.

System security

Buy Now
Questions 101

A business analyst (BA) is working on improving solution performance and increasing value. The BA discovers that a set of interfaces and activities do not contribute to the final product either directly or indirectly What should the BA recommend?

Options:

A.

Provide a single solution for stakeholders thus reducing the cost of implementation

B.

Propose an organizational change to automate the work people perform

C.

Remove or minimize interfaces and activities that do not provide value to the final product

D.

Retire the current solution as it is not fulfilling the need for which it was created

Buy Now
Questions 102

Before the start of a large, cross functional change effort, the team of Business analysts (BAs) assigned decided they need something to help them ensure requirements collectively support one another and do not conflict. What option would provide the consistency they are looking for?

Options:

A.

Process modeling

B.

Functional decomposition

C.

plate Architecture

D.

Checklist

Buy Now
Questions 103

A business analyst (BA) has completed requirements elicitation and modeling on a project to implement a new case management system. During analysis of the requirements, the BA notices that one of the requirements appears to be in conflict with the company's case management policies. What should the BA do?

Options:

A.

Request modification to the polices and identify the changes as an assumption and a dependency

B.

Create a requirement to indicate the change to the current policies and update the information in the models

C.

Modify the requirements to adhere to the existing policies and note the change in the models

D.

Identify the policies as a potential constraint and review with management

Buy Now
Questions 104

A company wants to develop a product roadmap to guide future development efforts. The product owner asks a business analyst IBA) to lead the analysis effort. Feature suggestions have been compiled from customer support calls. Which of the following should the BA do first?

Options:

A.

Compare the Implementation costs of each feature

B.

Determine the value of each feature

C.

Prioritize the features in the backlog

D.

Confirm the feature requests

Buy Now
Questions 105

A company is reconfiguring its business processes to improve the quality of its products and lower operational costs. This includes defining metrics that will be used to evaluate the effectiveness of future change strategy. Which of the following techniques achieves this goal?

Options:

A.

Decision modeling

B.

financial analysis

C.

Business case

D.

Balanced storecard

Buy Now
Questions 106

A business analyst (BA) is preparing a governance approach. The BA is trying to define the approval process. Which factors should the BA consider?

Options:

A.

The organizational culture and type of information being approved

B.

The associated risks of foregoing or delaying an approval

C.

The formality and rigor of the prioritization process

D.

The solution performance measures

Buy Now
Questions 107

You are the business analyst for your organization. On your current project you'll be using the change-driven approach for defining requirements and gathering feedback.

Which of the following statements best describes the change-driven approach?

Options:

A.

The change-driven approach favors defining requirements through experimentation.

B.

The change-driven approach does not define the requirements until after a solution for the problem has been identified.

C.

The change-driven approach favors defining requirements standardized templates.

D.

The change-driven approach favors defining requirements through team interaction.

Buy Now
Questions 108

Holly is the business analyst for her organization. Management has asked Holly to create a document that will define solution alternatives and how each identified solution may provide an expected business benefit to meet the identified business need. Management has asked Holly to provide data and statistics in this document to support her claims and findings.

What type of document is management asking Holly to create?

Options:

A.

Feasibility study

B.

Vision statement

C.

Project scope statement

D.

Current state assessment

Buy Now
Questions 109

A business analyst (BA) asks participants in a workshop to write down their ideas about the feature being built on sticky notes place them on the wan and then group the ideas into similar themes. The BA is using, this technique to:

Options:

A.

prioritize requirements.

B.

prepare for requirements elicitation.

C.

identify organizational capabilities.

D.

manage stakeholder collaboration.

Buy Now
Questions 110

Mark is the business analyst for his organization. He is working with the solution development team and he believes that the team does not want to implement a certain portion of the requirements. The team is expressing the difficulty of the requirements and how it will be extremely challenging to complete. When Mark asks about a similar project that the team completed, they insist that this is a different type of requirements though Mark believes that it is not.

What is the solution development team appearing to do to the requirements?

Options:

A.

Change the prioritization of the requirements based on the past project.

B.

Change the prioritization of the requirements based on overstated complexity of the project work.

C.

Get the requirements removed from the project scope.

D.

Have the business analyst report the difficulty of the project work to the project customer.

Buy Now
Questions 111

Gina has been asked to provide decision analysis for her solution scope.

Which one of the following best describes the decision analysis technique?

Options:

A.

Assessed to support benefit management, measurement, and reporting.

B.

