Winter Sale - Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dpm65

Note! The 76940X Exam is no longer available.

76940X Avaya Converged Platform Support Exam Questions and Answers

Questions 4

A support engineer logs into Avaya Orchestrator and clicks on the Service Availability icon for the Power Supply of a G450 device.

What information is the engineer looking for?

Options:

A.

The current state of the power supply (OK, Warning, Unknown or Critical).

B.

The amount power (in Watts) that the power supply is using.

C.

A percentage breakdown of the state of the power supply (OK, Warning, Unknown or Critical) over a period of time.

D.

A list of other services that are available for the G450 device.

Buy Now
Questions 5

Which statement about the LifeCycle Manage Workbook (LCM) and any time there is a change made to the ACP 4200 implementation is true?

Options:

A.

The LCM only needs to be updated when hardware devices are changed.

B.

Retrieve the LCM from ACP 4200 support prior to making any changes.

C.

The LCM is only needed when receiving the ACP 4200.

D.

Update the LCM with all changes and submit it via email to podfxsupport@avaya.com.

Buy Now
Questions 6

A support engineer is upgrading a PodFX 3.1 system to ACP 4200 4.0. The system has two pairs of ServerTech PDUs.

Which statement about the PDU firmware file describes the upgrade process that the engineer needs to follow?

Options:

A.

It will need to be uploaded to all 4 PDUs.

B.

It will need to be uploaded to each PDU Management Web Interface.

C.

It will need to be uploaded to one PDU. This PDU will then distribute the file to the remaining 3 PDUs.

D.

It will need to be uploaded to Orchestrator. Orchestrator will then distribute the file to the 4 PDUs.

Buy Now
Questions 7

To view a graphical representation of the ACP 4200 and its individual components, where would a support engineer navigate?

Options:

A.

System Manager > Inventory

B.

Pod Visualization Manager > Home Dashboard

C.

Servertech PDU Web Interface > Equipment View

D.

Avaya Orchestrator > Rack Dashboard

Buy Now
Questions 8

A maintenance window had been scheduled to allow for the upgrade of the firmware of one of the VSP switches in the ACP. However, steps were not taken to avoid receiving unnecessary notifications during this period. As a result, when the upgrade process started the VSP switch shows multiple critical alerts.

At this point, what would a support engineer do to reduce the amount of these unwanted alerts?

Options:

A.

Use the Post-Event Downtime feature in Orchestrator.

B.

Use the Mass Acknowledgments feature in Orchestrator.

C.

Use the Recurring Downtime feature in Orchestrator.

D.

The engineer will have to wait for the upgrade process to complete.

Buy Now
Exam Code: 76940X
Exam Name: Avaya Converged Platform Support Exam
Last Update: Nov 30, 2023
Questions: 56
dumpsmate guaranteed to pass
24/7 Customer Support

DumpsMate's team of experts is always available to respond your queries on exam preparation. Get professional answers on any topic of the certification syllabus. Our experts will thoroughly satisfy you.

Site Secure

mcafee secure

TESTED 04 Dec 2024