C_TSCM42_67 SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 Questions and Answers

Questions 4

In SAP ECC, you want to map an in-house production process for general warehouse production. The fields in the area of the lot size-dependent in-house production time are to be populated when the material master for the final product is created. These fields can be maintained by updating from the scheduling result for the associated routing. You now think that there could be significant changes to the production times in the routing and decide against updating the material master. What problem could this lead to?

Options:

A.

Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.

B.

Requirements planning runs up against an exception message in basic dates scheduling because the material master parameters do not match the scheduling result from the routing.

C.

In the course of basic dates scheduling with requirements planning, dependent requirements request the components from the bill of materials at the wrong times.

D.

Lead time scheduling, which occurs by the time that a planned order is converted into a production order (at the latest), cannot take place on the basis of incorrect basic dates.

Buy Now
Questions 5

What master data do you need for material replenishment using the KANBAN procedure? (Choose two)

Options:

A.

Production supply area

B.

Rate routing

C.

Product cost collector

D.

Control cycle

E.

Production version

Buy Now
Questions 6

Which Customizing element controls the determination of planned costs in production orders?

Options:

A.

Accounting type

B.

Costing variant

C.

Calculation procedure

D.

Settlement profile

Buy Now
Questions 7

Where in the SAP ECC system can you define production versions?

Options:

A.

In the material master

B.

In the routing

C.

In the bill of material

D.

In the work center

Buy Now
Questions 8

You select the master data for production orders via production versions.

Which information is contained in a production version?

Options:

A.

The explosion dates for the routing and BOM

B.

The routing and BOM alternatives to be used

C.

The default order type to be used

D.

The control parameters for selecting routings and BOM

Buy Now
Questions 9

Where can you define the default storage location for the material component of a production order? (Choose three)

Options:

A.

Routing

B.

Production supply area of a work center

C.

BOM header (product)

D.

Production version (product)

E.

Material master (component)

Buy Now
Questions 10

Which of the following are properties of ECC Multi-Site Planning? (Choose two.)

Options:

A.

Both withdrawal from alternative plant and withdrawal from another plant are defined via special procurement keys.

B.

The use of scope of planning (cross-plant total planning) is mandatory for Multi-Site Planning.

C.

When using one-step stock transfer posting, transfer stock is created in the receiving plant.

D.

When using two-step stock transport order with delivery, the receiving plant is defined as a customer.

Buy Now
Questions 11

From what point can you no longer use the Read PP master data in the production order?

Options:

A.

After printing the order papers.

B.

After the first posting of goods movements or confirmation.

C.

From the release of the production order.

D.

After assigning the confirmed quantity of a material component due to carrying out a material availability check.

Buy Now
Questions 12

Which option for selecting a routing exists when you create a production order?

Options:

A.

Automatic selection of a reference operation set

B.

Manual selection based on settings in the order type-dependent parameters

C.

Automatic selection based on the selection ID in the material master

D.

Manual selection based on the list of routings maintained in the material master

Buy Now
Questions 13

The stock/requirements list for a finished product contains only one sales order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date for the fixed planned order is set to a later date than the one for the sales order.

However, a corresponding rescheduling exception message does not appear.

What could be the reasons? (Choose two)

Options:

A.

The delta between the availability dates falls within the tolerance window defined in Customizing.

B.

The fixed planned order is outside the rescheduling horizon.

C.

Requirements planning has not been carried out.

D.

The MRP elements are linked via fixed pegging.

Buy Now
Questions 14

What do you have to consider when you use SAP ECC long-term planning (LTP)? (Choose two)

Options:

A.

A planning scenario must be released before it can be used in LTP.

B.

Reorder point planned materials can be included in LTP.

C.

LTP focuses on the operational planning of important components.

D.

LTP creates purchase requisitions for external procurement.

Buy Now
Questions 15

Which of the following statements is true for the ATP (available to promise) availability check in SAP ECC that is triggered from a customer order?

Options:

A.

The ATP check does not confirm against stocks and receipts, it checks consumption against planning requirements.

B.

An availability check by means of ATP creates fixed links between customer orders and their confirmed receipts.

C.

The ATP quantity is the quantity still available that can be used to confirm incoming customer orders.

D.

If the ATP check establishes non-availability, it checks whether it is still possible to procure or produce in time.

Buy Now
Exam Code: C_TSCM42_67
Exam Name: SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7
Last Update: Feb 19, 2024
Questions: 106