Used to assess potential risks that may impact the solution and the cost and benefits associated with it.

C.

Forecasts the size of the investment required to deploy and operate the proposed solution.

D.

Cost-benefit analysis compares the cost of implementing a solution against the benefits gained. Financial analysis includes the use of financial models that estimate the market value of an organizational asset.

Buy Now
Questions 112

Robert is the business analyst for his organization and he's working with several stakeholders to identify the business need for an opportunity. Robert needs to identify the stakeholder that will be responsible for authorizing the actions needed in order to meet the identified business need.

Which stakeholder does Robert need to identify?

Options:

A.

Sponsor

B.

Customer

C.

Implementation Subject Matter Expert

D.

Regulator

Buy Now
Questions 113

You are the business analyst for your organization and you are working with Bill on creating a model. Bill is a little confused about all the different things a model can do for the stakeholders.

You explain to Bill that a model can do all of the following except for which one?

Options:

A.

Define the risk and reward for the requirements

B.

Categorize and create hierarchies of items

C.

Define boundaries for business domains

D.

Show business logic

Buy Now
Questions 114

A business analyst (BA) is working on an initiative to decommission a legacy system and has discovered the requirement ‘’Ability to view policies created m the legacy system for a period of 6 months. ’’How should the BA classify the requirement based on the requirements classification schema?

Options:

A.

Functional Requirement

B.

Transition Requirement

C.

Non-Functional Requirement

D.

Business Requirement

Buy Now
Questions 115

A business analyst (BA) conducts a Business rules analysts exercise to identity the organizational rules constraining the project in addition to existing regulations and contracts. what else does the BA check?

Options:

A.

Backlogs

B.

Policies

C.

Business case

D.

Permissions matrix

Buy Now
Questions 116

A health insurance provider undertakes enhancements to its mobile application platform and finalizes the following capabilities as part of the scope of the next release:

I. Ability to integrate online maps and global positioning system (GPS) technology with the mobile application In real time to display location of service providers in the subscriber's vicinity that participate in the subscriber's plan network.

II. Ability for the subscriber to lookup the service providers by specifying either a postal code or a search area radius in miles.

III. Ability for the subscriber to initiate the download of fee information for one or more service providers in a single request.

Through requirements workshops the business analyst elicits the following detailed business requirements:

1. The company's mobile application platform must support real time integrate with the following third party systems:

A GPS System

B. Postal Code Validation

What is the appropriate model type to assist the stakeholders in testing the performance and visual aspects of requirements 3 through 11?

Options:

A.

Process Model

B.

Concept Model

C.

Usability Prototype

D.

Functional Prototype

Buy Now
Questions 117

You are the business analyst for your organization and are beginning the requirements analysis processes.

Which one of the following statements best describes the requirements analysis processes?

Options:

A.

It ensures that analysis and implementation efforts focus on the most critical requirements.

B.

It covers the definition of stakeholder requirements, which describe what a solution must be capable of doing.

C.

It defines all of the work, and only the required work, to complete the project objectives.

D.

It is conformity to requirements and a fitness for use.

Buy Now
Questions 118

Wanda is the business analyst for her organization and she is currently working on the specify and model requirements process. One of the elements of this process is the documentation of the textual requirements.

Wanda must describe the capabilities of the solution, any conditions that must exist for the requirements to operate, and what third component of the textual requirement?

Options:

A.

Any constraints that may prevent the solution from fulfilling the requirement

B.

Write in the active voice

C.

Describe a situation or problem

D.

Express only one requirement at a time

Buy Now
Questions 119

Martha is observing Gary complete several activities as part of her requirements elicitation process. Martha is simply observing the steps Gary takes to complete his work and she is taking notes. In this instance Martha does not ask Gary any questions.

What type of observation technique is Martha completing?

Options:

A.

Shadowing

B.

Active

C.

Passive

D.

Usage consideration

Buy Now
Questions 120

Your organization uses the MoSCoW approach to requirements prioritization.

What does MoSCoW mean?

Options:

A.

Must, Should, Could, Would

B.

Must, Should, Could, Won't

C.

Mission, Schedule, Cost, Willingness

D.

