C_TS422_2023 SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing Questions and Answers

Questions 4

Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.

Options:

A.

Work center

B.

Material master

C.

Routing

D.

Production version

Buy Now
Questions 5

Why would you use phantom assemblies?

Note: There are 3 correct answers to this question.

Options:

A.

To simplify the structure of bills of material

B.

To reduce the number of changes required in bills of material

C.

To reduce the number of material masters

D.

To make the assignment of components easier

E.

To increase the number of planning levels

Buy Now
Questions 6

During production order creation several valid production versions are found. How does the system choose the production version?

Options:

A.

Alphanumeric or quota arrangement

B.

Planned order or material number

C.

Validity period or sales order

D.

Lot size or material cost

Buy Now
Questions 7

Which stard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

Options:

A.

Variablesize item

B.

Work item

C.

Preliminary item

D.

WBS item

Buy Now
Questions 8

Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

Options:

A.

Post the goods receipt for the finished product.

B.

Reduce run schedule quantities.

C.

Post production costs to the planned order.

D.

Update statistics for the Business Information Warehouse.

E.

Create associated capacity requirements.

Buy Now
Questions 9

How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

Options:

A.

By material type

B.

By plant

C.

By period

D.

By material status

Buy Now
Questions 10

In documentation for MRP in Advanced Planning you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order?

Options:

A.

MRP assigns the capacity requirements automatically after the last scheduled operation for each work center.

B.

MRP creates the capacity requirements without considering existing load on the work centers.

C.

MRP creates the capacity requirements at the earliest possible time.

D.

MRP assigns the capacity requirements automatically to work centers with the earliest available capacity.

Buy Now
Questions 11

What data can you maintain in the subitems of a bill of material (BOM)? Note: There are 2 correct answers to this question.

Options:

A.

Quantity

B.

Status

C.

Installation point

D.

Scrap percentage

Buy Now
Questions 12

What options does a planner have in the planning table for repetitive manufacturing? Note: There are 2 correct answers to this question.

Options:

A.

Change the assignments of production quantities to production lines.

B.

Create new production quantities.

C.

Dispatch operations to work centers.

D.

Reschedule deallocate operations.

Buy Now
Questions 13

What are the key features of using a low level code? Note: There are 2 correct answers to this question.

Options:

A.

To determine the priority of alternative components inside ATP

B.

To determine how costs are rolled up by product costing

C.

To determine the sequence in which materials are planned in MRP

D.

To determine the use of subitems inside material BOM (bill of material)

Buy Now
Questions 14

What determines whether the planned independent requirements in dem management are consumed by other requirements? Note: There are 2 correct answers to this question.

Options:

A.

Order type

B.

Requirements profile

C.

Requirements type

D.

Planning strategy

Buy Now
Questions 15

Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.

Options:

A.

Opening period

B.

Total replenishment lead time

C.

Float after production

D.

Setup time

Buy Now
Questions 16

You are a consultant on an SAP S/4HANA Cloud Greenfield project.

Which of the following aspects should you focus on to achieve maintain clean core data quality? Note: There are 2 correct answers to this question.

Options:

A.

Efficiency

B.

Accuracy

C.

Timeliness

D.

Stability

Buy Now
Questions 17

Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.

Options:

A.

You can use trigger points to automatically create rework orders via confirmations.

B.

You can use mass processing to set production orders to technically complete.

C.

You can use the production scheduling profile to automatically set orders to technically complete.

D.

You can use mass processing to read PP master data for production orders.

Buy Now
Questions 18

Your quality department detects a deviation in a raw material batch. Unfortunately this batch has already been used in production. How can you identify all affected finished goods stocks?

Note: There are 2 correct answers to this question.

Options:

A.

Use batch determination.

B.

Use the Batch Information Cockpit.

C.

Use the batch whereused list.

D.

Use batch derivation.

Buy Now
Questions 19

Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?

Options:

A.

When several operations are maintained for one product

B.

When alternative resources are used within one operation

C.

When several production versions are maintained for one product

D.

When multiple planned orders are scheduled in parallel on one resource

Buy Now
Questions 20

Your project uses process orders for the production of liquid chemicals.

What can you define to ensure that production flow only happens in suitable physically connected tanks? Note: There are 2 correct answers to this question.

Options:

A.

Resource hierarchy

B.

Resource selection

C.

Resource matrix

D.

Resource network

Buy Now
Questions 21

You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles.

Which of the following SAP Signavio solutions can be used for the remodeling?

Options:

A.

SAP Signavio Process Insights

B.

SAP Signavio Process Intelligence

C.

SAP Signavio Process Governance

D.

SAP Signavio Process Manager

Buy Now
Questions 22

How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

Options:

A.

Execute an infinite production planning run for the critical resources.

B.

Reduce the planning time interval.

C.

Determine a time period with available capacity on the planning board.

D.

Increase the capacity supply in a timephased interval.

E.

Form optimum sequences to reduce setup times.

Buy Now
Questions 23

What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.

Options:

A.

Planned order

B.

Scheduling agreement schedule line

C.

Production order

D.

Purchase order

Buy Now
Questions 24

Your company produces a finished good based on a forecast expects it to be in stock when customers order it. If customers order more than the forecasted quantity this must NOT have any impact on the production program.

Which planning strategy do you use?

Options:

A.

Assembly processing with production orders (82)

B.

Planning with final assembly (40)

C.

Planning without final assembly (50)

D.

Maketostock production (10)

Buy Now
Exam Code: C_TS422_2023
Exam Name: SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing
Last Update: Nov 13, 2024
Questions: 80

PDF + Testing Engine

$56  $159.99

Testing Engine

$42  $119.99
buy now C_TS422_2023 testing engine

PDF (Q&A)

$35  $99.99
buy now C_TS422_2023 pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 21 Nov 2024