Questions 4

You plan to perform a bulk move operation to change the issue type, from Story to Task, on several issues in the DEV project. As a result some other information on the issue may need to change, in addition to the issue type. Identify one thing that might need to change.

Options:

A.

issue links

B.

components

C.

status

D.

work logs priority

Buy Now
Questions 5

You need to communicate some important news with everyone in the Managers project role in lira but not other users What Jira feature should you use?

Options:

A.

Announcement Bonner set to Private

B.

Send email feature

C.

System dashboard

D.

Announcement Banner set to Public

E.

Default user preferences

Buy Now
Questions 6

You are configuring a new project using only native lira functionality and without Marketplace apps. Which requirement can be satisfied?

Options:

A.

Different issue types should have different "Create Issues" penurious.

B.

Different issue types should use different components.

C.

Different issue types should have different required fields.

D.

Different issue types should use different options for a custom field.

Buy Now
Questions 7

All lira projects share all their schemes andmust remain that way

Browse Projects permission is currently granted to application access.

You must evaluate requirements to see if the TIP team should be set up as a group or a project role.

Which requirement necessitates the use of a project role?

Options:

A.

All TIP members should be able to create filter subscriptions for the entire team.

B.

All TIP members need to be able to move issues.

C.

Only some TIP members need to create shared dashboards.

D.

Only two TIP members should be able to see secured issues.

E.

Only some TIP members can delete issues and they differ in each project.

Buy Now
Questions 8

Currently, users log time and enter a comment on a transition screen when dosing issues. Now, they want the comment to be copied automatically to the work log description. Identify the configuration area that needs to be modified.

Options:

A.

workflow condition

B.

global permissions

C.

issue layout

D.

field configuration

E.

global time tracking settings

Buy Now
Questions 9

DEV-1 and DEV-2 are epics.

You must write a JQL query that returns issues in those epics.

Which JQL query returns the correct results?

Options:

A.

issue in IWttdlssues(DEV-1( DEV-2)

B.

issue in linkedlssues("DEV-1 Epic:") OR issue in linkedlssues("DEV-2'',-Epic")

C.

issueLinkType in (DfcV-1. DEV-2)

D.

''Epic Link" in (DEV-1, DEV-2)

E.

type = Epic and key in (DEV-1, DEV-2)

Buy Now
Questions 10

You need to create an automation rule as follows:

• when a Story is transitioned to In Progress

• if it has d parent Epic

• then assign all of the Ston/s linked issues to the same assignee as the Story itself

The final component of the rule is the 'Assign issue" action, corresponding to the third bullet above. What value should you choose from the "Select a user" dropdown?

Options:

A.

Copy from Epic

B.

Automatic

C.

User who triggered the event

D.

Copy from parent

E.

Copy from trigger issue

Buy Now
Questions 11

The project Default Assignee in project OMEGA is Unassigned.

Components in that project are configured as shown;

ACP-100 Question 11

Why might a newly-created issue remain unassigned?

Options:

A.

You selected no components and left Assignee as Automatic.

B.

You selected both components and left Assignee as Automatic.

C.

You selected no components and set Assignee to Susan.

D.

You selected only the Engine component and left Assignee as Automatic.

Buy Now
Questions 12

Developers must edit the Time Spent they previously entered on their assigned issues. They should not have more permissions than required. Which permission is NOT required?

Options:

A.

Assign Issues

B.

Browse Projects

C.

Assignable User

D.

Work On Issues

E.

Edit Own Workdogs

Buy Now
Questions 13

A custom field called Localization of type SelectList (single choice) is available on every issue in lira with the same set of options. You just created a new project with a shared configuration, but you want the Localization field to have different options in this project. Which configuration must be updated?

Options:

A.

custom field context

B.

field configuration

C.

field configuration scheme

D.

screen

E.

issue type scheme

Buy Now
Questions 14

Currently, the workflow automatically assigns issues to Bella whenever they transition from Open to Review. Now. the workflow should assign them to Arthur instead. Which workflow element must be changed?

Options:

A.

alidator

B.

post function

C.

trigger

D.

transition property

E.

condition

Buy Now
Questions 15

Your project has issue-level security configured with two security levels. However, Tamara can only select one of the levels. Identify a possible reason why.

Options:

A.

A workflow property is limiting the available options.

B.

The other level is configured for different issue types.

C.

She is not in a group or project role.

D.

She does not have the Set Issue Security permission.

E.

She does not have the Edit Issues permission.

Buy Now
Questions 16

You associated your project with a new priority scheme.

ACP-100 Question 16

Identify what else may need to be updated as a direct result.

Options:

A.

issue collectors using a custom template

B.

default values in field context

C.

field configuration where priority was required

D.

swimlanes by queries

E.

statistics gadgets based on priority

Buy Now
Questions 17

Caleb was recently assigned to several issues in the DFV project but did not receive email notifications about the assignment.He received notifications about other changes to DEV issues. Identify a possible reason.

Options:

A.

Assignable User permission

B.

Assign Issues permission

C.

Browse Projects permission

D.

Issue Assigned event

E.

Issue Updated event

Buy Now
Questions 18

Tom approaches you with a problem.

He is able to see the custom field Sales Cycle when viewing an issue but not when editing it.

What is the cause of the problem?

Options:

A.

The field is hidden in the field configuration.

B.

The field is missing from the screen associated with the Edit Issue operation.

C.

The field is missing a custom field context.

D.

Tom does not have the correct permission.

E.

The field is not on the correct transition screen.

Buy Now
Questions 19

Alana configured theCreate a new issue or add a comment to an existing issue" mail handler for a particular project. Some issues created by the handler are left unassigned while others are assigned to various team members. What is the cause?

Options:

A.

"Forward Email" setting in the mail handler

B.

"Catch Email Address" setting in the mail handler

C.

Create Issues" permission in the project

D.

"CC Watchers" setting in the mail handler

E.

"CC Assignee" setting in the mail handler

Buy Now
Questions 20

The ASTRO project team wants an issue to be locked when the issue s status is Done. Done issue should no longer be editable. Whichelement must be configured?

Options:

A.

permission

B.

property

C.

validator

D.

condition

E.

trigger

F.

post function

Buy Now
Exam Code: ACP-100
Exam Name: Jira Administration for Data Center
Last Update: Apr 25, 2025
Questions: 67

PDF + Testing Engine

$49.5  $164.99

Testing Engine

$37.5  $124.99
buy now ACP-100 testing engine

PDF (Q&A)

$31.5  $104.99
buy now ACP-100 pdf
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 26 Apr 2025