Must not, Should not, Could not, Will not

Buy Now
Questions 121

A national branch of a global company is struggling to improve business processes of its Public and Government Affairs (PGA) department. To work with external stakeholders effectively, PGA employees need to collect, manage, and exchange a vast amount of information. Complex cases involve collaboration of many employees from different departments. The ability to share information and to coordinate corresponding activities is crucial for the company's growth plans. Their current tools and practices do not serve the purpose well. The existing system, which was deployed a couple of years ago, has only a few active users. The majority of PGA employees avoid using it because the system is hard to use and lacks needed functionality. Consequently, available information is mostly unstructured and stored either locally or on a shared network drive. Some of the information exists only in a paper form.

The branch's PGA head, who sponsors the project, wants to implement a configurable solution that two other branches successfully deployed several months ago. Both deployments were done by three solution

consultants, who will be available to assist in the project. They will be responsible for tailoring the solution to PGA needs, as well as for training the PGA staff. With their help, the sponsor plans to complete the project in approximately three months.

The solution consultants reside in another country 7 hours ahead of the rest of the project team. They will be available part-time, but are planning two one-week long trips to the PGA central office to conduct initial training and to participate in the final deployment of the system into production. The consultants, in turn, expect a business analyst (BA) to assist in collecting necessary data and defining customization requirements.

What should define the timing of business analysis work in this project?

Options:

A.

Buy-in of the proposed solution

B.

Approach used by the previous deployments

C.

Availability of solution consultants

D.

Overall project schedule

Buy Now
Questions 122

A solution implemented three months ago has decreased performance as the volume of transactions has increased. A business analyst (BA) is tasked with analyzing the performance of the application and providing recommendations.

What actions does the BA need to take?

Options:

A.

Develop new performance metrics

B.

Complete a decision analysis

C.

Perform a root cause analysis

D.

Re-analyze the current performance metrics

Buy Now
Questions 123

A major manufacturer of popular beverages has appointed a local distributor to serve a specific territory. The demand for the beverages has a pronounced seasonal pattern. The distributor performs well overall, but is repeatedly unable to keep up with fulfilling many customer orders during peak demand periods. The distributor's current delivery capability is stretched to deliver 60 tons of merchandise per day whereas the season's peak demand periods need a daily delivery capability of up to 100 tons.

The distributor is under pressure to fully meet the year-round market demand in order to stay in business. The distributor's management wants to identify and consider more cost-effective options as resorting to adding more trucks and drivers would not be economically feasible.

A business analyst (BA) has spent several days observing and measuring the warehouse activities to understand the situation and to gain insights into possible solutions. The delivery workflow is a four-step process: (1) picking the orders and assembling them on trays, (2) bringing the trays to the loading bay, (3) loading the orders into trucks, and (4) delivering the orders to customers. As the following table illustrates, overall performance depends is dependent on five major resources: (1) the workers who pick the orders and load them into trucks, (2) the tallyers who check the orders, (3) the drivers, (4) the trucks, and (5) eight loading bays (LBs).

CBAP Question 123

If the driver's average throughput is 0.6 tons/hour, how many hours per day would 15 drivers have to work to deliver 100 tons of merchandise?

Options:

A.

12

B.

9

C.

10

D.

11

Buy Now
Questions 124

Company A is a nation-wide leader in commercial demolition. Having just celebrated its 100th year of operations, the company decided to begin doing work internationally. The current system used for reporting company finances is unable to keep pace with the potential demands of doing work in geographically dispersed locations. Therefore, the company decided to replace its client-based Profit & Loss (P&L) reporting system with a more robust, web-based system. This will ensure transparency across the organization and enable better decision making.

The business analyst (BA) at Company A has recently completed several rounds of elicitation to determine the requirements for the new, web-based system. Over 1250 requirements were elicited. An initial Requirements Traceability Matrix (RTM) has been drafted, and a subset of the RTM can be seen below:

CBAP Question 124

The BA will create a Data Model to meet which requirement?

Options:

A.

Requirement ID F-R0002

B.

Requirement ID FE10001

C.

Requirement ID NFP0002

D.

Requirement ID F-R0003

Buy Now
Questions 125

As part of identifying an enterprise's capability to adopt a potential solution, a business analyst (BA) is reviewing existing processes and tools within the enterprise for their ability to adapt to a new solution.

Which of the following assessments is the BA performing?

Options:

A.

Stakeholder

B.

Enterprise

C.

Organizational

D.

Operational

Buy Now
Questions 126

A non-profit utility company has 900 employees, a majority of whom are hourly employees and must track their time using a paper based process A few years ago, the Director of Human Resources purchased a software system to eliminate the current paper-based time reporting process. No requirements specific to the utility company were defined prior to the purchase. A team was formed to implement the software During implementation process, the team discovered the software lacked functionality and was not robust enough to support the general ledger requirements The company stopped the effort and incurred a $500,000 USD loss on the cost of the software.

