New Year Special Sale - 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dm70dm

Note! The C1000-055 Exam is no longer available.

C1000-055 IBM QRadar SIEM V7.3.2 Deployment Questions and Answers

Questions 4

The client implemented a QRadar Network Insights (QNI), and is looking to add post-incident investigations and threat hunting activities.

What should the deployment professional recommend?

Options:

A.

An additional QRadar Incident Forensics is required.

B.

An additional QRadar Network Inspector is required.

C.

Existing appliances will suffice.

D.

An additional QRadar Flow processor is required.

Buy Now
Questions 5

A deployment professional needs to include a network inspection device in a banking organization as per the new security guidelines. Real time threat investigation has to be done along with the post-incident analysis. A QRadar Incident Forensics has been included in the design for post-incident forensic analysis.

Which devices should be chosen for the realtime analysis?

Options:

A.

Network PCAP and Flow Processor (FP)

B.

Flow Collector (FC) and QRadar Network Insight (QNI)

C.

QRadar Network Insight (QNI) and Flow Processor (FP)

D.

Flow Collector (FC) and Flow Processor (FP)

Buy Now
Questions 6

A company has specific data retention policies to keep log data online for 5 years. The current QRadar storage will not handle this amount of data.

Which are possible solutions? (Choose two)

Options:

A.

Migrate the QRadar /store/ariel file system to a larger off board storage device

B.

Implement Data Node(s)

C.

Implement Event Collector(s)

D.

Implement Flow Processor(s)

E.

Implement a high availability (HA) solution

Buy Now
Questions 7

A deployment professional needs to implement a crossover cable in the high availability (HA) environment. By doing so, this QRadar deployment isolates what kind of traffic over the crossover connection?

Options:

A.

event

B.

flow

C.

query

D.

HA replication

Buy Now
Questions 8

A deployment professional just installed new QRadar deployment which comes with a temporary license key.

How many days does a deployment professional have before the temporarylicensekey expires?

Options:

A.

35 days from the installation date.

B.

15 days from the installation date.

C.

30 days from the installation date.

D.

45 days from the installation date.

Buy Now
Questions 9

A deployment professional has been asked to ensure the system can be integrated with another system which contains lists of IP addresses and CIDR ranges in an automated manner, to allow rules to target specific communication endpoints.

Which part of QRadar is designed to hold and manage this data?

Options:

A.

Domain Definition

B.

Network Hierarchy

C.

Asset Profiles

D.

Building Blocks

Buy Now
Exam Code: C1000-055
Exam Name: IBM QRadar SIEM V7.3.2 Deployment
Last Update: Nov 30, 2023
Questions: 60
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 27 Dec 2024