This year, the Director of Finance requested that a team investigate the current paper based time reporting process and recommend solutions. The Director of Finance feels that the Director of Human Resources must be involved as a critical stakeholder. The Director of Human Resources is still bitter about the last effort because the process stopped'.

During a brainstorming session on improvement opportunities, the Director of Human Resources repeatedly interrupts the group and states why the proposed ideas will not work.

Which approach should the business analyst (BA) take to refocus the group?

Options:

A.

Continue the activity with the group and provide a report

B.

Reschedule the session without the Director of Human Resources

C.

Pause the activity and reiterate the rules to the entire group

D.

Ask the Director of Human Resources to observe instead of participate

Buy Now
Questions 127

An organization implements a solution to increase the efficiency of its internal processes. The business analyst (BA) felt that the success of the solution is tied to the organizational structure and confirmed that the solution conforms to the organizational hierarchy. After the solution rolled out, the solution was not widely adopted among stakeholders and some features were not being utilized.

Which aspect of the organizational structure did the BA fail to consider?

Options:

A.

Reporting needs

B.

Manager ratios

C.

Informal relationships

D.

Structural complexity

Buy Now
Questions 128

An insurance company wants to increase sales by 15% and customer retention by 10% within 1 calendar year.

Various strategies to achieve this were considered and a restructure to the existing pricing model is selected to help achieve these goals.

A business analyst (BA) works with stakeholders such as actuaries, product specialists, sales staff, risk managers, and underwriters who agree to applying varying levels of discounts to customers based on:

•Total annual premium the customer has with the company (Financial worth)

•Time with the insurance company (Loyalty)

Various financial models are considered but the stakeholders agree that an initial applicable discount is determined based on the customer's overall premium:

CBAP Question 128

The percentage of the maximum possible discount available to the customer is adjusted based on time with the company:

CBAP Question 128

What did the BA create to ensure that everyone who needed to be included had been?

Options:

A.

Onion diagram

B.

Concept model

C.

Capability diagram

D.

Context model

Buy Now
Questions 129

The business analyst (BA) is preparing to determine the impact of various risks associated with the business analysis effort currently underway.

Which of the following would the BA use as an input into the assessment of risk?

Options:

A.

Defined change strategy

B.

Analysis of potential value of the recommended solution

C.

List of prioritized requirements

D.

Unconfirmed results of elicitation activities

Buy Now
Questions 130

You are preparing the business case for a proposed solution in your organization. You need to identify several components for the business case including an assessment of the risks the solution may contain.

Which one of the following is the best definition of a risk as it pertains to the business case?

Options:

A.

Risk is an uncertain event or condition that may have both positive and negative affects on the solution.

B.

Risk is an uncertain event that can cause the organization to lose more monies than it invests in the solution.

C.

Risk is a potential event that can cause the solution to fail.

D.

Risks are threats to the organization's success.

Buy Now
Questions 131

A software development company is in the process of creating a new product for their customer base. It has been several years since such a project has been initiated and the organization has created a new team to own and develop the product. The project team will be evaluated by the successful adoption of the product, which will be developed over the next 12 months.

The team's business analyst (BA) has analyzed the current state in partnership with the product owner and has been meeting with senior management to identify the goals that need to be attained. A broad view of the business has been analyzed in order to have an understanding of how the company is currently providing value to its customer base.

After the BA completed the initial analysis, the information is reviewed with leadership. At this point in the project, what will the BA be presenting?

Options:

A.

Project timeline

B.

Project deliverables

C.

Resource staffing

D.

Expected benefits

Buy Now
Questions 132

A software development company is in the process of creating a new product for their customer base. It has been several years since such a project has been initiated and the organization has created a new team to own and develop the product. The project team will be evaluated by the successful adoption of the product, which will be developed over the next 12 months.

The team's business analyst (BA) has analyzed the current state in partnership with the product owner and has been meeting with senior management to identify the goals that need to be attained. A broad view of the business has been analyzed in order to have an understanding of how the company is currently providing value to its customer base.

What has the BA evaluated to help determine value of the project?

Options:

A.

Internal assets

B.

External influencers

C.

Change strategy

D.

Business architecture

Buy Now
Questions 133

An organization Is trying to streamline its current processes to improve performance and reduce costs. A business analyst (BA) conducted a process improvement workshop and identified the following issues as the top three items to be addressed:

1: There are multiple teams to define systems, functionality, and content in many instances, multiple teams are defining the same functionalities while other functionalities are not being defined at all leading to unclear understanding of business requirements

2: Product specification forms are published each year. A comparison tool is used to evaluate specification differences between yearly releases, but does not adequately identify changes between versions and needs to be improved.

3: Training consists of a new team member shadowing a seasoned team member. There are no written training materials or formal training sources therefore training is inconsistent and not meeting the needs of the organization.

Which stakeholders would the BA interview to determine the changes needed to the comparison tool?

Options:

A.

Regulator and Operational Support Manager

B.

Implementation Subject Matter Expert and Tester

C.

Domain Subject Matter Expert and End User

D.

Project Manager and Project Sponsor

Buy Now
Questions 134

In a requirements management effort, the business analyst (BA) has reviewed all the requirements and has completed assessing the various impacts of changes to some of the requirements. The BA is planning to share the impact of the changes to the stakeholders and obtain a consensus in resolution of some of the changes. Which technique will help the Ba obtain a resolution on the impact of the requirement changes?

Options:

A.

Focus groups

B.

Workshops

C.

Interviews

D.

Surveys

Buy Now
Questions 135

Herb is the business analyst for the HYY Organization. As Herb is completing the organize requirements process, he recognizes that requirements typically need to answer one QUESTION NO: for identification.

What is the one interrogative that requirements should answer?

Options:

A.

What

B.

When

C.

Why

D.

How

Buy Now
Questions 136

You are the business analyst for your organization and are trying to determine the best solution for an identified problem. You have determined that you could create a software solution using inhouse resources for

$65,000 and with an ongoing support of $5,600 per month. A vendor offers you a quote that they can create the software for $49,000 with an ongoing support of $6,100 per month.

Which solution should you choose?

Options:

A.

Create the software if you'll keep the solution less than 32 months.

B.

Create the software if you'll use the solution longer than 32 months.

C.

There is not enough information to determine which solution is financially better.

D.

Buy from the vendor if you'll keep the solution longer than 32 months.

Buy Now
Questions 137

One of the processes within requirements analysis is to prioritize requirements.

As a business analyst why would you ever want to prioritize requirements?

Options:

A.

You may need to determine the cost of each requirement.

B.

You may need to determine the schedule for each requirement.

C.

You may need to determine which requirements are most critical so the analysis and implementation efforts focus on the most critical requirements.

D.

You may need to determine which requirements are most critical so additional risk analysis can be completed on those requirements.

Buy Now
Questions 138

You have identified a task in your task list that cannot be completed until the inspector for the project signs off on the initial deliverables.

The inspector's signoff on the initial deliverables is called what?

Options:

A.

Assumption

B.

Dependency

C.

Milestone

D.

Constraint

Buy Now
Questions 139

A company with a big information technology (IT) department has hired a lead business analyst (BA) to enhance its business analysis practices. The lead BA discovers that sponsors are not satisfied with project outcomes. Developers complain about incomplete, ambiguous, and changing requirements. All stakeholders, including project managers, are blaming long cycles of analysis for the delays. The business analysts, in turn, feel overwhelmed with the number of projects and frustrated by the lack of collaboration from reviewers of their deliverables. All of the evidence is anecdotal and none of the groups could strongly substantiate their opinions.

The lead BA wants the BAs to report anticipated and actual completion dates for their deliverables, as well as the time spent on planned and unplanned activities. What is the lead BA trying to do by analyzing the results of such measurements?

Options:

A.

Identify typical missing or wasteful activities

B.

Ensure even workloads of the BA

C.

Establish an equitable compensation system

D.

Motivate the BA to work belter

Buy Now
Questions 140

The BA Is finalizing the definition of the requirements architecture by understanding how requirements relate to each other. A key component that must be apparent in all three diagrams is that none of the requirements be linked in different or conflicting ways. What relationship quality criterion does this represent?

Options:

A.

Unambiguous

B.

Correct

C.

Necessary

D.

Defined

Buy Now
Questions 141

A business analyst (BA) has a meeting next week with the project sponsor to ensure that the requirements align with the objective of the project. Prior to the meeting, the BA must ensure that the requirements are:

Options:

A.

parametric, analogous, and decomposed

B.

atomic, feasible and testable

C.

predictive, diagnostic, and descriptive

D.

correct, capable, and strategic

Buy Now
Questions 142

A business analyst (BA) is preparing a requirement package for access management system. A state diagram foe entity 'User* has been prepared. The BA wants to check the completeness of requirements by comparing different models. Which diagram should be used with a state diagram to verity that all functions are defined to work with entity "User" for the different roles?

Options:

A.

Sequence diagram

B.

Functional diagram

C.

Use case diagram

D.

Data flow diagram

Buy Now
Questions 143

A corporation is experiencing poor financial performance and needs to change many aspects of its business strategy in coder to become solvent again. A business analyst (BA) is conducting a feasibility analysis and analyzing resources required. The BA has identified the existing resources, the resources that need to be increased, and the required additional capabilities. What is the other dimension this analysis should indicate?

Options:

A.

The new resources to be developed

B.

The new financial performance metrics

C.

The enterprise readiness agreement

D.

The timeline for instituting the change

Buy Now
Questions 144

During the testing phase, a new requirement surfaced and the stakeholder asked the developer to modify the code without informing the Business analyst (BA). The BA became aware of the new functionality after a defect was raised against another component of the design. The BA can keep this situation from occurring in the future by creating a:

Options:

A.

risk strategy.

B.

prioritization approach.

C.

change control process.

D.

stakeholder engagement plan.

Buy Now
Questions 145

CBAP Question 145

The table illustrate the statement of cash flower for a courier company for the last fiscal year:

Due to aggressive market competition the management of the company performed a strategy review and based on their0-findings and the current market conditions, they came up with strategic and tactical changes in order to keep a competitive market position.

In order to strength customer retention strategies through a new competitive advantage, the company is considering implementing a live parcel tracking system. The added value will be that the customers may determine the exact location on of the parcel whether it is in a warehouse, crossing the ocean through an overseas the exact location of the parcel whether it is in a warehouse, crossing the ocean through an overseas the ship, or travelling in a delivery truck at any time. The system tracks the location of the parcel by tracking the vehicle in which it is contained. However, for a group of old delivery trucks, it was noticed that the engine sound and vibration disturbed the tracking signal and caused of management would like to sell these vehicles and replace them with newer ones, the Chief Financial Officer (CFO) was strongly against that approach. The CFO argued that instead of hanging tracking devices on the trucks body they can have the truck drivers manually send the truck send the truck location from a hand-held mobile device every 20 minutes.

What could the business analyst (BA) do to gain consensus between the CFO and other Management?

Options:

A.

Calculate the costs incurred by each option

B.

Recommend and present a completely new option

C.

Compare each option against an industry benchmark

D.

Estimate the potential value delivered by each option

Buy Now
Questions 146

The business analyst (BA) works in a global company and the majority of stakeholders are located in different countries The BA already explained the core requirements during the initial meetings. However due to the time zone differences it has been cumbersome to organize further meetings. What method should the BA use so the stakeholders can review the document before final approval?

Options:

A.

Group collaboration

B.

Brainstorming

C.

E-mail

D.

Collaborative games

Buy Now
Questions 147

A business analyst (BA) on a project is in the process of validating requirements and finds that there is a high degree of uncertainty related 10 one of the assumptions being true. The BA adds the assumption to the risk register and performs a fun risk analysis to handle this situation. What type of strategy is in place if the organization is risk-averse?

Options:

A.

Acceptance

B.

Transfer

C.

Avoidance

D.

Mitigation

Buy Now
Questions 148

A business analyst (BA) had identified redundancy in the process for the first contact resolution for customer issues: currently two separate a visions handle this task. A new solution identifies a single point of contact that will eliminate the redundancy. What can the BA do to highlight the required changes to the structure?

Options:

A.

Current state description

B.

Policies and procedures

C.

Business capability analysis

D.

Organizational modeling

Buy Now
Questions 149

Following a recent, successful deployment a business analyst (BA) has noticed that several of the requirements are candidates for reuse in multiple, upcoming change initiatives. Which type of requirement is a potential candidate for re-use?

Options:

A.

Transition requirements

B.

Stakeholder requirements

C.

Business requirements

D.

Non-Functional requirements

Buy Now
Exam Code: CBAP
Exam Name: Certified Business Analysis Professional
Last Update: Mar 13, 2025
Questions: 497

PDF + Testing Engine

$57.75  $164.99

Testing Engine

$43.75  $124.99
buy now CBAP testing engine

PDF (Q&A)

$36.75  $104.99
buy now CBAP pdf
dumpsmate guaranteed to pass